Loading...
HomeMy WebLinkAboutBLD00-133Watamsn & Katzfluilding 181 Quinty Strttl, Suite 301 Pon Tawmend, WA 98368 Planc: (360j 379-3208 Fan: (360)385-7675 CITY OF PORT TOWNSEND • CONSTRUCTION PERNIIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number:. I3LDUU-133 Issued: 7/7/00 Parcel Number: 001-043-024 Job Address: 2633 Iw Street Zoning: RR=II Type: V-N Occupancy: R_3 Nature of Work: SFR Kitchen Addition with Deck. Owner: Paul and Jean Nolette Contractor: Same as Owner GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMTTS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 RE UIRED INSPECTIONS APPROVED/DATE FOOTINGS Setbacks Footings Forms Reinforcement Porch Footing '~~ ~/ 3f ~ t'( FOUNDATION Stem Wall ~~ ~~~~/Mc ~ Forms Reinforcement Anchor Bolts & Washers Vents - 3 required Alternate Braced Wall Panel Holdown Hardware FLOOR FRAMING Joists 1~~~ f~ /~ ` ( - Blocking ~ Positive Connection Treated Wood to Concrete Anchor Bolts & Washers Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 3 Pentit KBLDW-133 RE UIRED INSPECTIONS APPROVED/DATE PLUMBING / Rough-In (D-V-T & Clean outs) f ~6 ~~~ Water Supply Water Hammer Arrestor at dishwasher Hose Bibs (backflow protection required) Pipe Insulation (R-3) Pressure Reduction Valve if> 80 psi MECHANICAL ~ ~/~ Kitchen Fan Environmental Air Exhaust dulling (w/ backdraft dampers), insulation (R-4) and terminus (located 3' from opening) FRAMING Walls 1®`~0~~ ~ ~/ (.,~ Ceiling Roof Attic Venting - at eave Window U-factor - .65 or better NFRC Iabe1 shall be on windows at time of Inspection Air Seal Door U-factor - .40 or better Truss Positive Connection Fire Blocking Weather Resistive Barrier , ~n ~St~S ~G~1711~/f~ ~ l q LL~ !0 l ~OD DRY WALL NAII.ING Walls ~ ~J/2 D,D~ ('p `" Ceiling ~ FINAL House Numbers -check for 5" numbers Plumbing MechanicaUHeating Smoke Detectors throughout Final -Building Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 3 u P~~ aatooa~ss • ENERAL CONDITION I. Contractors working on this project are required to have a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2, Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3. A minimum of twenty-four hours notice is repaired. Public Works aaaroval must be received urior to schedulin¢ the Building Department's 5nal inspection. 7. Final Inspections are required prior to occupancy; a Certificate of Occupancy is required fora non- residential project. 8. All building permits ezpire if no progress has been made within siz months, or if no inspections are done 6y the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal & approval prior to making changes in the field. Contact the Building Department aQ 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 3