Loading...
HomeMy WebLinkAboutBLD00-131 Waterman & Katz Building 181 Quincy Skit, Suite 301 Pon Towmserd, WA 96368 PMne: (360) 3A-3208 Fax (360) 385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection .lob Address: 275 Grant Street Zoning: R-11 Type: V-N Occupancy: R-3/U-1 Total Occupant Load: 812 Nature of Work: Construct Single-family Dwelline with earaee Permit Number: BI~DO~-131 Issued: 7121/00 Parcel Number: 948-329-201 Contractor: B & D Construction Bob Fitzpatrick 385-4451/301-0973 cell Owner: Richard and Madeleine Thompson GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 ****All engineered details renuire inspection prior to cover**** RF,OTTTRF.D TNSPECTIONS APPRO VED/DATE TEMP EROSION & SDM'T CONTROL See General Condition #2 Silt Fence as needed per street development Drive Off Mat to prevent sediment from leaving the site FOOTINGS Setbacks ~^~ 71~~~0 Footings Forms Reinforcement Continuous Interior Footings Por - rs ~~~ ~`/ Call 48 hours before you dig for utility line locates I-800-424-5555 Page 1 of 5 PermiIMBLD00.131 ` RE UIRED INSPECTIONS APPROVED/DAT E FOUNDATION Stem Wall Cripple Wall Forms Reinforcement Anchor Bolts w/ 2" x 2" x 3/16" washers Per engineering @ garage door wall Vents - 21 required Crawl Access Beam Pockets Engineered holdowns FLOOR FRAMING NOTE: Engineered TJI joist plan shall be on-site for the inspector at inspection time ~~~~~ Joists Cripple Wall & Sheathing Blocking Positive Connection Treated Wood to Concrete Anchor Bolts & Washers FDN Vents - 21 required PLUMBING: Rough-In (D-V-T & Clean Outs) ~ ~ ~('~ Water Supply Water Hammer Arcestor @ clothes & dishwasher Hose Bibs (backflow protection required) Pipe Insulation (R-3) Pressure Reduction Valve if > 80 psi Water Heater R-10 under if electric Seismic Restraint -strap @ 1/3 points 18" A. F. F. Pressure relief valve drain to exterior; 6" - 24" above ground Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 5 Permit M BLD00-131 REQUIRED INSPECTIONS APPROVED/DATE • MECHANICAL Oil Furnace -manufacturer's installation instructions to be on-site at time of inspection Combustion Air Exhaust Duct Insulation - R-8 Whole House Fan -main bath Source Specific Fans Environmental Air Exhaust ducting (with backdraft dampers), insulation (R-4) and terminus (located 3' from opening) n J ~ / /~~~ (/X/l// ! ( l FRAMING: NOTE: Engineered nailing for shear walls ` ~ /f l~~~DO l//'lV requires inspection prior to cover Walls Engineered Shear Walls %: " OSB 8d 4 " o. c @ master bedroom rear wall %s"OSB 8d 6" o.c. all other exterior walls Roof -engineered truss plan to be on-site at time of inspection Engineered Roof Sheathing %s"CDX 8d 6" o.c. field and edges Attic Venting -gable end & eave Ceilings Engineered beams & headers Windows -escape Windows -safety glazing Windows Ufactor - .65 or better NFRC window sticker must be on windows & doors at inspection time Air Seal Fresh Air Intake (window) Door UFactor - .40 or better RaftedT'russ Positive Connection Fire Blocking Weather Resistive Barrier INSULATION Floor (R-19) / ~~ /(~/~ ~/G~ t~ Wall (R-19 ) Ceiling (R-30 ) Baffles Vapor Barrier: paint Crawl Space - 6 mil black poly Call 48 hours before you dig for utility line locates I-800-424-5555 Page 3 of 5 Prnnit # BID00-131 REQUIRED INSPECTIONS APPROVED/DATE DRY WALL NAILING ---- Walls ~ /,I Ceiling ~ ~~ ~ ~ , Garage/House Occupancy Sepazation Engineered Interior Braced Wall Panel S/8 " Type X GWB @ walk-in closet/stair wall FINAL Public Works Sign-Off ~ ~ ~~~ ~ n House Numbers - 5" ~/ Plumbing MechanicaUHeating Insulation Certificate Vapor Barrier Paint Certificate Smoke Detectors Fina- -Building GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. .J 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your projeM until Public Works requirements have been completed and inspeMed. For Public Works inspection ca11385-2294, press 3. A minimum of twenty-four hours notice is required. Public Works anaroval must be received prior to scheduline the Buildin¢ DeaartmenPs final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- residential project. Call 48 hours before you d'eg for utility line locates 1-800-424-5555 Page 4 of 5 Permit k BLD00.131 ' 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval prior to making changes in the Feld. Contact the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 5 of 5