Loading...
HomeMy WebLinkAboutBLD00-129Wetermeo & Kelz auild{ng 1S1 Qulury Street, Suaa }01 PoA rewueeud. WA 98765 Phone: 360-3793205 Fee }60387-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLDOO-129 Issued: 9/27/00 Parcel Number: 989705202 Job Address: 327 Jackson Street Zoning: RR_II Type: VV=N Occupancy: UU=1 Total Occupant Load: N/C Nature of Work: Add windows to existine workshoe Owner: Jana Allen 385-1080 Contractor: Same as Owner GENERAL CONDITIONS APPLY: See last aaee SEPARATE PERMITS REOUHiED: Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702 RF.ni1iRF,11 TNSPECTIONS APPROVED/DATE FRAMING - - -- -- - - ~ ~ Floor beam @ loft - I }/d' x 9 '/z" versa lam ~ ~/Z ~~ Nailing at F=2 plate: 8d @ 6" o.c. "X" bracing/OSB at end wall panels per engineering "X" brace roof or sheath with''/2" OSB, 8d @ 6" o.c. Engineered 4" x 8" header at east window Solid cripple to beam below at F-1 gable end per engineering Blocking Positive Connections PLUMBING Existing clothes washer and dryer FINAL Building Numbers - check for 5" numbers / ~~~/ Final -building CALL 48 hours before you dig Tor Utility line locates 1-800-424-5555 Page 1 of 2 Building Permit #00-129 • GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall. be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and al- deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to schedulin>? the Buildine Department's final inspection. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a non-residential project. 8. All building permits expire if no progress has been made within siz months, or if no inspeMions are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 379-5086 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2