Loading...
HomeMy WebLinkAboutBLD00-125Waterman 8: Kali Building I81 Quincy Stree4 Suite 301 Port rnwnend. WA 98363 PMm: (360) 379-3208 Faz: (360) 385.7675 CITY OF PORT TOWNSEND ~~ ', CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLDO~-125 Job Address: 1704 Discovery Road Nature of Work: Erect Church Steeale Owner: San Juan Baptist Church 206-284-2746 Issued: 6/30/00 Parcel Number: 948316501 Zoning: RR=II Type: V-N Occupancy: U_2 Occupant Load: N/A Contractor: TBD -see Condition #1 GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMTTS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 FRAMING/FINAL Engineered Connection -all elements must be exposed and visible for inspection (4) 3/I' bolt or threaded rod w/ 2" x 2" x 3/16" washer Trusses -engineered truss plan to be on-site at time of inspection 1 '/I' x 5 '/z" versa-lam: extend (2) trusses past mounting points Final -Building zl2l~~°~ ENERAL CONDITION 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection ofadjacent properties. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 r~~uacnoo.iu 3. All elements of engineering including- nailing, holdowns, sheathing, and alternate braced wall panels • (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294, press 3. A minimum of twenty-four hours notice is required. Public Works approval must be received arior to scheduling the Buildin¢ Department's final inspection. 7. Final Inspections are required prior to occupancy; a Certificate of Occupancy is required fora non- residential project. 8. All building permits ezpire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at (east one inspection per year to keep your building permit active. 9. Revisions require submittal & approval prior to making changes in the field. Contact the Building Department @ 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. i Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2