Loading...
HomeMy WebLinkAboutBLD00-123Wstamm & Kazz Building 187 Qunry Street Suite 301 Port Townsend, WA 98366 Phone (360) 379-3208 Fax (360) 385-7675 CITY OF PORT TOWNSEND i CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLDOO-123 Issued: 6/27100 Parcel Number: 974700104 Job Address: 1248 31'` Street Zoning: RII Type: VV=N Occupancy: R/3 Total Occupant Load: No Chance Nature of Work: Remove plaster replace with GWB, re- insulate and rewire & install new plumbine. Owner: Kevin Lovell Contractor: Owner GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 E UIRED INSPECTIONS APPROVED/DATE R DEMOLITION All construction debris to be deposited in Jefferson County Landfill or other approved location in accordance with all local, state and federal laws. PLUMBING Dwv ~ Water Supply ~ ~~~ Water Hammer arrestor MECHANICAL Environmental Exhaust Fans g~~~/DU „ /J l t~ .Range Hood FRAMING ; ~~n , INSULATION Fill exposed cavities /~ /y // ~ 7 (~f" . Page 1 of 2 Pvmit NBLD00-123 DRYWALL NAILING Walls Ceiling 2 9~ ~-~~ FINAL ~ Smoke Detectors (hard wired) ~ ~ Building Numbers Electrical Final Inspection (L&I) Fire Department Final Inspection 9/ ~ n g ~ Building Department // ~D (.l~ GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels • (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294, press 3. A 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for st least one inspection per year to keep your building permit active. 9. Revisions require submittal & approval prior to making changes in the .field. Contact the Building Department @ 379-3208 prior to making changes to the approved plans. \s 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. • Page 2 of 2