HomeMy WebLinkAboutBLD00-122Waterman & Katz Building
181 Quincy SC, Sui[e 301
Port Townsend, WA98368
Phone (360) 3793208 Fax (36D) 379-6923
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLDOO-122 Issued: 6!20100 Parcel Number: 965700801
Job Address: 1011 Cass Street Zoning: RR=II Type: VV=N Occupancy: RR=3
Total Occupant Load: No Change Nature of Work: Remove existint=_ wood shin¢le roof,
reolace sheetine and install asphalt shingle roof.
Owner: Robert Livingston
Contractor: Edward Hubner
GENERAL CONDITIONS APPLY -SEE LAST PAGE
RE LTIRED INSPECTIONS
APPROVED/DATE
DEMOLTTION
Ali construction debris to be deposited in
Jefferson County Landfill per plans or other
location in accordance with all local, state
and federal laws.
SHEATHING ~ 1
~~ ~f
7/16" OSB requires 8d @ 6" o.c. edges & ~j/
i~
12" field or 1'/1' staples @ 6" o.c. edges and
field.
ROOF VENTING
Net free ventilation area shall not be less than
lsf/150sf of the area of the space ventilated,
if80 percent ofthe required ventilation area
is located at least 3' above the eve or cornice
vents the net ventilation azea may be
lsf/300sf. Openings shall be covered with
corrosion resistant'/." mesh.
FINAL
House Numbers - 5" numbers of contrasting
color posted neaz main entrance of house and
visible from street per City Ordinance
Final -Building
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
Pmnit #BLI)00-122
GENERAL, CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's
r~istration number and a City business license. Failure to provide proof of this documentation prior to
work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected
prior to beginning construction; ca11385-2294, press 3. Measures shall include installation of silt
fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept
free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching,
plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once
construction is complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re-inspection is required after inspection report corrections are completed.
b. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3.
~.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon-
residential project.
8. All building permits expire if no progress has been made within siz months, or if no inspections are
done by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal & approval prior to making changes in the field. Contact the Building
Department @ 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 2