Loading...
HomeMy WebLinkAboutBLD00-120Wnlermm & Kali Building 183 Qulney Strce4 Suae 301 PeR Townund, WA 98}68 Phone. 360J79-3208 Fa:360J85-7675 • CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLDOO-I2OR-2 Issued: 7114/00 Parcel Number: 948313803. Job Address: 1403 23rd Street Zoning: R_II Type: VV=N Occupancy: RR=3 Total Occupant Load: NC Owner: Tim and Teresa Hoffman 385-5313 Scope of Work: Revision #2 Change floor framing to support foists on 4X8 girder, Change floor plan relocate laundry and bath. Contractor: Same as Owner GENERAL CONDITIONS APPLY: See last page SEPARATE PERMITS REOUII2ED: Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702 RF.f17TiRF.n iNSPF.C'.TiONS APPROVED/DATE FLOOR FRAMING Girders Joists Post Positive Connection Ventilation FINAL See on final ermit for final ins ection CALL 48 hours before you dig for Utility line locates 1-800-424-5555 Page 1 of 2 Building Permit #00.120R-2 GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc.. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner ar owner's agent shall review and oversee correction of any and all deficiencies noted by y'j+ required inspections. - 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294, press 3. A minimum of twenty-four hours notice is required. Public Works aooroval must be 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a non-residential project. 8. All building permits expire if no progress has been made within siz months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval rior to making changes in the field. Contact the Building Department at 379-5086 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2 Wn6ervun & Kab Buad4~g 18l QWnry Slree4 SWIa 301 Perl7awmend. WA 98368 Pho~u: 3603793208 Fna 36pJgS-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLDOO-120R-1 Issued: 7/03/00 Parcel Number: 948313803 Job Address: 1403 23rd Street Zoning: RR=II Type: V-N Occupancy: R_3 Tota! Occupant Load: add 2 Nature ofWark: Revision #1: combine two bedrooms into one: add_ utility room door and french door from bedroom Owner: Tim and Teresa Hoffman 385-5313 Contractor: Same as Owner GENERAL CONDITIONS APPLY: See last passe SEPARATE PERMITS REQUIRED: Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702 See Original Inspection record jor required inspections NFRC sticker must be on windows and doors at time oflnspection . CALL 48 hours before you dig for Utility line locates I-800-424-5555. Page 1 of 2 Building Permit M00-120R-1 GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; cal1385-2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept tree of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner ar owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. `~ 5. Re-inspection is required after inspection report corrections -are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3. A minimum of twenty-four hours notice is required. Public Works aoarovab must be 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a non-residential project 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval nrior to making changes in the field. Contact the Building Department at 379-5086 prior to making changes to the approved plans. 10. YOST THIS PERMIT ON-SITE WITIi THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2 wrierm>n & x.a ewamq Lei Qwney slree~, sn14 sot Porl iowmea0. WA 98768 Phone: 3603793208 Fa: 7603817675 CITY OF PORT TOWNSEND \J ' CONSTRUCTION PERMIT & INSPECTION RECORD ' THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLDOO-I20 Issued: 6121/00 Parcel Number: 948313803 Job Address: 1403 23rd Street Zoning: R_II Type: VV=N Occupancy: R_3 Total Occupant Load: add 2 Nature of Work: Convert earase to -iyina space (bedrooms & bath) Owner: Tim and Teresa Hoffman Contractor: Same as Owner 385-5313 GENERAL CONDITIONS APPLY: See last uaae SEPARATE PERMITS REQUIRED: Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702 RF(1TTTRFTI TNCPF.C'TTONS APPRnVED/DATE FOOTINGS Setbacks - no change Interior Footings Forms Reinforcement 7~l n~~ FOUNDATION Stem Wall Forms Reinforcement Anchor Bolts & Washers Positive Connection Girder Post-to-Foundation Wall Vents - S required Crawl Access FLOORFRAMING -Engineered BCI plan shall ~~ ~ ~/~ ~~ be on-site at time of inspection ~ . Joists /` Blocking Positive Connection Treated Wood to Concrete Anchor Bolts & Washers CALL 48 hours before you dig for Utility line locates 1-800-424-5555 Page 1 of 4 Building Permit #00.120 REQUIRED INSPECTIONS APPROVED/DATE PLUMBING Rough-In (D-V-T & Clean outs) Water Supply ~/~ Pipe Insulation R-3 0 Pressure Reduction Valve if > 80 psi Water Heater seismic restraint: 2 straps @ I/3 points Pressure Relief Valve drain to exterior, terminate 6" -24" above ground MECHANICAL WholeHouse Fan @ utility room ~~ f O ~ an 0~~ ' Source Specific Exhaust Fans @ bathroom (50 cfm), V V Environmental Air Exhaust ducting (with backdtaft damper), insulation (R-4) and terminus (3' from openings into building FRAMING Walls ~ ~ _J~ „ (~ a I ( ~J Roof- existing trusses { `.~ RaRer/truss positive connection Attic venting Attic Access .Posts, beams and headers Windows U-factor..40 or better NFRC sticker must be on windows at time of Inspection Air Seal Fireblocking Weather Resistive Barrier INSULATION Floor (R- ~Q) (/ / Q~ Walls (R- 19) VV 0 / VV Ceiling (R- 38 ) Baffles Vapor Barrier -paint Ca1148 hours before you dig for utility line locates I-800-424-5555 Page 2 of 4 Building Permit1100-120 U RF.C1i1iRF.D INSPECTIONS APPROVED/DATE DRYWALL NAILING Walls Ceiling ~~~/ J /C~~ ~ c/ FINAL House Numbers - check for 5" numbers Plumbing Mechanics! Insulation Certificate (if applicable) Vapor Barrier Paint Certificate Smoke Detectors throughout -battery powered okay rn existing construction Final -building GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils ezposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3. A minimum of twenty-four hours notice is required. Public Works auprova_I_mus_t_be received prior to scheduling the Building Department's final inspection. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 4 Building Permit #00-@0 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-residential project. 8. All building permits ezpire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 379-5086 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. ~~ Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 4 of 4