Loading...
HomeMy WebLinkAboutBLD00-119Wolermen & Kota Building 181 Quinq Stree4 S Wle 301 Port Townsend, WA 98368 Phone: 3603793208 Fe: 3 6 0 38 3-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLDOO-119 Issued: 6/21/00 Parcel Number: 989703904 Job Address:- 1038 Water Street Zoning: C-HI Construction Type: VV=N Occupancy: AA=3 Total Occupant Load: NA Use of Building: Restaurant Nature of Work: Install three (31 retractable awninQS above front windows. Owner: Pacific & Artic. Inc. dba The Public House Contractor: NW Awnin¢ & Fabrication. Inc. (206) 285-2941 GENERAL CONDITIONS APPLY - 5EE LAST PAGE RF,OiTiRF.D iNSPECTiONS APPROVED/DATE FRAMING Attach each awning frame to building wood frame members with 3/819 a 3" lag screws, two on each end and at top, and each awning arm to wood frame members with'/," a 3" lag screws, two on each. See attached drawing. FINAL HPC Color requirements -red or buff awning color approved. NOTE: Framing Inspection may be done at Final Inspection ijall elements are visible Call 48 hours before you dig for Utility line locates 1-800 424-5555 Page 1 of 2 Petxni[ H BLD00-119 GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries Contractor's Registration Number and a City Business License. Failure to provide proof of this documentation PRIOR to work may result in job shutdown while this is accomplished. 2. TESC -Temporary erosion and sediment control measures shall be installed on-site and inspected prior to beginning construction; cai1385-2294, press 3.1Vleasures shall include installation of silt fencing and graveled construction entrance (see attached details). Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc., once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All engineered elements including sheathing, nailing, holdowns, ABWP's (alternate braced wall panels), etc., requires inspection PRIOR to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after Inspection Report corrections are completed. 6. The Building Department is unable to pass Final Inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3. A minimum of 24 hours notice is required. Public Works approval must 6e received prior to scheduling tfie Building Department's Finat Inspection or issuing a Temporary Certificate of Occupancy. 7. Final Inspection and Certificate of Occupancy (nonresidential only) required PRIOR to occupancy. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal & approval prior to making changes in the field. Contact the Building Department @ 379-3208 prior to making changes to the approved plans. 10. POST TffiS PERMIT ON-5TTE WITH THE APPROVED PLANS. Call 48 hours before you dig for Utility line locates 1-800 424-5555 Page 2 of 2