Loading...
HomeMy WebLinkAboutWashington State Department of Health - City of PT and PT Paper Company Water Project EXHIBIT B LETTER OF SUBMITTAL I. Applicant Name: City of Port Townsend II. Applicant Address: 250 Madison St., Port Townsend, WA 98368 III. Applicant Contact Information a. Name and Title: Ian Jablonski, Water Resources Manager b. Telephone: 360-379-5001 c. Email: ablonski@cityofpt.us IV. Individual Project Information (describe each project) a. Unique project name: Port Townsend Paper Corporation Potable Water Connection and System Consolidation b. The name and identification number of the existing Group A public water systems involved in the consolidation activity, including the applicant if the applicant is a Group A water system: City of Port Townsend 69000R and Port Townsend Paper Corporation 16320A. c. The type of consolidation activity to be pursued (for example, "Pay connection fee(s)" or"Fund a feasibility study"): Funding will be used to complete preconstruction activities including: design of the water line connection and backflow prevention system, permitting fees, environmental review, cultural and historical review, and preparation of bid documents. d. The estimated cost: $30,000 e. General description of the final outcome of consolidation activities if the proposed activities and objectives were actually implemented and achieved: This project will ensure that the 300 employees and visitors to the Port Townsend Paper Mill receive safe, adequately treated potable drinking water. The grant will fund the design and engineering for a water system connection between the City of Port Townsend water distribution system, currently serving a population of 9,954, and the Port Townsend Paper Corporation potable water system, serving approximately 300 employees. The connection will consolidate the mill water system as a direct service customer of the City of Port Townsend system. The City will be applying for a 2015 Drinking Water State Revolving fund match grant for the system consolidation. f. Narrative describing the level of interest and expected level of participation of each public water system participating in the proposed consolidation activity. Include any agreement-in-principle, interlocal agreement, or other written documentation indicating an intent to complete the consolidation. Both the City of Port Townsend and Port Townsend Paper Corporation (Mill) have committed to consolidating the water systems (see attached letter). The City's 2014 Water System Plan identified the need for the connection to provide the Mill adequately treated water. The point of treatment at City January 2015 Page 8 of 10 Lake, which currently serves both the City and Mill,will be replaced with a water filtration treatment facility within the City of Port Townsend. A letter of commitment from the Mill for the consolidation is attached. The City will be submitting a DWSRF application for final construction of this project, and the Mill will be a cooperating partner in that effort. The Mill will be de- activating their non-complaint potable water system connection as part of this project. g. The health, safety, sustainability, and/or water system compliance issue(s) that would be solved through consolidation of water systems or water system ownership. The Port Townsend Paper Corporation water system currently does not receive adequate treatment for the Surface Water Treatment Rule (SWTR) and Long Term 2 Enhanced.Surface Water Treatment Rule (LT2ESWTR) compliance. The City of Port Townsend is constructing a water filtration treatment facility that will be operational by October 2016 which will provide adequately treated water for the mill potable requirements. h. Water system planning status (for example, "A water system plan has been approved by us within the last 6 years"; or"A Small Water System Management Program has been approved by DOH"). A City of Port Townsend water system plan was approved by the DOH in 2014. i. Any other information we need to accurately score each funding project. See the scoring criteria in Exhibit C. r Signature ' f Date I i January 2015 Page 9 of 10 EXHIBIT A QUESTIONNAIRE Has your entity had a contract terminated for default due to non-performance or poor performance in the last five years? If so, explain below. No. Is your entity presently debarred, suspended, proposed for debarment, declared ineligible or voluntarily excluded from receiving Federal funds by any Federal department? Is so, explain below. No. )Z�/ Dated January 2015 Page 7 of 10 9ftLYr 1 1-6-2015 To: Ian Jablonski Re: Potable water system at Port Townsend Paper Corporation Ian, Port Townsend Paper Corporation, PTPC,intends to tie into the City of Port Townsend's water system to meet the needs for potable water at the PTPC facility.We are committed to having this tie in complete and in service by 10-1-2015. Regards, Yvonne Starkey ` PTPC water system manager ` '"