HomeMy WebLinkAboutBLD00-116Wsusman $ ICalzBuilding
I81 Quincy SYee4 Suite 301
PoM1 iow~uend, Wq 98368
Phom:(360)399-3208 Fac (360)365-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspecfion
Permit Number: BT.D~~-116 Issued: ti/16/00 Parcel Number: 989710304
Job Address: 530 Adams Street Zoning: R_H Type: V;N Occupancy: U-1
Total Occupant Load: 1 Nature of Work: Construct temporary storage building (yurt)
Owner Jon Pobst
Contractor: Same As Owner
GENERAL CONDITIONS APPLY -SEE LAST PAGE
NOTE: Structure is permitted temporarily for storage for a period not to exceed 180 days. Exceptions
and extensions require approval from the BCD Director prior to expiration of the 180-day period.
FRAMING/FINAL
Setbacks
Manufactured Home Anchor Straps - 4 places
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
Pmnit#BLD00-116
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; call 385-2294, press 3. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt
debris. Soils ezposed during construction shall be temporarily stabilized with mulching, plastic sheeting,
etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is
complete. Applicant is responsible for protection of adjacentproperties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.--
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11 38 5-2 294, press 3. A
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
8. All building permits aspire if no progress has been made within siz months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal and approval prior to making changes in the Seld. Obtain revisions from the
Building Department (379-3208) prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates
I-800-424-5555
Page 2 of 2