Loading...
HomeMy WebLinkAboutBLD00-114Waterman 8c Katz Building 181 Quincy Street Suite 301 Port Towmend, WA 98368 Phone (360)385-7609 Fez (360)385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLDOO-1 ~4 Issued: 8/07/00 Parcel Number: 951-909-501 Job Address: 4250 Elmira Street Zoning: RR=II Type: V;N Occupancy: R-3 Total Occupant Load: 2 Owner: Haden Starbuck Contractor: Same as Owner GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 RF.f1TTTRF.TI TNRPF.fTTONS APPRnVED/DATE TEMP EROSION & SEDIMENT CONTROL Inspection required prior to footings -See General Condition No. 2 Silt Fence Drive Off Mat to restrict sediment from leaving the site GROUNDWORK PLUMBING / „G~ ,cl.fl Pressure Test ~ l (/ i CT v Pipe Joints Exposed Pipe Bedding ' SLAB Setbacks / ~(~ r/~ Forms Monolithic Slab Foundation Thickened Footings Reinforcement Anchor Bolts & Washers Insulation -R-10 @ perimeter and under entire slab Radiant Heat Tubing UFER Nature of Work: Construct single-family residence Page 1 of 4 Huildioe Pemilt /BLD00.11a REQUIRED INSPECTIONS APPROVED/DATE INSULATION Slab (R=10) Walls (R_21) Ceiling (R-30 vault ) Baffles VaporBamer: paint (walls)/plastic (ceiling) (~' ~v ~`.~~~ ~ ~ ~ \ DRY WALL NAILING / / /) Q Walls ~ ®, / ("r,Y (~f Ceiling ~ l f FINAL Public Works Sign-Oft' House Numbers - 5" numbers ~ / ¢~ Plumbing !i/ 7i °~~ Mechanical/fleating Insulation Certificate VaporBarrier Paint Certificate Smoke Detectors Final -Building I. Contractors working on this project are required to have a Labor & Industries contractor's. registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be.kept free of dirt debris. Soils eaposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All .elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed Page 3 of 4 Building Permit MBLD00-114 • RR(1TTTRF.T) TNSPF,CTTnNS APPROVED/DATE PLUMBING: Rough-In (D-V-T & Clean outs), Water Supply Water Hammer Arrestor @ clothes and dishwasher Hose Bibs (backflow protection required) Pipe Insulation (R-3) Pressure Reduction Valve if> 80 psi Water Heater Seismic Restraint - Z places Pressure relief valve drain to exterior, terminate 6" - 24" above ground I Z j1~ /~ l (/ MECHANICAL Boiler -installation instructions shall be on-site at / ~ // / l J'- D~ time of inspection; requires low water shut-off and r high temperature shut-off Whole House Fan -Bath Source Specific Fan @ kitchen Environmental Air Exhaust ducting (w/ backdraft dampers), insulation (R-4) and terminus (located 3' from opening) FRAMING Walls ~ Z~~~/Qb Positive Connection l Treated Wood to Concrete Ceilings Roof Rafter Positive Connection Roof Venting -gave & ridge Windows -escape Skytight U factor -:.58 or better Door U-factor - .20 or better Windows Ufactor - .36 or better NFRC window sticker must be on windows, skylights and doors at inspection time Air Seal Fresh Air Intake (Window & Wall Ports) Fire Blocking Weather Resistive Barrier Page 2 of 4 Building Pvmit YBLD00-114 b. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3. A 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- residential project. 8. All building permits ezpire if no progress has been made within siz months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval orior to making changes in the field. Contact the Building Department (379-3208) prior to making changes to the approvedplans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Page 4 of 4