Loading...
HomeMy WebLinkAboutBLD00-111 Waterman & Katz Building I81 Quincy Streel Suite 301 Port Townsend, WA98368 Phone (360)379-3208 (Fax)385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BI.D~~-111R-1 Issued: 9/26!00 Parcel Number: 989714201 Job Address: 333 Lawrence Street Zoning: R-11 Type: VV=N Occupancy: RR=3 Total Occupant Load: 11 Nature of Work: Revision #1• Calculations for State enerev code compliance Owner: John and Carolyn Watts Contractor: Larry Richert GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 RE UIRED INSPECTIONS APPROVED/DATE See also original permit and inspection record jor required inspections and conditions INSULATION Basement Studio Wall C~~~ ~~ j - okay @ R-0 with componenttrade-offs Dormers Ceilings & Ceiling above F-2 closet and shower _ R_22 SE Studio walls - 273 sq. ft. @ R-22 F-1 Studio Walls - 896 sq. ft. @ R-13 F-2 Walls to Attic (previously unheated) -162 sq. ft. @ R-22 Windows and Doors - U factors per window and door schedule, Sheet A2 of plans Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 - ~: Building Permit #00-111R-I GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration number and a Ciri business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294, press 3. Measures shall include installation of silt fencing and graveled construMion entrance (see attached details). Adjacent rights-of way shall be kept free of dirt and debris. Soils ezposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construMion is complete. Applicant is responsible for protection of ad}'scent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after any corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. Far Public Works inspection ca11385-2294, press 3,~ minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy. 8. All building permits ezpire if no progress has been made within siz months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. POST THIS PERMIT ON~ITE WITH THE APPROVED PLANS. 10. Revisions require review and approval prior to making changes to the approved plans. Contact the Building Department at 379-3208 prior to making changes to the approved plans. Ca1148 hours before you dig Tor utility line locates 1-800-424-5555 Page 2 of 2 Woterman & Kah BuBd4~g I81 Qulnry Street, Sulle 30t POSY 7ovarend, WA 98368 Phone: 368J793208 Pa:36YJ65-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION STTE Call 385-2294 for Inspection Permit Number: BLDOO-1 T 1 Issued: 6/16/00 ParcelNumber: 989714201 Job Address: 333 Lawrence Street Zoning: R-11 Type: VV=N Occupancy: RR=3 Total Occupant Load: 11 Nature of Work: SinEle-family Dwellin¢ Addition/Remodel Owner: John and Carolyn Watts Contractor: Larry Richert GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REOUTRED: Electrical -Contact Labor & Industries @ 360-417-2702 RF(1TTTRRT) TNSPF('TTt7NS APPRnVED/DATE 1 l~ TEMP EROSION & SDM'T CONTROL Silt Fence & Drive OfI'Mat as needed during construction to prevent erosion and prohibit tracking of dirt and debris onto City rights-of--way See General Condition #Z GROUNDWORK PLUMBING ,~/~~/~O ~/ Pressure test l Pipe joints exposed Pipe bedding FOOTINGS Setbacks ~~~~~ ~~~~ Footings Studio Addition (bay) per engineering 20 " x 8" Forms Reinforcement - (3) #4 Interior Slab Footings -per engineering @ beam ends - 30" x 30" x 10" w/ (5) #4 each way @ center - 39" x 39" x 10" w/ (7) #4 each way Deck Piers UFER Ca1148 hours before you dig for utility line locates 1-500-424-5555 Page 1 of 5 Building Permit N00.111 ~ ~ REQUIRED INSPECTIONS APPROVF.D/DATE y ~ FOUNDATION Stem Wall Forms Reinforcement Vertical: #4 I8" o.c. Horizontal @ I2 " o. c with (2) #4 at top of wall Anchor Bolts w/ 2" x 2" x 3/16" squaze washers Engineered holdowns @ addition shear panels per Sheet A8 SLAB Monolithic slab foundation @ porch Setbacks Forms Footings Reinforcement R-10 @ perimeter of addition - detail A 5.1 FLOOR FRAMING / NOTE: Solid blocking between jloor joists @ F-2 per /~ /i7 ~ 0~ / J ~/ _ sheet 8 of plans (c/ !~ °C/ ~ Joists Blocking Shield under Posts Positive Connection PLUMBING: V-T & Clean Outs) Ro h In (D ~ ~y ~~ wS ` D~vV ug - - ~ Water Supply / p (~/~ ~Q / Water Hammer Arrestor @ clothes and dishwasher 1 f ~L Hose Bibs (backflow protection required) Pipe Insulation - (R-3) Pressure Reduction Valve if> 80 psi Water Heater Seismic Restraint - 2 places R-10 under if electric Pressure relief valve drain to exterior ~9~ Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 5 Building Permit 1100-I l l u RF.OiTiRF.n iNSPF,CTIONS APPROVED/DATE ME _ _ ~~r~---~_.~_ `. PG~urnace -manufacturer's rnstallahon ~ instructions shall be on-site at time of inspection Ducts & Duct Insulation Whole House Ventilation HVAC Integrated Fresh Air "Smooth Duct Automatic a ectric) Damper: requires letter of certification for flow rates Source Specific Fans Environmental Air Exhaust ducting (with backdraft damper), insulation (R-4) and terminus (located 3' from opening) ~ FRAMING: Revision may be required prior to ^ , framing fo show WSEC compliance / /~ t'/J 2 /~ Walls -provide solid blocking @ all sheathing panel edges per Sheet A9 Engineered Shear Walls @ addition Roof-H3 @ each rafter Attic Venting - soffit and eave Ceilings Engineered Posts, Beams & Headers -Engineered beam hangers per Sheet 8, F-1 - 6"x 6"DF #1 posts with Simpson ABU66 per Sheet 8 - 4" x d " DF #1 beam @ porch per Sheet 8 Windows -egress Windows -safety glazing Windows Ufactor -refer to schedule Sheet A2 NFRC window sticker must be on windows, doors and skylights at inspection time Air Seal Door UValue -see schedule, SheetA2 RaftedTruss Positive Connection Fire Blocking Weather Resistive Barrier INSULATION Slab (R-10) , /~ ~~ Wall (R-19 new ; R-15 (fill exposed cavities ) Ceiling (R-30 ) Battles Vapor Barrier: paint Call 48 hours before you dig for utility tine locates I-800-424-5555 Page 3 of 5 Building Permit #00-1 l l REQUIRED INSPECTIONS APPROVED/DATE `i DRY WALL NAILING Walls Ceiling Enclosed Space Under Stairs FINAL Public Works Sign-Off Fire Department Sign-Off(I.PG) ~ / House Number -check for 5"numbers ~ ~ ~ l Plumbing Mechanical -Ventilation Certification for Integrated System Insulation Certificate V. B'. Paint Certificate Smoke Detectors throughout Final -Building • GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries. contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. Z. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of way shall be kept free of dirt and debris. Soils ezposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, eta once construction is completes Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review. and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after any corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected For Public Works inspection call 385-2294, press 3; a minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 4 of 5 lg x ~.. Building Permit #00-111 . 8. All building permits ezpire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. 10. Revisions require review and approval prior to making changes to the approved plans. Contact the Building Department at 379-3208 prior to making changes to the approved plans. • Call 48 hours before you dig for utility line locates I-800-424-5555 Page 5 of 5 x L~