Ca11385-2294 for Inspection
Permit Number: BI.D~~-111R-1
Issued: 9/26!00 Parcel Number: 989714201
Job Address: 333 Lawrence Street Zoning: R-11 Type: VV=N Occupancy: RR=3
Total Occupant Load: 11 Nature of Work: Revision #1• Calculations for State enerev code compliance
Owner: John and Carolyn Watts Contractor: Larry Richert
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
RE UIRED INSPECTIONS
APPROVED/DATE
See also original permit and inspection record jor
required inspections and conditions
INSULATION
Basement Studio Wall
C~~~ ~~
j
- okay @ R-0 with componenttrade-offs
Dormers Ceilings & Ceiling above F-2 closet and shower
_ R_22
SE Studio walls
- 273 sq. ft. @ R-22
F-1 Studio Walls
- 896 sq. ft. @ R-13
F-2 Walls to Attic (previously unheated)
-162 sq. ft. @ R-22
Windows and Doors
- U factors per window and door schedule, Sheet A2 of
plans
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
- ~:
Building Permit #00-111R-I
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's
reeistration number and a Ciri business license. Failure to provide proof of this documentation prior to
work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected
prior to beginning construction; call 385-2294, press 3. Measures shall include installation of silt
fencing and graveled construMion entrance (see attached details). Adjacent rights-of way shall be kept
free of dirt and debris. Soils ezposed during construction shall be temporarily stabilized with mulching,
plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once
construMion is complete. Applicant is responsible for protection of ad}'scent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re-inspection is required after any corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. Far Public Works inspection ca11385-2294, press 3,~
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduling the Building Department's final inspection.
7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy.
8. All building permits ezpire if no progress has been made within siz months, or if no inspections are
done by the Building Department within one year. Call for at least one inspection per year to keep
your building permit active.
9. POST THIS PERMIT ON~ITE WITH THE APPROVED PLANS.
10. Revisions require review and approval prior to making changes to the approved plans. Contact the
Building Department at 379-3208 prior to making changes to the approved plans.
Ca1148 hours before you dig Tor utility line locates
1-800-424-5555
Page 2 of 2
Woterman & Kah BuBd4~g
I81 Qulnry Street, Sulle 30t
POSY 7ovarend, WA 98368
Phone: 368J793208 Pa:36YJ65-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION STTE
Call 385-2294 for Inspection
Permit Number: BLDOO-1 T 1 Issued: 6/16/00 ParcelNumber: 989714201
Job Address: 333 Lawrence Street Zoning: R-11 Type: VV=N Occupancy: RR=3
Total Occupant Load: 11 Nature of Work: SinEle-family Dwellin¢ Addition/Remodel
Owner: John and Carolyn Watts Contractor: Larry Richert
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REOUTRED:
Electrical -Contact Labor & Industries @ 360-417-2702
RF(1TTTRRT) TNSPF('TTt7NS APPRnVED/DATE
1
l~
TEMP EROSION & SDM'T CONTROL
Silt Fence & Drive OfI'Mat as needed during
construction to prevent erosion and prohibit tracking of dirt
and debris onto City rights-of--way
See General Condition #Z
GROUNDWORK PLUMBING ,~/~~/~O ~/
Pressure test l
Pipe joints exposed
Pipe bedding
FOOTINGS
Setbacks
~~~~~
~~~~
Footings
Studio Addition (bay) per engineering 20 " x 8"
Forms
Reinforcement - (3) #4
Interior Slab Footings -per engineering
@ beam ends - 30" x 30" x 10" w/ (5) #4 each way
@ center - 39" x 39" x 10" w/ (7) #4 each way
Deck Piers
UFER
Ca1148 hours before you dig for utility line locates
1-500-424-5555
Page 1 of 5
Building Permit N00.111 ~ ~
REQUIRED INSPECTIONS APPROVF.D/DATE y ~
FOUNDATION
Stem Wall
Forms
Reinforcement
Vertical: #4 I8" o.c.
Horizontal @ I2 " o. c with (2) #4 at top of wall
Anchor Bolts w/ 2" x 2" x 3/16" squaze washers
Engineered holdowns @ addition shear panels
per Sheet A8
SLAB
Monolithic slab foundation @ porch
Setbacks
Forms
Footings
Reinforcement
R-10 @ perimeter of addition - detail A 5.1
FLOOR FRAMING
/
NOTE: Solid blocking between jloor joists @ F-2 per /~ /i7 ~
0~ / J ~/
_
sheet 8 of plans (c/ !~ °C/ ~
Joists
Blocking
Shield under Posts
Positive Connection
PLUMBING:
V-T & Clean Outs)
Ro
h
In (D ~ ~y ~~
wS `
D~vV
ug
-
- ~
Water Supply /
p (~/~ ~Q /
Water Hammer Arrestor @ clothes and dishwasher 1 f ~L
Hose Bibs (backflow protection required)
Pipe Insulation - (R-3)
Pressure Reduction Valve if> 80 psi
Water Heater
Seismic Restraint - 2 places
R-10 under if electric
Pressure relief valve drain to exterior
~9~
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 5
Building Permit 1100-I l l
u
RF.OiTiRF.n iNSPF,CTIONS APPROVED/DATE
ME _ _ ~~r~---~_.~_ `.
PG~urnace -manufacturer's rnstallahon ~
instructions shall be on-site at time of inspection
Ducts & Duct Insulation
Whole House Ventilation
HVAC Integrated Fresh Air
"Smooth Duct
Automatic a ectric) Damper: requires letter
of certification for flow rates
Source Specific Fans
Environmental Air Exhaust ducting (with
backdraft damper), insulation (R-4) and terminus
(located 3' from opening)
~
FRAMING: Revision may be required prior to ^
,
framing fo show WSEC compliance / /~
t'/J
2 /~
Walls -provide solid blocking @ all sheathing
panel edges per Sheet A9
Engineered Shear Walls @ addition
Roof-H3 @ each rafter
Attic Venting - soffit and eave
Ceilings
Engineered Posts, Beams & Headers
-Engineered beam hangers per Sheet 8, F-1
- 6"x 6"DF #1 posts with Simpson ABU66
per Sheet 8
- 4" x d " DF #1 beam @ porch per Sheet 8
Windows -egress
Windows -safety glazing
Windows Ufactor -refer to schedule Sheet A2
NFRC window sticker must be on
windows, doors and skylights at inspection
time
Air Seal
Door UValue -see schedule, SheetA2
RaftedTruss Positive Connection
Fire Blocking
Weather Resistive Barrier
INSULATION
Slab (R-10) ,
/~ ~~
Wall (R-19 new ; R-15 (fill exposed cavities )
Ceiling (R-30 )
Battles
Vapor Barrier: paint
Call 48 hours before you dig for utility tine locates
I-800-424-5555
Page 3 of 5
Building Permit #00-1 l l
REQUIRED INSPECTIONS
APPROVED/DATE
`i
DRY WALL NAILING
Walls
Ceiling
Enclosed Space Under Stairs
FINAL
Public Works Sign-Off
Fire Department Sign-Off(I.PG) ~ /
House Number -check for 5"numbers ~
~ ~ l
Plumbing
Mechanical -Ventilation Certification for
Integrated System
Insulation Certificate
V. B'. Paint Certificate
Smoke Detectors throughout
Final -Building
•
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries. contractor's
registration number and a City business license. Failure to provide proof of this documentation prior to
work may result in job shut down while this is accomplished.
Z. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected
prior to beginning construction; ca11385-2294, press 3. Measures shall include installation of silt
fencing and graveled construction entrance (see attached details). Adjacent rights-of way shall be kept
free of dirt and debris. Soils ezposed during construction shall be temporarily stabilized with mulching,
plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, eta once
construction is completes Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review. and oversee correction of any and all deficiencies noted by
required inspections.
5. Re-inspection is required after any corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected For Public Works inspection call 385-2294, press 3; a
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduling the Building Department's final inspection.
7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy.
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 4 of 5
lg
x
~..
Building Permit #00-111
. 8. All building permits ezpire if no progress has been made within six months, or if no inspections are
done by the Building Department within one year. Call for at least one inspection per year to keep
your building permit active.
9. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
10. Revisions require review and approval prior to making changes to the approved plans. Contact the
Building Department at 379-3208 prior to making changes to the approved plans.
• Call 48 hours before you dig for utility line locates
I-800-424-5555
Page 5 of 5