HomeMy WebLinkAboutBLD00-110Waterman & Katz Building
18I Qumey Street, Suite 301
Pon 7owrtseM, WA 98368
Plwne: (360) 3793208 Faz: (360) 385-7675
CITY OF PORT TOWNSEND
~ CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLD00-110 Issued: 6/7/00 Parcel Number: 989713002
Job Address: 643 Pierce Zoning: RR=II Type: VV=N Occupancy: RR=3
Nature of Work: Replace all windows with same size double-sane wood windows: and install new
wood front door.
Owner: Anita Fraser and Jim Norris
(360)385-2845
Contractor: Steve Cooper Construction
GENERAL CONDITIONS APPLY -SEE LAST PAGE
RE UIRED INSPECTIONS
APPROVED/DATE
FRAMING/FINAL:
Windows -safety glazing where applicable per
attached details.
Escape Windows -applicable in bedrooms if
enlarging existing window sizes ~ / f
Window Ufactor - .40 or better (electric heat) --- ~ 3S ~- t3 ~ 6 l~ JJ11~ g! ZY (2"w
NFRC window sticker must be on '
windows. at inspection time
Air Seal
FINAL
House Number -minimum 5" per Port Townsend
Municipal Code 12.16.050
Smoke Detectors throughout; battery powered
Smoke Detectors adequate in existing
construction
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
ra,n~e asi.DOO-i io
GENERAL CONDITIONS
1. Contractors working on this project. are required to have a Labor & Industries contractor's registration •
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; ca11385-2294, press 3. Measures shall include installation of silt fencing and
graveled construMion entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt
debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting,
etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is
complete.. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3. A
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduling the Building Department's final inspection.
7. Final Inspections are required prior to occupancy; a Certificate of Occupancy is required for anon-
residential project.
8. All building permits expire if no progress. has been made within six months, or if no inspections are done
by the Building Department withiq ane year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal & approval prior to making changes in the field. Contact the Building .
Department @ 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates
1-500-424-5555
Page 2 of 2