Loading...
HomeMy WebLinkAboutBLD00-110Waterman & Katz Building 18I Qumey Street, Suite 301 Pon 7owrtseM, WA 98368 Plwne: (360) 3793208 Faz: (360) 385-7675 CITY OF PORT TOWNSEND ~ CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLD00-110 Issued: 6/7/00 Parcel Number: 989713002 Job Address: 643 Pierce Zoning: RR=II Type: VV=N Occupancy: RR=3 Nature of Work: Replace all windows with same size double-sane wood windows: and install new wood front door. Owner: Anita Fraser and Jim Norris (360)385-2845 Contractor: Steve Cooper Construction GENERAL CONDITIONS APPLY -SEE LAST PAGE RE UIRED INSPECTIONS APPROVED/DATE FRAMING/FINAL: Windows -safety glazing where applicable per attached details. Escape Windows -applicable in bedrooms if enlarging existing window sizes ~ / f Window Ufactor - .40 or better (electric heat) --- ~ 3S ~- t3 ~ 6 l~ JJ11~ g! ZY (2"w NFRC window sticker must be on ' windows. at inspection time Air Seal FINAL House Number -minimum 5" per Port Townsend Municipal Code 12.16.050 Smoke Detectors throughout; battery powered Smoke Detectors adequate in existing construction Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 ra,n~e asi.DOO-i io GENERAL CONDITIONS 1. Contractors working on this project. are required to have a Labor & Industries contractor's registration • number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294, press 3. Measures shall include installation of silt fencing and graveled construMion entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections are required prior to occupancy; a Certificate of Occupancy is required for anon- residential project. 8. All building permits expire if no progress. has been made within six months, or if no inspections are done by the Building Department withiq ane year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal & approval prior to making changes in the field. Contact the Building . Department @ 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates 1-500-424-5555 Page 2 of 2