CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLDOO-lO9 Issued: 6/26/00 Parcel Number: 001024043
Job Address: 1238 Blaine Street Zoning: RR=II Type: VV=N Occupancy: R~3
Total Occupant Load: NC -existing living suace Nature of Work: Residential Remodel
Owner: Sean Rankins Contractor: Same as Owner ~ T j , /~/0 ~
GENERAL CONDTTIONS APPLY: See last Gage ~4- Y
SEPARATE PERMITS REQUIRED:
Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702
nL'/IT TTD L'T 7NCAR('TTf1NR
APPRnVF;D/DATE
1\L lJ ll~lJL as.~ra u
FLOOR FRAMING
Joists
Blocking
Positive Connection -- --- -
~~~~0~ i
/
FRAMING
Engineered shear walls
Walls
Ceiling
j
J~`°~~~~ ~i ~ ~~~9 /~
Rafter positive connection -
Attic venting - eave
Posts, beams and headers
Windows U-factor - .40 or better
NFRC sticker must be on windows and doors
~ ~ /~ j 1
at time of inspection l 1
Air Seal
Fireblocking
i
B
~ ~/lam Lf ~~~ ~~
/ /
er
arr
Weather Resistive „
CALL 48 hours before you dig for Utility line locates
1-800-424-5555
Page 1 of 3
Building Pmnit #BLD00-109
INSULATION
Walls(R-19)
Ceiling (R-30 )
Baffles
Vapor Bamer required Q
1.~~ ~~ Cl lylrO
DRYWALL NAILING
Walls
(~ 2Z/~ ~,
Ceiling
FINAL
House Numbers -check for 5" numbers
Insulation Certificate (if app]icable)
Vapor Barrier Paint certificate (if applicable)
Smoke Detectors throughout existing construction
per 1997 UBC
Final -building
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's
re¢istration number and a City business license. Failure to provide proof of this documentation
prior to work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (T'ESC) measures sha116e installed on-site and inspected
prior to beginning construMion; call 385-2294, press 3. Measures shall include installation of silt
fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be
kept free of dirt debris. Soils etposed during construction shall be temporarily stabilized with
mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings,
sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent
properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall
panels (ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspeMions.
5. Re-inspection is required after inspection report corrections are completed.
•
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 3
Building Permit #BLD00-109
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294,
press 3. A minimum of twenty-four hours notice is required. Public Works approval must be
received arior to scheduling the Building Department's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a
non-residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections
are done by the Building Department within one year. Call for at least one inspection per year to
keep your building permit active.
9. Revisions require review and approval for to making changes in the field. Contact the Building
Department at 379-5086 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.