CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
T'ffiS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: $LDOO-lO8 Issued: 618/00 Parcel Number: 974700104
Job Address: 2174 Sims Wav Zoning: CC=II Type: V-iVR
Occupancy: B Total Occupant Load: 5
Nature of Work: Locate Temporary office trailer behind Insurance Company for approximately six weeks
while office buildinE is underaoina remodelin¢.
Owner: Bricio J. Balderas -State Farm Insurance
Contractor: Little America Construction
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
~J
FINAL
Check for Labor & Industries label on mobile
office trailer
Accessible Ramp, as per WAC 51-40 and
1997 UBC, Chapter 11
Final -Building
~~~ (P/~~OU ~.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
Permit # BLD00.108
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's registration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; call 385-2294, press 3. Measures shall include installation of silt fencing and
graveled constructionentrance (see attached details). Adjacent rights-of--way shall be kept free of dirt
debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting,
etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is
complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3. A
minimum of twenty-four hours notice is reauired. Public Works aoaroval must be received urior to
scheduling the Building Deoartment's final insnection.
7. Final InspeMions are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
8. All building permits ezpire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal & approval prior to making changes in the field. Contact the Building
Department @ 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ONSITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates
I-800-424-5555