Loading...
HomeMy WebLinkAboutBLD00-108Waterm®, & KatzBuilding IHl Quincy Svee4 Suite 301 Part Townsend, WA 96368 Phone: (360) 379-3208 Fax: (360) 385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD T'ffiS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: $LDOO-lO8 Issued: 618/00 Parcel Number: 974700104 Job Address: 2174 Sims Wav Zoning: CC=II Type: V-iVR Occupancy: B Total Occupant Load: 5 Nature of Work: Locate Temporary office trailer behind Insurance Company for approximately six weeks while office buildinE is underaoina remodelin¢. Owner: Bricio J. Balderas -State Farm Insurance Contractor: Little America Construction GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 ~J FINAL Check for Labor & Industries label on mobile office trailer Accessible Ramp, as per WAC 51-40 and 1997 UBC, Chapter 11 Final -Building ~~~ (P/~~OU ~. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 Permit # BLD00.108 GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294, press 3. Measures shall include installation of silt fencing and graveled constructionentrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3. A minimum of twenty-four hours notice is reauired. Public Works aoaroval must be received urior to scheduling the Building Deoartment's final insnection. 7. Final InspeMions are required prior to occupancy; A Certificate of Occupancy is required fora non- residential project. 8. All building permits ezpire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal & approval prior to making changes in the field. Contact the Building Department @ 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ONSITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates I-800-424-5555 Page 2 of 2