HomeMy WebLinkAboutBLD00-106Waterman & Katz Building
181 Quinry Street Suite 30t
Pon Town.+end, WA 98368
Phone (360) 379-3206 Fax (360) 385-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Calt 385-2294 for Inspection
Permit Number: BLDOO-IOC) Issued: 6/9/00 Parcel Number: 974700104
Job Address: 2174 Sims Wav Zoning: CII Type: VV=N Occupancy: B
Total Occupant Load: No Chance Nature of Work: Remodel Insurance Office
Owner: State Farm Insurance Contractor: Little America Coraoration
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
RE UIRED INSPECTIONS
APPROVED/DATE
FRAII~IING
wads
Bestroom remodel (bank portion)
Window -safety glazing
Plumbing Rough-In
Cv~2Ca~00
DRYWALL NAILING /
~ /
(7
Walls G
~
~
p/ !tJ
(
Ceiling <
FINAL
Fire Department
Electrical (L&I)
Plumbing -Barrier Free Design
Pazking -existing -provide accessible space with
signage
Barrier Free Design: doorway widths, thresholds,
lever hazdwaze
Building
Page 1 of 2
Pmnit NBLDCO-~ 06
GENERAL CONDITIONS 1
1. Contractors working on this project are required to have a Labor & Industries contractor's re¢istration
number and a City business license. Failure to provide proof of this documentation prior to work may
'result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected prior
to beginning construction; call 385-2294, press 3. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt
debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting,
etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is
complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspeMion prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294, press 3. A
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduline the Building Departments final inspection.
Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
8. All building permits ezpire if na progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal & approval prior to making changes in the field. Contact the Building
Department ®379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ONSITE WITH THE APPROVED PLANS.
~~
Page 2 of 2