Loading...
HomeMy WebLinkAboutBLD00-105Watertoen & Katz 181 Quincy Stre<t Swte 301 Pon Tow~uend, WA 98368 Phone (360)379-3208 Faz (360)365-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION STTE Ca11385-2294 for Permit Number: BLDOO-lO5 Issued: 6/7/0o Parcel Number: 984601301 Job Address: 405 Foster Street Zoning: RR=II Type: VV=N Occupancy: R-3 Total Occupant Load: No Change Nature of Work: Construct second-story deck (396 sa. ft.l Owner: Kevin and Gail Boulter-Bur¢ler Contractor: Same as Owner GENERAL CONDITIONS APPLY -SEE LAST PAGE Footings Setbacks Footings - 2' x 2' x 10"pier Reinforcement - (2) #4 each way Plinth - 8" x 8" ~l~~an ~ Reinforcement - (4) #4 vertical Reinforcement - #3 Horizontal ties top & bottom FLOOR FRAMING/DECK All framing members shown as pressure treated or wood of natural resistance to decay Posts Engineered beam - 5-1/8" x 10-1/2" GLB Joists (2" x 8") Positive Connection Post-to-Pier EPB66 Post-to-Beam AC6 Treated Wood to Concrete Treated Wood Exposed to Weather Lag Bolts @ ledger - (2) %." @ 42" o.c. Blocking - 6" 2" x 8" blocks @ 48" o.c. with (2) 1/." lag bolts Positive connection post-to-rim joist - (2) %:" thru-bolts FRAMING Engineered header @ new door - 6" x 8" D.F. #i NFRC U factor label must be on door at time of inspection (See next page) Call 48 hours before you dig utility line locates: 1-800-424-5555 Page 1 of 2 P<tmitNHLD00-105 Framing continued Threshold/step Door U-factor .40 or better (electric heat) or .65 or better (other fuels) FINAL House Numbers posted (min. 5'~ Guardrails Smoke Detectors throughout existing construction per 1997 UBC Deck -Final GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contraMor's re¢istration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3. A 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- residential project. S. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit aMive. 9. Revisions require submittal & approval prior to making changes in the field. Contact the Building Department @ 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. U Call 48 hours before you dig utility line locates: 1-800-424-5555 Page 2 of 2