HomeMy WebLinkAboutBLD00-105Watertoen & Katz
181 Quincy Stre<t Swte 301
Pon Tow~uend, WA 98368
Phone (360)379-3208 Faz (360)365-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION STTE
Ca11385-2294 for
Permit Number: BLDOO-lO5 Issued: 6/7/0o Parcel Number: 984601301
Job Address: 405 Foster Street Zoning: RR=II Type: VV=N Occupancy: R-3
Total Occupant Load: No Change Nature of Work: Construct second-story deck (396 sa. ft.l
Owner: Kevin and Gail Boulter-Bur¢ler Contractor: Same as Owner
GENERAL CONDITIONS APPLY -SEE LAST PAGE
Footings
Setbacks
Footings - 2' x 2' x 10"pier
Reinforcement - (2) #4 each way
Plinth - 8" x 8"
~l~~an ~
Reinforcement - (4) #4 vertical
Reinforcement - #3 Horizontal ties top & bottom
FLOOR FRAMING/DECK
All framing members shown as pressure treated or wood of
natural resistance to decay
Posts
Engineered beam - 5-1/8" x 10-1/2" GLB
Joists (2" x 8")
Positive Connection
Post-to-Pier EPB66
Post-to-Beam AC6
Treated Wood to Concrete
Treated Wood Exposed to Weather
Lag Bolts @ ledger - (2) %." @ 42" o.c.
Blocking - 6" 2" x 8" blocks @ 48" o.c. with
(2) 1/." lag bolts
Positive connection post-to-rim joist -
(2) %:" thru-bolts
FRAMING
Engineered header @ new door - 6" x 8" D.F. #i
NFRC U factor label must be on door at
time of inspection
(See next page)
Call 48 hours before you dig utility line locates: 1-800-424-5555
Page 1 of 2
P<tmitNHLD00-105
Framing continued
Threshold/step
Door U-factor
.40 or better (electric heat) or .65 or better (other fuels)
FINAL
House Numbers posted (min. 5'~
Guardrails
Smoke Detectors throughout existing construction per 1997
UBC
Deck -Final
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contraMor's re¢istration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; call 385-2294, press 3. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt
debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting,
etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is
complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3. A
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
S. All building permits expire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit aMive.
9. Revisions require submittal & approval prior to making changes in the field. Contact the Building
Department @ 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
U
Call 48 hours before you dig utility line locates: 1-800-424-5555
Page 2 of 2