Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
BLD00-102
Waterman & Katz Building 18l Quincy Street Suite 301 Port Townsend, WA98368 Phone (360) 379-3208 Fax (3G0) 385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLDOO-lO2R-1 Issued: 10/31/00 Parcel Number: 948305008 Job Address: 1323 Jackman Street Zoning: R-11 Type: V_N Occupancy: R-3/U-1 Total Occupant Load: 7/4 Nature of Work: Revision #1: Install propane fireplace, chance elazin¢ (no change to WSEC compliancel. eliminate''/z wall, add full height wall, etc. Owner: Jim Carlson Construction Inc. Contractor: Same as Owner GENERAL CONDITIONS APPLY -SEE LA5T PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 RFnTiTRFTI iNSPF.CTinNS APPROVED/DATE See also original inspection record MECHANICAL ~ ~~~ LPG Fireplace - nranzrfacturer's installation ~ instructions shall be on-site at time of inspection Venting Combustion Air FRAMING: Refer to original inspection record INSULATION Wall @ closet & bedroom (R-19 ) Vapor Barrier: paint DRY WALL NAILING Refer to original inspection record FINAL Refer to original inspection record Call 48 hours before you dig for utility line locates I-800-424-5555 Page 1 of 2 Building Permit #BI.D00-102R-1 GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspeMed prior to beginning construction; call 385-2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of way shall be kept free of dirt and debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, boldowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after any correMions are completed. 6. The Building Department is unable to pass Gnal inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294, press 3; a~ minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Departments final inspection. 7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. 10. Revisions require review and approval prior to making changes in the Geld. Contact the Building Department at 379-3208 prior to making changes to the approved plans. Ca1148 hours before you dig Tor utility line locates 2 1-800-424-5555 Page 2 of 2 w.~~~ a tc,~ awwi~ iai Q~~Mr s<R«. sW~ w~ Part 1'ow~mend, WA 94366 Ppwr. 36BJ79J3a8 Fri 36Y3a5-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLDOO-IQZ Issued: 6/08/00 Parcel Number: 948305008 Job Address: 1323 Jackman Street Zoning: R-11 Type: VV=N Occupancy: R-3/U-1 Total Occupant Load: 7/4 Nature of Work: New Sinele-family Dwelline w/ saraee Owner: Jim Carlson Construction Inc. Contractor: Same as Owner GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMTTS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 DL'l1TTTDTi 71 TNCDTi !-'TT(1NC TEMP EROSION & SDM'T CONTROL Silt Fence Drive Off Mat See General Condition #1-inspection required rior to concrete in ection ~ /l/O~ / !/ C. - GROUNDWORK PLUMBING Pressure test , ^ I Pipe joints exposed ~ ~ ~~ ~/J /Zy Q~ Pipe bedding FOOTINGS Setbacks ~f~/(~9 ~~ Footings l < 1 Forms Reinforcement Interior Footings/Continuous Footings P ec Bay Piers LIFER A PPR nVF'n/nA TF. Ca1148 hours before you dig for utility line locates I-800-424-5555 Page 1 of 5 Building Permit #BLD00-I02 RE UIRED INSPECTIONS APPROVED/DATE FOUNDATION Stem Wall p b~ 2100 Forms Reinforcement Anchor Bolts w/ 2" x 2" x 3/16" square washers Waterproofing SLAB 24" R-10 rigid insulation @ perimeter w/ thermal break @ garage FLOOR FRAMING (okay @ framing) Joists -Engineered BCI plan on-site at time of / ~~` ~I©~ 1-U inspection c ~ Blocking for IBWP Positive Connection Beam Pockets (if applicable) Treated Wood to Concrete Anchor Bolts & Washers PLUMBING: Rough-In (D-V-T & Cln Outs) !~I` 5~~~ I~ Water Supply G `y Water Hammer Arrestor: at clothes & dishwasher Gas Supply ' 1.L / ,~/ n Hose Bibs (backflow protection required) ~ ' 1 (v' lf Pipe Insulation (R-3) l Fressure Reduction Valve if > 80 psi Water Heater Seismic Restraint - 2 places R-10 under if electric Pressure relief valve drain to exterior; elbow down; 6" - 24" above grade Call 48 hours before you dig for utility line locates I-800-424-5555 Page 2 of 5 HuiWing Pmnil #BLD00-102 u RF.C)TiTRFT) TNSPF.CTTONS APPROVED/DATE MECHANICAL Heat Pump -split system Ducts & Duct Insulation Whole House Ventilation HVAC Integrated Fresh Air 8" Smooth Duct Automatic (electric) Damper: requires letter of certification for flow rates Source Specific Fans `~ f~~~ ~~ Environmental Air Exhaust ducting (with ~ backdraft damper), insulation (R-4) and terminus (located 3' from opening) FRAMING: ,~,~dd Walls ~~~K1~t~~ Floor/Ceiling Roof -Engineered truss plan required on-site of framing inspection Attic Venting Posts, beams & headers Windows -egress Windows -safety glazing Windows Ufactor - .65 max. NFRC window sticker must be on windows at inspection time Air Seal Door UValue - .40 max. F.after/Truss Pos. Conn. Fire Blocking Weather Resistive Barrier INSULATION „ J g ' ~'( j~~~ p~ a' Slab (R-10) fit/ Floor (R-19 ) Wall(R-19) Ceiling (R-30 ) Baf3les Vapor Barrier: paint Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 5 Building Pumd #BLD00-103 REQUIRED INSPECTIONS APPROVED/DATE DRY WALL NAILING Walls / '~ ~ Ceiling t (Q~ t Interior Braced Wall Panels Garage/House Occupancy Separation Enclosed Space Under Stairs FINAL Public Works Sign-Off Fire Department Sign-Off (LPG) ~ f (Z~(Q~J ~i n House Number 1 I l~ Plumbing Mechanical Ventilation Certification for / Integrated System ci / ~'/` /l1 Insulation Certificate ( ( V. B. Paint Certificate Smoke Detectors Final -Building GENERAL CONDITIONS • 1. Contractors working on this project are required to have a Labor 8c Industries contractor's • reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESL) measures shat! be installed on-site and inspected prior to beginning construction; ca11385-2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of way shall be kept free of dirt and debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after any corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection cs11385-2294, press 3; s minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 4 of 5 Building Permit #BLD00.102 7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy. 8. All building permits ezpire if no progress has been made within siz months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. 10. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 379-3208 prior to making changes to the approved plans. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 5 of 5 t