HomeMy WebLinkAboutBLD00-100Waterman ~ Katz Building
181 Quinmy St., Suite 30l
Port Townsend, W A 98368
Phone (360) 379-3208 Faz: (360) 385.7675
i~
i
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLD00-100 Issued: 6/5/00 Parcel Number: 001024058
Job Address: 1006 Taft Street Zoning: RR=II Type: VV=N Occupancy: RR=3
Total Occupant Load: No Change Nature of Work: Remove torchdown roofine; install sheathine.
continuous screen ventine & new torchdown roofine.
Owner: Jan Davis Contractor: RIPS Construction
GENERAL CONDITIONS APPLY -SEE LAST PAGE
'~*NOTE: replacement or sistering of structural members (i.e. rafters or trusses) requires permit
revision prior to making the changes in the field. ""
REOUIItED INSPECTIONS
APPROVED/DATE
DEMOLITION
All construction debris to be deposited in
Jefferson County Landfill or other approved
location in accordance with all local, state
and federal laws.
SHEATHING ~ ~/
r
7/16" OSB requires 8d @ 6" o.c. edges & ~/
~
~
`
12" Feld or 1 3/," staples @ 6" o.c. edges and
field (refer to staple specifications for
applicability).
ROOF VENTING
Net free ventilation azea shall not be less than ~ ~~ ~~~ ~ L~~
1 square foot per 150 square feet of the azea
of the space ventilated. Continous screen
venting is proposed. Openings shall be
covered with corrosion resistant'/<" mesh.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
Permit NB(.D00-100
FINAL
House Numbers - 5" numbers of contrasting
color posted near main entrance of house and
visible from street per City Ordinance
Smoke Detectors -existing residence to be
upgraded for smoke detectors per 1997 UBC
Final -Building
~~ z ~'so (;~,
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's
re¢istration number and a Ciri business license. Failure to provide proof of this documentation prior to
work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected
prior to beginning construction; ca1138S2294, press 3. Measures shall include installation of silt
fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept
free of dirt debris. Soils ezposed during construction shall be temporarily stabilized with mulching,
plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once
construction is complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted ~~
required inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3.
A minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduline the Buildine Department's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
8. All building permits ezpire if no progress has been made within siz months, or if no inspections are
done by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal & approval prior to making changes in the field. Contact the Building
Department @ 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
I-800-424-5555
Page 2 of 2