Loading...
HomeMy WebLinkAboutBLD00-100Waterman ~ Katz Building 181 Quinmy St., Suite 30l Port Townsend, W A 98368 Phone (360) 379-3208 Faz: (360) 385.7675 i~ i CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLD00-100 Issued: 6/5/00 Parcel Number: 001024058 Job Address: 1006 Taft Street Zoning: RR=II Type: VV=N Occupancy: RR=3 Total Occupant Load: No Change Nature of Work: Remove torchdown roofine; install sheathine. continuous screen ventine & new torchdown roofine. Owner: Jan Davis Contractor: RIPS Construction GENERAL CONDITIONS APPLY -SEE LAST PAGE '~*NOTE: replacement or sistering of structural members (i.e. rafters or trusses) requires permit revision prior to making the changes in the field. "" REOUIItED INSPECTIONS APPROVED/DATE DEMOLITION All construction debris to be deposited in Jefferson County Landfill or other approved location in accordance with all local, state and federal laws. SHEATHING ~ ~/ r 7/16" OSB requires 8d @ 6" o.c. edges & ~/ ~ ~ ` 12" Feld or 1 3/," staples @ 6" o.c. edges and field (refer to staple specifications for applicability). ROOF VENTING Net free ventilation azea shall not be less than ~ ~~ ~~~ ~ L~~ 1 square foot per 150 square feet of the azea of the space ventilated. Continous screen venting is proposed. Openings shall be covered with corrosion resistant'/<" mesh. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 Permit NB(.D00-100 FINAL House Numbers - 5" numbers of contrasting color posted near main entrance of house and visible from street per City Ordinance Smoke Detectors -existing residence to be upgraded for smoke detectors per 1997 UBC Final -Building ~~ z ~'so (;~, GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's re¢istration number and a Ciri business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca1138S2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils ezposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted ~~ required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduline the Buildine Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- residential project. 8. All building permits ezpire if no progress has been made within siz months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal & approval prior to making changes in the field. Contact the Building Department @ 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates I-800-424-5555 Page 2 of 2