Loading...
HomeMy WebLinkAboutBLD00-099Waterman & Katz Hwlding 181 Quincy StrceC Swte 301 Port Townsend, WA 98368 Phony (360)379-3208 Fsx: (360)385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLDOO-O99R-1 Issued: 6120/00 Job Address: 1011 13"' Street Zoning: R-2 Nsture of Work: Revision iil: foundation revision Owner: Ian Currv and Niki Clark GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUII2ED: Electrical -Contact Labor & Industries @ 360-417-2702 Contractor: Same as Owner MONOLTI'HIC SLAB Revised insulation and sill plate detail per engineered plan. Refer to original permit for inspection requirements. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 Parcel Number: 948307801 Type: VV=N Occupancy: RR=3 Permit MBLD00-099R-1 ~ GENERAL CONDITIONS 1. ContraMors working on this project are required to have a Labor & Industries contractor's reeistration number and a ciri business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall. be installed on-site and inspected prior to beginning construction; ca11385-2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized wkh seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3. A 7. Final Inspections are'required prior to occupancy. 8. All building permits ezpire if no progress has been made within siz months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal & approval prior to making changes in the field. Contact the Building Department @ 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig Tor utility line locates 1-800-424-5555 Page 2 of 2 Watermm &Krizauilding 181 Quincy Sued, Suite 301 Pat Tam¢nd, WA 98368 Pna~: (360) 3>9-3zag Puc (360) ass-z6zs CITY OF PORT TOWNSEND CONSTRUCTION PERNIIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLDOO-O99 Issued: 6105/00 Parcel Number: 948307801 Job Address: 1011 13t" Street Zoning: R-2 Type: VV=N Occupancy: RR=3 Nature of Work: SFR Addition: Construct engineered unheated sunraom (200 SF) Owner: Ian Currv and Niki Clark GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 RF.nTTTRF.TI TNCPRC'TT(~NS Contractor: Same as Owner APPROVED/DATE TEMP EROSION & SDM'T CONTROL Sediment shall not be tracked onto City Streets; install measures as needed during construction; See General Condition No. 2 MONOLITHIC SLAB / % i7 Setbacks /Z I/cam O J~ Forms Monolithic Slab Foundation Reinforcement Insulation - R-l0 shown on plans; not required Anchor Bolts FRAMING Connection to existing house ~ /~/ O ~~ Cl / Connection at sill plate See Manufacturer's installation instructions for sunroom (engineered) Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 RE UIRED INSPECTIONS t~eus~.ooo-oss APPROVED/DATE `~ DRYWALL Back Wall FINAL House Numbers -check for 5" numbers s~~/(~J'l ~-~- Sunroom l Smoke detectors throughout existing construction: minimum one in each sleeping room and in each area hallway leading to sleeping rooms with a minimum of one on each floor GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils ezposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections are required prior to occupancy. 8. All building permits ezpire if no progress has been made within siz months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per. year to keep your building permit active. 9. Revisions require submittal & approval prior to making changes in the field. Contact the Building Department Q 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2