CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLDOO-O99R-1 Issued: 6120/00
Job Address: 1011 13"' Street Zoning: R-2
Nsture of Work: Revision iil: foundation revision
Owner: Ian Currv and Niki Clark
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUII2ED:
Electrical -Contact Labor & Industries @ 360-417-2702
Contractor: Same as Owner
MONOLTI'HIC SLAB
Revised insulation and sill plate detail per
engineered plan.
Refer to original permit for inspection
requirements.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
Parcel Number: 948307801
Type: VV=N Occupancy: RR=3
Permit MBLD00-099R-1 ~
GENERAL CONDITIONS
1. ContraMors working on this project are required to have a Labor & Industries contractor's reeistration
number and a ciri business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall. be installed on-site and inspected prior
to beginning construction; ca11385-2294, press 3. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt
debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting,
etc. Soils shall be permanently stabilized wkh seeding, plantings, sodding, etc. once construction is
complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3. A
7. Final Inspections are'required prior to occupancy.
8. All building permits ezpire if no progress has been made within siz months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal & approval prior to making changes in the field. Contact the Building
Department @ 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig Tor utility line locates
1-800-424-5555
Page 2 of 2
Watermm &Krizauilding
181 Quincy Sued, Suite 301
Pat Tam¢nd, WA 98368
Pna~: (360) 3>9-3zag Puc (360) ass-z6zs
CITY OF PORT TOWNSEND
CONSTRUCTION PERNIIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLDOO-O99 Issued: 6105/00 Parcel Number: 948307801
Job Address: 1011 13t" Street Zoning: R-2 Type: VV=N Occupancy: RR=3
Nature of Work: SFR Addition: Construct engineered unheated sunraom (200 SF)
Owner: Ian Currv and Niki Clark
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
RF.nTTTRF.TI TNCPRC'TT(~NS
Contractor: Same as Owner
APPROVED/DATE
TEMP EROSION & SDM'T CONTROL
Sediment shall not be tracked onto City Streets;
install measures as needed during construction; See
General Condition No. 2
MONOLITHIC SLAB /
% i7
Setbacks /Z I/cam
O J~
Forms
Monolithic Slab Foundation
Reinforcement
Insulation - R-l0 shown on plans; not required
Anchor Bolts
FRAMING
Connection to existing house ~ /~/ O ~~ Cl
/
Connection at sill plate
See Manufacturer's installation instructions for
sunroom (engineered)
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
RE UIRED INSPECTIONS
t~eus~.ooo-oss
APPROVED/DATE `~
DRYWALL
Back Wall
FINAL
House Numbers -check for 5" numbers s~~/(~J'l ~-~-
Sunroom l
Smoke detectors throughout existing construction:
minimum one in each sleeping room and in each
area hallway leading to sleeping rooms with a
minimum of one on each floor
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's registration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; call 385-2294, press 3. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt
debris. Soils ezposed during construction shall be temporarily stabilized with mulching, plastic sheeting,
etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is
complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3. A
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduling the Building Department's final inspection.
7. Final Inspections are required prior to occupancy.
8. All building permits ezpire if no progress has been made within siz months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per. year to keep your
building permit active.
9. Revisions require submittal & approval prior to making changes in the field. Contact the Building
Department Q 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 2