CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLD~U-~97
Job Address: 830 Jackson Street
Total Occupant Load: add 2
Owner: Dan & Tonv Veenstra
Issued: 6/28/00 Parcel Number: 001012013
Zoning: RR=II Type: V-N Occupancy: R_3
Nature of Work: Residential Addition and Remodel
Contractor: Same as Owner
GENERAL CONDITIONS APPLY: See last naae
SEPARATE PERMITS REQUIRED:
Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702
REOTTTRF,D INSPECTIONS
APPROVED/DATE
TEMPORARY EROSION AND SEDIMENT
CONTROL
Measures shall be employed on site during
construction to prevent dirt and debris from being
tracked onto rights-of--way
See General Condition #2
DEMOLITION
Materials from demolition shall be transported to
approved location in conformance with all state and
local ordinances
FOOTINGS
Setbacks ~sc-r,~/,~ f~GS GI~~9~0(/ n/I
C~
Footings
Forms
Reinforcement
Interior Footings
Porch/Deck Piers
CALL 48 hours before you dig for Utility line locates
1-800-424-5555
Page 1 of 4
f
Building Pmnh kBLD00-09~ ~ -
RE UIRED INSPECTIONS APPROVED/DATE
FOUNDATION ~/~ a ~
Engineered Holdowns
Stem Wall
Forms
Reinforcement
Anchor Bolts & Washers - 5/8" & 3/."per
engineered shear walls
Crawl Access
Foundation Vents - 7 required @ addition
FLOOR FRAMING
NOTE: engineered TJI plan shall be on-site at time ~ /l ~/~
of inspection ( l
Joists f
Blocking
Positive Connection
Treated Wood to Concrete
Crawl Space Access
Foundation Vents - 7 required @ addition
PLUMBING
Rough-In -Drains, Vents, Traps and Clean Outs ~ n
Water Supply ~~/~~~
/l
/'/
Water Hammer Arrestor @ clothes and dishwasher ~
Gas Supply ~~71'OC' /In
7t L:~
Pipe Insulation (R-3)
Pressure Reduction Valve if pressure > 80psi
Water Heater
Strap @ 1/3 points
Pressure relief valve drain to exterior, elbow down,
terminate 6" - 24" above grade - -
M NICAL
LPG Fireplac
if applicable from existing system) J
/
Source Specific Exhaust Fans ~ / / ~
jp/~~
Environmental Air Exhaust ducting (with backdraft I r (~/ /
dampers), insulation (R-4) and terminus (located 3
feet from openings into building)
J
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 4
Building Permit MBLD00.097
r1
LJ
RE UIRED INSPECTIONS
APPROVED/DATE
n
~J
`J
FRAMING
Walls
Engineered Shear Walls ~ ~ ~l~d
Ceiling
Roof
Rafter/truss positive connection
Attic venting -required @ 1/150 square feet // /~
Posts, beams and headers
Windows -safety glazing
Windows/Doors/Skylights U-factor -see attached
WATTSUN
NFRC sticker must be on windows, doors and
skylights at time of inspection
Air Seal
Fireblocking
Weather Resistive Barrier
INSULATION
Floor (R-19) ,//~h~~~
~t/1~~~°~ l (:I'~~ ~~ ~~~ ~ i/J ~
l
Walls (R-19) '
Ceiling (vault R-30/attic R-38 )
Baffles
Vapor Barrier- backed batts
6 mil black poly in crawl space
DRYWALL NAILING
Walls ~/~~~~
Ceiling
FINAL
House Numbers -check for 5" numbers
Plumbing
Mechanical
Insulation Certificate (if applicable)
Smoke Detectors throughout existing construction
per 1997 UBC
Final -building
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 4
Building Permit #BI.D00-097
GENERAL CONDITIONS
I. Contractors working on this project are required to have a Labor & Industries contractor's
re¢istration number and a Ciri business license. Failure to provide proof of this documentation
prior to work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected
prior to beginning construction; call 385-2294, press 3. Measures shall include installation of silt
fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be
kept free of dirt and debris. Soils exposed during construction shalt be temporarily stabilized with
mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings,
sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent
properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall
panels (ABWP) require inspection prior to cover.
4. Owner or owner's. agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re-inspeMion is required after inspection report corrections are completed.
• 6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294,
press 3. A minimum of twenty-four hours notice is required. Public Works approval must be
received prior to schedulin¢ the Buildine Deaartment's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for s
non-residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections
are done by the Building Department within one year. Call far at least one inspection per year to
keep your building permit active.
9. Revisions require review and approval riot to making changes in the field. Contact the Building
Department at 379-5086 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
L~
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 4 of 4