HomeMy WebLinkAboutBLD00-096Watemren & Kett Building
7 BI Quincy Sued, Suite 301
Pon Towmvd, WA 93363
Phone: (360) 3793208 Fez: (360) 3657673
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLDOO-096R-1 Issued: 01/02/01 Parcel Number: 936300413
Jab Address: 1046 Tremont Street Zoning: R-II Type: VV=N Occupancy: U-1
Nature of Work: Revision #1• Insulate and sheetrock unheated shoo area: add outside stairs. window, SGD
to F-2
Owner: John & Donna Van Ackeren Contractor: Owner
GENERAL CONDITIONS APPLY -SEE LAST PAGE
RF.OT1iRF,1~ iNSPF.CTIONS APPROVED/DATE
See also originallnspection Record
FRAMING
Windows
Stairs
Landings
Handrails
Guardrails
INSULATION -unheated space; verify _ n
insulation values ~~~
l ~`
Floor
Walls
Ceiling
Air Seal
Battles at vented bays
Vapor Barrier
DRYWALL
Walls 2~/ ~®/ „n
("'Il~
Ceiling ~
Garage/F-2 Occupancy Separation
FINAL
5" House Numbers @ main house r~ /16/0 M
Smoke Detector 1
L' l C (~/
Final -Building
CaII 48 hours before you dig for utility line locates
I-800-424-5555
Page 1 of 2
~~ x atnoo.os~t-,
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's registration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspeMed prior
to beginning construction; call 385-2294, press 3. Measures shall include installation of silt fencing and
graveled construction entrance. Adjacent rights-of--way shall be kept free of dirt & debris. Soils ezposed
during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be
permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is
responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required'
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294, press 3. A
minimum ottwenri-four hours notice is required. Public Works approval must be received prior to
scheduling the Building Denartment's final inspection.
7. Final Inspections are required prior to occupancy. A Certificate of Occupancy is required for anon-~
residential project.
8. All building permits expire if no progress has been made within sia months, or if no inspections are done
by the Building Department within one year. Call for at (east one inspection per year to keep your
building permit active.
9. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
1-800.424-5555
Page 2 of 2
Waterman & Kazz l3uilding
181 Quincy Slreet, Suite 30l
Port Townsend, WA 98368
Phone: (360)379-3206 Fu: (360)385-7675
CITY OF PORT TOWNSEND
~J
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLDOO-O96 Issued: 6/2/00 Parcel Number: 936300413
Job Address: 1046 Tremont Street Zoning: R-II Type: VV=N Occupancy: U-1
Nature of Work: Construct 768 square foot Garaee
Owner: John & Donna Van Ackeren
GENERAL CONDITIONS APPLY -SEE LAST PAGE
RF.f1TTTRF.TI TNCPF.f TT(lNC
Contractor: Owner
APPR()VF:n/DATE
TEMPORARY EROSION &
SEDIMENT CONTROL
See General Condition No 2
FOOTING
Setbacks .~ /s~~ /
/ (~
Footings r
Forms
~~cement
R
FOUND ION
Stem Wall
Forms
Reinforcement
Anchor bolts w 2"x 2"x 3/16" washers
SLAB
Setbacks
Forms
Reinforcement
Anchor Bolts
Call 48 hours before you dig for utility line locates
I-800-424-5555
Page 1 of 2
Permit N BLD00-096
REQUIRED INSPECTIONS
APPROVED/DATE
FRAMING
Walls
~
Ceiling/Roof ,,l~c(~D
, ~
` y
Rafter/Truss Positive Connection 1
' Q~ ' :'
Weather Resistive Barrier /~ .
FINAL
Final -Building I ~ I
~ tj fl t~ f - ^ n
+l~I/
GENERAL CONDITIONS
I. Contractors working on this project are required to have a Labor & Industries contractor's reeistration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished
2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected prior
to beginning construction; call 385-2294, press 3. Measures shall include installation of silt fencing and
graveled construction entrance. Adjacent rights-of--way shall be kept free of dirt & debris: Soils ezposed
during construction shat! be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be
permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is
responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection. report corrections. are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. Far Public Works inspection Ball 385-2294, press 3. A
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduling the Building DeoartmenYs final inspection.
7. Final Inspections are required prior to occupancy. A Certificate of Occupancy is required fora non-
residential project.
8. All building permits ezpire if no progress has been made within siz months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. POST THIS PERMIT ONSITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Pnge 2 of 2