Loading...
HomeMy WebLinkAboutBLD00-096Watemren & Kett Building 7 BI Quincy Sued, Suite 301 Pon Towmvd, WA 93363 Phone: (360) 3793208 Fez: (360) 3657673 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLDOO-096R-1 Issued: 01/02/01 Parcel Number: 936300413 Jab Address: 1046 Tremont Street Zoning: R-II Type: VV=N Occupancy: U-1 Nature of Work: Revision #1• Insulate and sheetrock unheated shoo area: add outside stairs. window, SGD to F-2 Owner: John & Donna Van Ackeren Contractor: Owner GENERAL CONDITIONS APPLY -SEE LAST PAGE RF.OT1iRF,1~ iNSPF.CTIONS APPROVED/DATE See also originallnspection Record FRAMING Windows Stairs Landings Handrails Guardrails INSULATION -unheated space; verify _ n insulation values ~~~ l ~` Floor Walls Ceiling Air Seal Battles at vented bays Vapor Barrier DRYWALL Walls 2~/ ~®/ „n ("'Il~ Ceiling ~ Garage/F-2 Occupancy Separation FINAL 5" House Numbers @ main house r~ /16/0 M Smoke Detector 1 L' l C (~/ Final -Building CaII 48 hours before you dig for utility line locates I-800-424-5555 Page 1 of 2 ~~ x atnoo.os~t-, GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspeMed prior to beginning construction; call 385-2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance. Adjacent rights-of--way shall be kept free of dirt & debris. Soils ezposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required' inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294, press 3. A minimum ottwenri-four hours notice is required. Public Works approval must be received prior to scheduling the Building Denartment's final inspection. 7. Final Inspections are required prior to occupancy. A Certificate of Occupancy is required for anon-~ residential project. 8. All building permits expire if no progress has been made within sia months, or if no inspections are done by the Building Department within one year. Call for at (east one inspection per year to keep your building permit active. 9. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800.424-5555 Page 2 of 2 Waterman & Kazz l3uilding 181 Quincy Slreet, Suite 30l Port Townsend, WA 98368 Phone: (360)379-3206 Fu: (360)385-7675 CITY OF PORT TOWNSEND ~J CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLDOO-O96 Issued: 6/2/00 Parcel Number: 936300413 Job Address: 1046 Tremont Street Zoning: R-II Type: VV=N Occupancy: U-1 Nature of Work: Construct 768 square foot Garaee Owner: John & Donna Van Ackeren GENERAL CONDITIONS APPLY -SEE LAST PAGE RF.f1TTTRF.TI TNCPF.f TT(lNC Contractor: Owner APPR()VF:n/DATE TEMPORARY EROSION & SEDIMENT CONTROL See General Condition No 2 FOOTING Setbacks .~ /s~~ / / (~ Footings r Forms ~~cement R FOUND ION Stem Wall Forms Reinforcement Anchor bolts w 2"x 2"x 3/16" washers SLAB Setbacks Forms Reinforcement Anchor Bolts Call 48 hours before you dig for utility line locates I-800-424-5555 Page 1 of 2 Permit N BLD00-096 REQUIRED INSPECTIONS APPROVED/DATE FRAMING Walls ~ Ceiling/Roof ,,l~c(~D , ~ ` y Rafter/Truss Positive Connection 1 ' Q~ ' :' Weather Resistive Barrier /~ . FINAL Final -Building I ~ I ~ tj fl t~ f - ^ n +l~I/ GENERAL CONDITIONS I. Contractors working on this project are required to have a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished 2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance. Adjacent rights-of--way shall be kept free of dirt & debris: Soils ezposed during construction shat! be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection. report corrections. are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. Far Public Works inspection Ball 385-2294, press 3. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building DeoartmenYs final inspection. 7. Final Inspections are required prior to occupancy. A Certificate of Occupancy is required fora non- residential project. 8. All building permits ezpire if no progress has been made within siz months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. POST THIS PERMIT ONSITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800-424-5555 Pnge 2 of 2