CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLDOO-O95 Issued: 5/19/00 Parcel Number: 948310302
Job Address: 1233 14t1i Street Zoning: R=II Type: V=N Occupancy: R-3
Total Occupant Load: NC (Deck onlvl Nature of Work: Repair and eauand wood deck.
Owner: Garv and Laura Hulsey Contractor: Same As Owner
GENERAL CONDITIONS APPLY -SEE LAST PAGE
RFl1TTTRF.T) TNCPF.f TT(1NC
APPR()VF,11/nATF.
FRAMING -all framing members shown to be
pressure treated wood or wood of natural resistance
to decay
Setbacks
~' Posts
Beams
Joists Positive Connections
FINAL
House Numbers posted -min. 5" high
Handrails
Guardrails
Stairs/i.anding
Smoke Detectors throughout per 1997 UBC
Deck -Final
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
Pemtit K BLD00-(195
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's re¢istration
number and a City business license. Failure to provide proof of this. documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and'inspected prior
to beginning construction; caI1385-2294, press 3. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights-af--way shall be kept free of dirt
debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting,
etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is
complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspeMion is required after inspection report corrections are completed.
6. The Building. Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294, press 3. A
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
8. All building permits ezpire if no progress has. been made within six months, or ifpo inspections are done
by the Building Department within one year. Call far at least one inspection per year to keep. your
building permit active.
9. Revisions require submittal and approval prior to making changes in the field. Obtain revisions from the
Building Department (379-3208) prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates
1-800-424-5555