Loading...
HomeMy WebLinkAboutBLD00-094 CITY OF PORT TOWNSEND Watceman & Katz Buildigg 181 Quircy SIree4 Suite 301 Port Townsend, WA 96368 Phoce: (360) 379.3208 Fax: (360) 3657675 CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLDOO-094R-1 Issued: 8/02/01 Parcel Number: 944400205 Job Address: 2529 Holcomb Street Zoning: RR=H Type: VV=N Occupancy: R-3 Total Occupant Load: NC Nature of Work: Enlar¢e wood deck: realace structural units Owner: Anthony and Ruthallyn Rubio Contractor: Same As Owner GENERAL CONDITIONS APPLY -SEE LAST PAGE NOTE: See also original plans and inspection record RF.fITTTRF.iI TNRPF.('TTONC APPRn VED/DATE FRAMING -all framing members shown to be pressure treated wood or wood of natural resistance to decay Setbacks Posts Beams Joists Positive Connections Windows -escape Windows -safety glazing Window U-factor - .37 or better Skylight U-factor - .47 or better Doors U-factor - .24 or better NFRC sticker shall be on windows, doors and skylight at time of inspection FINAL , ` House Numbers posted -min. 5" high CN`N'2t. Handrails ~~ DJZ ~' Guardrails Stairs/Landing Smoke Detectors throughout existing house per 1997 UBC Deck -Final Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 Pamir # HID06094R-I GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's re¢istration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspeMed prior to beginning construction; ca11385-2294, press 3. Measures shalt include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shalt be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construMion is complete. Applicant is responsible for proteMion of adjacent properties: 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294, press 3. A 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval prior to making changes in the field. Obtain revisions from the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2 Watermaa $ &mzBuild'in8 181 Quinry Street, Suite 301 Port Towrnerd, WA 98368 Phone: (360) 379.3208 Fix: (360) 385.7673 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLD~~-~94 Job Address: 2529 Holcomb Street Total Occupant Load: NC Owner: Anthony and Ruthallyn Rubio Issued: 5/19/00 Parcel Number: 944400205 Zoning: RR=II Type: VV=N Occupancy: R-3 Nature of Work: Expand wood deck: replace windows Contractor: Same As Owner GENERAL CONDITIONS APPLY -SEE LAST PAGE REQUIRED INSPECTIONS APPRO VED/DATE FRAMING -all framing members shown fo be pressure treated wood or wood of natural resistance. to decay Setbacks Posts Beams Joists Positive Connections Windows -escape Windows -safety glazing Window U-factor - .37 or better Skylight U-factor - .47 or better Doors U-factor - .24 or better NFRC sticker shall be on windows, doors and skylight at time of inspection FINAL 1 f House Numbers posted -min. 5" high ~ / Handrails Guardrails ~~~~ ~ , / / Stairs/Landing f ~~ Smoke Detectors throughout per 1997 UBC ~ ~3 Deck -Final CaI148 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 _ T Pmml # aLDOp.ory{ GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294, press 3. Measures shall include installation of silt fencing and. graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections.. 5. Re-inspection is required after inspection report corrections are completed. 6. The Binding Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294, press 3, A 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon- residential project. 8. All building permits expire if no progress has been made within siz months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval prior to making changes in the field. Obtain revisions from the Building Department (379-3208} prior to making changes to the approved plans. 10. POST THIS PERMIT ONSITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates I-800-424-5555 Page 2 of 2