HomeMy WebLinkAboutBLD00-093Wtlamm&Kat:Building
181 Quiery Stns, Suite 301
Pat iaxmeod, WA 98366
Phwe: (360) 3~s-3zoe P.c:36o) 3asa6~s
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca0 3852294 for Inspection
Permit Number: BLD00-093R-1 Issued: 3112/02 Parcel Number: 989 710 702
Job Address: 517 Polk Street
Total Occupant Losd: N/C
Zoning :R-III Type: V_N Occupancy: RR=3
Nature of Work: Revision #1• Dour new continuous fOOtInQ3 to be connected to eaistinE column bases and
fOOtiRQS uer engineering detail.
Owner: Carl Martin and Nancy Schrader
Contractor: Same as Owner
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REOUIItED:
Electrical -Contact Labor & Industries @ 360-417-2702
For other inspections, see original permit BLD00-093
• RE iTIRED INSPECTIONS
APPROVED/DATE
FOOTINGS
i
i
k
h
S
b
ange to ex
st
ng
s - rto c
et
ac
Footings -See engineering for positive connection of ~/, //
l f Q
existing footings.
Forms
Reinforcement
Porch Piers
FINAL
Refer to original inspection record.
Call 48 hours before you dig for utility line locates
I-800.424-5555
Page 1 of 2
Pm®t # BIS)00~093R-1
GENERAL CONDITIONS
1. ContrsMors working on this project are required to have a Labor & Industries contractor's reeistration
num r and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site anti inspected prior
to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled
construction entrance (see attached details). Adjacent rights-of-way shall be kept free of dirt debris. Soils
ezposed during construction shall be temporarily stab>7ized with mulching, plastic sheeting, etc. Soils
shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed
6. The Building Department is unable to pass final inspection on your project until Public Works
requirem~ts have been completed and inspected. For Public Works inspection ca11385-2294. A
minimum of twenty-lour hours notice is required. Public Works approval must be received prior to
~ufing the Building Department's final inspection.
Final InspeMions are required prior to occupancy; a Certificate of Occupancy is required fora non-
residential proje~k.
8. All building permits ezpire if no progress has been made within siz months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal 8c approval prior to making changes in the field Contact the Buildmg
Department Q 379-3208 prior to malting changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
1-800.424-5555
Page 2 oil
I,
Waterman & KatzBuilding
181 Quinry Stnxl, Suite 301
Pon ToumeeM,WA96368
Phone: (360)379-3208 Fes (360)385.7673
CITY OF PORT TOWNSEND
t
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLD~~-~93
Job Address: 517 Polk Street
Issued: 6120/00 Parcel Number: 989710702
Zoning :R-III Type: V`N Occupancy: RR=3
Total Occupant Load: N/C Nature of Work: Demo portion of front addition and reraof; enclose
existing storage (unheated); rebuild existing porch stairs to
cellar
Owner: Carl Martin and Nancy Schrader Contractor: Same as Owner
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
RF.(1TTTRFTI TNCPF.CTTnNS
APPROVED/DATE
DEMOLITION
Materials from demolition shall be transported to the
Jefferson County Landfill or other approved location
in accordance with all state and local ordinances and
regulations
FOOTINGS
Setbacks - no change to existing
Footings
Forms
Reinforcement
Porch Piers
FOUNDATION
Stem Wall
Forms
Reinforcement
Anchor Bolts
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 3
REQUIRED INSPECTIONS
APPROVED/DATE
.1
FRAMING
Floor- confrrm floor nailing of tid @ 6" o. c. minimum C/
rn
per attached engineering ~
lX b 17
~ j
Walls -engineered shear walls
Ceiling
Roof
Treated Wood to Concrete
Positive Connections
Attic Venting -ridge & eave
Window U-Factor -relocate (I) existing window
Window Safety Glazing - @ porch addition
Air Seal
Fire Blocking (if applicable)
Weather Resistive Barrier
INSULATION
Existing Walls -frll exposed cavities l~ ~
New Wall -R-19 /
l
l 0
V '
Ceilings - R-30 ((
Baffles
Vapor Barrier required: faced bans, 4 mil poly or
vapor barrier paint
DRYWALL NAILING
ll
W n ~~
I J
I
~
a
s .
~
/
~
Ceiling ~
~~
FINAL
Smoke Detectors throughout - ane in each sleeping ro ~rt-~ 11.~0~ ~~~l.un (~~ 6
P ~ 113 ~b3
room and in each area/halfivay leading to sleeping
rooms with a minimum of one on each floor;
battery powered okay in existing construction
House Numbers -check for 5"numbers
Insulation Certificate (if applicable)
VaporBamerPaint Certificate (if applicable)
Porch
Stairs
Final -Building
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's registration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
Call 48 hours before you dig for utility line locates
I-soo-aaa-ssss
Page 2 of 3
Permit q BLD00.093
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; calf 385-2294, press 3. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt
debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting,
etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is
complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required afrer inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3. A
minimum of twenty-four hours notice is required Public Works approval must be received prior to
scheduline the Buildin¢ Department's final inspection.
7. Final Inspections are required prior to occupancy; a Certificate of Occupancy is required fora non-
. residential project.
8. Afl building permits expire if no progress has been made within siz months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal & approval prior to making changes in the field. Contact .the Building
~_ Department @ 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 3