Loading...
HomeMy WebLinkAboutBLD00-093Wtlamm&Kat:Building 181 Quiery Stns, Suite 301 Pat iaxmeod, WA 98366 Phwe: (360) 3~s-3zoe P.c:36o) 3asa6~s CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca0 3852294 for Inspection Permit Number: BLD00-093R-1 Issued: 3112/02 Parcel Number: 989 710 702 Job Address: 517 Polk Street Total Occupant Losd: N/C Zoning :R-III Type: V_N Occupancy: RR=3 Nature of Work: Revision #1• Dour new continuous fOOtInQ3 to be connected to eaistinE column bases and fOOtiRQS uer engineering detail. Owner: Carl Martin and Nancy Schrader Contractor: Same as Owner GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REOUIItED: Electrical -Contact Labor & Industries @ 360-417-2702 For other inspections, see original permit BLD00-093 • RE iTIRED INSPECTIONS APPROVED/DATE FOOTINGS i i k h S b ange to ex st ng s - rto c et ac Footings -See engineering for positive connection of ~/, // l f Q existing footings. Forms Reinforcement Porch Piers FINAL Refer to original inspection record. Call 48 hours before you dig for utility line locates I-800.424-5555 Page 1 of 2 Pm®t # BIS)00~093R-1 GENERAL CONDITIONS 1. ContrsMors working on this project are required to have a Labor & Industries contractor's reeistration num r and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site anti inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of-way shall be kept free of dirt debris. Soils ezposed during construction shall be temporarily stab>7ized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed 6. The Building Department is unable to pass final inspection on your project until Public Works requirem~ts have been completed and inspected. For Public Works inspection ca11385-2294. A minimum of twenty-lour hours notice is required. Public Works approval must be received prior to ~ufing the Building Department's final inspection. Final InspeMions are required prior to occupancy; a Certificate of Occupancy is required fora non- residential proje~k. 8. All building permits ezpire if no progress has been made within siz months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal 8c approval prior to making changes in the field Contact the Buildmg Department Q 379-3208 prior to malting changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800.424-5555 Page 2 oil I, Waterman & KatzBuilding 181 Quinry Stnxl, Suite 301 Pon ToumeeM,WA96368 Phone: (360)379-3208 Fes (360)385.7673 CITY OF PORT TOWNSEND t CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLD~~-~93 Job Address: 517 Polk Street Issued: 6120/00 Parcel Number: 989710702 Zoning :R-III Type: V`N Occupancy: RR=3 Total Occupant Load: N/C Nature of Work: Demo portion of front addition and reraof; enclose existing storage (unheated); rebuild existing porch stairs to cellar Owner: Carl Martin and Nancy Schrader Contractor: Same as Owner GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 RF.(1TTTRFTI TNCPF.CTTnNS APPROVED/DATE DEMOLITION Materials from demolition shall be transported to the Jefferson County Landfill or other approved location in accordance with all state and local ordinances and regulations FOOTINGS Setbacks - no change to existing Footings Forms Reinforcement Porch Piers FOUNDATION Stem Wall Forms Reinforcement Anchor Bolts Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 3 REQUIRED INSPECTIONS APPROVED/DATE .1 FRAMING Floor- confrrm floor nailing of tid @ 6" o. c. minimum C/ rn per attached engineering ~ lX b 17 ~ j Walls -engineered shear walls Ceiling Roof Treated Wood to Concrete Positive Connections Attic Venting -ridge & eave Window U-Factor -relocate (I) existing window Window Safety Glazing - @ porch addition Air Seal Fire Blocking (if applicable) Weather Resistive Barrier INSULATION Existing Walls -frll exposed cavities l~ ~ New Wall -R-19 / l l 0 V ' Ceilings - R-30 (( Baffles Vapor Barrier required: faced bans, 4 mil poly or vapor barrier paint DRYWALL NAILING ll W n ~~ I J I ~ a s . ~ / ~ Ceiling ~ ~~ FINAL Smoke Detectors throughout - ane in each sleeping ro ~rt-~ 11.~0~ ~~~l.un (~~ 6 P ~ 113 ~b3 room and in each area/halfivay leading to sleeping rooms with a minimum of one on each floor; battery powered okay in existing construction House Numbers -check for 5"numbers Insulation Certificate (if applicable) VaporBamerPaint Certificate (if applicable) Porch Stairs Final -Building GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. Call 48 hours before you dig for utility line locates I-soo-aaa-ssss Page 2 of 3 Permit q BLD00.093 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; calf 385-2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required afrer inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3. A minimum of twenty-four hours notice is required Public Works approval must be received prior to scheduline the Buildin¢ Department's final inspection. 7. Final Inspections are required prior to occupancy; a Certificate of Occupancy is required fora non- . residential project. 8. Afl building permits expire if no progress has been made within siz months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal & approval prior to making changes in the field. Contact .the Building ~_ Department @ 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 3