Loading...
HomeMy WebLinkAboutBLD00-092Wdernuo & Kata BuBding 181 Qulney Street. Suite 38l Pat 7erneefW, WA98368 Ppone: 360379J308 Fe:360J86-7675 • CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLDOO-O92R-1 Issued: 5130100 Parcel Number: 965400401 Job Address: 1813 36th Street Zoning: R_II Type: VV=N Occupancy: RR=3 Total Occupant Load: 2 Nature of Work: Yoga Studio accessory to SFR Owner: Noele Guilini Contractor: Craie Johnson GENERAL CONDITIONS APPLY: See last aaae SEPARATE PERMITS REQUIRED: Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702 RE UIRED INSPECTIONS APPROVED/DATE TEMP EROSION & SEDIMENT CONTROL TESC measures to be installed on-site as needed during construction -See General Condition #2 FOOTINGS Setbacks /~~~ ~/! ~OO /~ lJ t~~ Forms Reinforcement Interior Footing Deck Piers UFER FOUNDATION Stem Wall Forms Reinforcement Anchor Bolts Vents - 6 required Crawl Access Beam Pockets Alternate Braced Wall Panel Holdown Hardware CALL 48 hours before you dig for Utility line locates 1-800-424-5555 Page 1 of 4 Building Permit #00-09]R-1 REQUIRED INSPECTIONS arpunvF.nlneTF. Y FLOOR FRAMING --- - -- -- --- ~ NOTE: Engineered BCI plan shall be on-site at time Of I71speCtl07! Joists Blocking Shield under Posts Positive Connection Girder to Concrete Beam Pockets Treated Wood to Concrete Anchor Bolts & Washers Foundation Vents PLUMBING Rough-In (D-V-T & Clean outs) ('/~ ~ ~ . Water supply ~ ~ d Gas Supply Hose Bibbs - backflow protection required Pressure Reduction Valve if> SO psi Pipe Insulation R-3 Water Heater Seismic Restraint - 2 places Pressure Relief Valve drain o exterior, terminate 6" -24" above ground MECHANICAL LPG Heater Whole house ventilation -bathroom Environmental Air Exhaust terminus (3' from openings into building), insulation (R-4) and ?7 // Q ducting (with backdraft damper) ~ D( l Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 4 Building Pmnit H00-092R-1 RFnITIRFn INSPF,CTIONS APPROVED/DATE • FRAMING --- -- -- - - - Walls A~Z~ , ~~I ~GCt.~' ~ ~~2 Ceiling Roof -engineered truss plan to be on-site at dme of inspection ~, ~ ,~ t~ '~/3/~~ ~~ Rafter/truss positive connection Attic venting -ridge and eave Posts, beams and headers ~',/~~ / " ~/~ JQt~`i Windows -safety glazing d Windows U-factor - .68 or better Skylights U-factor - .65 or better NFRC sticker must be on windows, doors and skylights at time of inspection Air Seal Fresh Air Intake (window ports) Fireblocking Weather Resistive Barrier INSULATION ~ Floors (R-19) ~ ~~ 0/ `~~ 1 Walls (R-19) Ceiling (R-30) Baffles Vapor Barrier required on warm side of walls 6 mil black poly in crawl space DRYWALL NAILING Walls '' nn ~ 1 231 ~ Ceiling ~C, )V111~ 0 0 { ~X FINAL House Numbers - 5" numbers /~/r ~~ ~~ Plumbing Mechanical Insulation Certificate Vapor Barrier Paint certificate Smoke Detectors Final -deck Final =building Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 4 Building Permit tt00-092R-1 GENERAL CONDITIONS 1. Contractors working on thisproject areYequired to have a Labor & Industries contractor's reeistration number and a Ciri business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of-way shallbe kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correMion of any and all defciencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294, press 3. A minimum of twenty-four hours notice is required. Public Works aooroval must be 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a non-residential project. 8. All building permits expire if no progress has been made within siz months, or if no inspections are done by the Building Department within one year. Csll for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 379-5086 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 4 of 4 Waterman & Kati HuaNng 161 QWnq Street. Suae 341 Fort 7awmend, WA 98368 Phene: 7603793208 Fu 360385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 far Inspection Permit Number: BLDOO-O92 Issued: 5/30/00 Parcel Number: 965400401 Job Address: 1813 36th Street Zoning: RR=II Type: VV=N Occupancy: RR_3 Total Occupant Load: add 2 Nature of Work: SFR Kitchen and Bath Addition Owner: Noele Guilini Contractor: Craie Johnson IrQ 1 Ott ~'VG ~° ~ SGV G~~`~ GENERAL CONDITIONS APPLY: See last uaee SEPARATE PERMITS REOUTRED; Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702 RF(1TTTRRT) TNCPF.f TT(1NS APPRO VED/DATE TEMP EROSION & SEDIMENT CONTROL TESC measures to be installed on-site as needed during construction -See General Condition #2 MONLITHIC SLAB p~'~ ~/ ~/~ Setbacks ~ `L'/ ~ ~ Forms Reinforcement Anchor Bolts Engineered Holdown Hardware Deck Piers ~~~~ /~~~ FLOORFRAMING NOTE: Engineered BCI plan shall be on-site at time of tnspection Joists { ~ l ~\ ~,1I1 /l~ ~ r--'~ ~ ~ ~O Blocking ~~ Positive Connection -engineered floor ties Treated Wood to Concrete Anchor Bolts CALL 48 hours before you dig for Utility line locates 1-800-424-5555 Page 1 of 4 Building Permit p06-0g1 Y~ REQUIRED INSPECTIONS APPR(1VFTlmeTF PLUMBING Rough-In (D-V-T & Clean outs) Water supply Gas Supply Hose Bibbs - backflow protection required Q K- ,M IK't n,.~ Pressure Reduction Valve if > 80 psi $1 i3 laa Pipe Insulation R-3 Water Heater Seismic Restraint - 2 places Pressure Relief Valve drain to exterior, terminate 6" -24" above ground R-10 under if electric MECHANICAL LPG Heater Whole house ventilation -bathroom Kitchen Exhaust Fans (100 cfm ) Environmental Air Exhaust terminus (3' from openings into building), insulation (R-4) and ducting (with backdraft damper) FRAMING Walls -engineered nailing & strapping Roof -engineered truss plan to be on-site at time of Inspection Rafter/truss positive connection ~~` ~ ~L Q ~c e ~ T Attic venting -ridge and eave Posts beer headers '~ ecc r o'~ ~ Q (ac,~~•-~-~ Windows-safet lazin ' I ~(aPJ @ -tea s -factor - .51 & .37 per WATTSUN $' ~ f 60 ~ ~~ /,~ _ _ ~ -~'°" Skylights U-factor - .47 per WATTSUN NFRC sticker must be on windows, doors and skylights at time of inspection Air Seat Fireblocking Weather Resistive Barrier / s ~ ~VMs I b~ Ca1148 hours before you dig for utility line locates f" 1-800-424-5555 il'lU Page 2 of 4 -~ J Building Permit it00-091 ~~ RE UIRED INSPECTIONS APPROVED/DATE INSULATION Walls (R-21) ~. Ceiling (R-38/R-21 @ vault) s` o°I23I2W ~ 'n'11 ~ ~ ~ ~ Baffles .~} o 1 2 \ Vapor Barrier - 4 mil poly DRYWALL NAILING / Walls ~ / " Ceiling ~ FINAL ~~ ~ dQ ~ House Numbers - 5" numbers ~ Plumbing Mechanical Insulation Certificate Smoke Detectors throughout Final -deck Final -building GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof o[ this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; caI1385-2294, press 3. Measures shall include installation of silk fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Sails exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including Waiting, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's .agent shall review and oversee correction of any and all deficiencies noted by required inspections. • Call 48 hours before you dig for utility line locates 1-500-424-5555 Page 3 of 4 Building Permit N00-092 5. Re-inspection is required after inspeMion report corrections are completed. • 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294, press 3. A minimum of twenty-four hours notice is required Public Works aovroval must be received prior to scheduline the Buildin¢ Department's final insuection 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a ,non-residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 379-5086 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 4 of 4