Loading...
HomeMy WebLinkAboutBLD00-091Walamu~ R KYZBuildioe 787 Quinry Street, Suite 301 Pon Yovmend, WA 98368 Phm+e: (360) 379-3208 Fac (360) 383-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLDOO-O91 Issued: 5111!00 Parcel Number: 001024039 Job Address: 1208 Blaine Street Total Occupant Load: N/C Owner: K. L. Sherrill Zoning: RR=II Type: V-N Nature of Work: Renoir Fire Damage Occupancy: R-3 Contractor: Townsend Builders GENERAL CONDITIONS- APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 RF(1TTTRF.T) TNCPF.('TinNC APPROVED/DATE FRAMING: ~ Walls Ceilings Fire Blocking CHIMNEY PIPE S /1~ Q-Tal~.i~:s ~~ (Ati~ ~ZOOti 1~ J~ S1 ` ' traps - ,/~ 31 pNCelo`p ~Qa+_~ O C Termination Spark Arrester INSULATION Exterior Walls (fill an~exnosed cavities ) Ceiling (if removing existing- refill to R-30 ) Baffles Vapor Barrier: paint DRY WALL NAILING Walls ~ G k. Ce t ~7 ~c~ c (,J ~L~.S Ceiling S~3i 2_00 Ca1148 hours. before you dig for utility line locates 1-800-424-5555 Page 1 of 2 Permit K BL-00.091 FINAL House Numbers Insulation Certificate Vapor Barrier Paint Certificate Smoke Detectors Final - Building 7/700 ~ I. Contractors working on this project are required to have a Labor & Industries contractor's re¢istration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site snd inspected prior to beginning construction; call 385-2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils ezposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspecfion on your project until Public Works requirements have been completed and inspected For Public Works inspeMion ca11385-2294, press 3. A 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- residential project. 8. All building permits ezpire if no progress has been made within siz months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval urior to making changes in the field. Contact the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2