Permit Number: BLDOO-O91 Issued: 5111!00 Parcel Number: 001024039
Job Address: 1208 Blaine Street
Total Occupant Load: N/C
Owner: K. L. Sherrill
Zoning: RR=II Type: V-N
Nature of Work: Renoir Fire Damage
Occupancy: R-3
Contractor: Townsend Builders
GENERAL CONDITIONS- APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
RF(1TTTRF.T) TNCPF.('TinNC
APPROVED/DATE
FRAMING:
~ Walls
Ceilings
Fire Blocking
CHIMNEY PIPE
S /1~ Q-Tal~.i~:s ~~ (Ati~ ~ZOOti
1~
J~ S1
`
'
traps - ,/~
31
pNCelo`p ~Qa+_~ O
C
Termination
Spark Arrester
INSULATION
Exterior Walls (fill an~exnosed cavities )
Ceiling (if removing existing- refill to R-30 )
Baffles
Vapor Barrier: paint
DRY WALL NAILING
Walls ~
G k. Ce t ~7 ~c~ c (,J ~L~.S
Ceiling S~3i 2_00
Ca1148 hours. before you dig for utility line locates
1-800-424-5555
Page 1 of 2
Permit K BL-00.091
FINAL
House Numbers
Insulation Certificate
Vapor Barrier Paint Certificate
Smoke Detectors
Final - Building
7/700 ~
I. Contractors working on this project are required to have a Labor & Industries contractor's re¢istration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site snd inspected prior
to beginning construction; call 385-2294, press 3. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt
debris. Soils ezposed during construction shall be temporarily stabilized with mulching, plastic sheeting,
etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is
complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspecfion on your project until Public Works
requirements have been completed and inspected For Public Works inspeMion ca11385-2294, press 3. A
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
8. All building permits ezpire if no progress has been made within siz months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal and approval urior to making changes in the field. Contact the Building
Department (379-3208) prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates
1-800-424-5555