Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
BLD00-087
we~~tt a xm eoiWoiq 1 n Quinry Street, Suite 301 Pat iowmad, WA 98366 Phone: (360) 379-3208 Faz: (360) 385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLDOO-O87R-1 Issued: 11!7!00 Parcel Number: 948304303 Job Address: 2020 Jackman Street Zoning: RR_II Type: V_N Occupancy: R-3 Total Occupant Load: 5 Nature of Work: Revision #1: Construct interior engineered shear walls to compensate for non- installation of engineered holdowns Owner: Nancv Fitch Contractor: Paul Kaase GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 Mechanical -Propane Tank and Exterior Piping RE UIRED INSPECTIONS APPROVED/DATE See also original inspection record DRY WALL NAILING Engineered Shear Walls - %" GWB with 6d cooler or wallboard nails @ 4 ° o. c. @ grids A & C; both sides of grid B FINAL See also original inspection record Ca1148 hours before you dig for utility line locates I-800.424-5555 Page 1 of 2 r~,a a atnooosnt-i 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils eaposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for proteMion of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294, press 3. A minimum of twenty-four hours notice is reauired Public Works approval must be received prior to scheduling the Building Departments final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- residential project. 8. All building permits ezpire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval prior to making changes in the field. Contact the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig Tor utility line locates 1-800-424-5555 Page 2 of 2 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD ' THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection WaLLmman $ KatzHwlding 161 Quincy Strad, Suile 301 Pon Toa•reenQ Wq 98368 PMn<: (360) 379-3208 Fu: (360) 379.6923 Permit Number: BLD00-~87 Issued: 6/6/00 Parcel Number: 948304303 Job Address: 2020 Jackman Street Zoning: R_II Type: VV=N Occupancy: R-3 Total Occupant Load: 5 Nature of Work: Construct Single family residence Owner: Nancy Fitch Contractor: Paul Kaase ~/ ~/D~ j ~SguL~ GENERAL CONDITIONS APPLY -SEE LAST PAGE ~ . CJ • v CQ ~~~~~ ~ D/jZ/Dl SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 RFf1TTTRFI) TNCPF.C'TTf1NS APPR()VF,D/DATE -- ---_ TEMP EROSION & SDM'T CONTROL See General Condition No. 2 Silt Fence as needed Drive Off Mat to restrict sediment from leaving the site FOOTINGS Setbacks / 7~ l~ ~~ Footings ` ~~ Forms Reinforcement Interior Footings ootings ~~ CaI148 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 5 a Permit q BLDOD-089 REQUIRED INSPECTIONS APPROVED/DATE FOUNDATION Stem Wall Forms Reinforcement Anchor Bolts with B. P. washers Engineered Holdown Hardware Vents - ]0 required Crawl Access Beam Pockets ,~ ~ ~~~~ (' 1/ ~~ FLOOR FRAMING Engineered TJIBCI plan shall be on-site at time of inspection; plans & calculations shall provide for gravity loading and bearing wall support of second floor Girders Joists Blocking Positive Connection Girder to Concrete Beam Pockets Treated Wood to Concrete Anchor Bolts & Washers Foundation Vents -10 required Crawl Space Access Radiant Heat Tubing PLUMBING: / Rough-In (D-V-T & Clean outs) ~~/ 3~~~ Water Supply Hydronic Tubing Gas Supply Hose Bibs (backflow protection required) Pipe Insulation (R-3) Pressure Reduction Vatve if> 80 psi Water Heater R-10 under Seismic Restraint - 2 places Pressure relief valve drain to exterior, terminate 6" - 24" above ground Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 5 Parttit M BLD00.087 C~ RF.(ITTTRFTI TNSPF,CTiONS APPROVED/DATE MECHANICAL Boiler -installation instructions shall be on-site at time of inspection; requires low water shut-off & high temperature shut-off Whole House Fan - 1" Floor Bath Source Specific Fans Environmental Air Exhaust ducting (w/ backdraft dampers), insulation (R-4) and terminus (located 3' from opening) FRAMING: Obtain Street & Utility Development i i ~~~~~ nspect on Permit prior to framing Walls Engineered Shear Walls -see sheet 4 of 7 Floors/Ceilings Roof Rafter Positive Connection Attic Venting -soffit and gable end vents Windows -escape Windows -safety glazing Windows Ufactor - .50 or better per WATTSUN NFRC window sticker must be on windows and doors at inspection time Air Seal Fresh Air Intake (Window Ports) Doors U-Factor - .47 or better per WATTSUN Fire Blocking Weather Resistive Barrier INSULATION / ~~3 ~ ~ ~ Floor (R_30) i Walls (R=19) Ceiling (R=30 ) Baffles Vapor Barrier: vapor bame paint Crawl space - 6 mil black poly Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 5 a. .. Pamil/BLD00.087 REQUIRED INSPECTIONS APPROVED/DATE • DRY WALL NAILING Walls Ceiling Enclosed Space Under Stairs ©~ FINAL Public Works Sign-Off Fire Department Sign-Off (LPG) House Numbers - 5" Plumbing Mechanical/Heating ~ ~~r~Z Insulation Certificate / Vapor Barrier Paint Certificate Smoke Detectors Final -Building 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESL) measures shalt be installed on-site and inspected prior to beginning construction; call385-2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details): Adjacent rights-of--way shall be kept free of dirt debris. Soils ezposed during construction shall be temporarily stabilized with mulching, plastic sheeting, eta Soils shall be permanently stabil~ed with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. A!! elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspeMion is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3. A Ca1148 hours before you dig for utility line locates I-800-424-5555 Page 4 of 5 • Permit # BLD00~087 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval prior to making changes in the field. Contact the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates 1-500-424-5555 Page 5 of 5