Loading...
HomeMy WebLinkAboutBLD00-086Wetaman R Kazz Building 181 Quincy Street, Suite 30l Port Townund, WA 98368 Phom:(360)379-3208 Fex: (360)379-7675 CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection CITY OF PORT TOWNSEND Permit Number: BLDOO-O86 Issued: 5131/00 Parcel Number: 991100028 Job Address: 311 33"' Street Zoning: Rosewind PUD Type: VV=N Occupancy: U-1 Nature of Work: Construct Joint Garaee per a pproved Rosewind Planned Unit Develop ment Owner: Rackowski Laurtizen Stromber¢. Lehman GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor and Industries @ 360-417-2702 l2F(ITTIi2FTl TNCPFC'TT(lNS Contractor: Blue Heron Construction APPROVED/DATE TEMPORARY EROSION & SEDIMENT CONTROL. See General Condition No 2 FOOTING -See Sheet 8 of plans Setbacks /„/Z ~~~ Footings UUJJ``// Forms Reinforcement Interior Slab Footings -per engineering UFER FOUNDATION Stem Wall ~~_ ~~~/ ~~ /~~ Forms / Reinforcement Anchor bolts w 2"x 2"x 3/16" washers Engineered Holdown Hardware Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 REQUIRED INSPECTIONS Permit # BLPOD-OH6 APPRnVF.D/DATF FRAMING NOTE.• Engineered nailing for sheathing; ------ -- ----- ~l1 ~~ f, solid blocking required ` V I Engineered Headers, Beams & Posts Walls Ceiling/Roof Post Positive Connection Rafter Positive Connection Weather Resistive Barrier FINAL ~, p ~1111 Final -Building ~~~ ~ ~dv tS~c/ GENERAL CONDITIONS I. Contractors working on this project are required to have a Labor & Industries contractor's reeistration number and a Ciri business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance. Adjacent rights-of--way shall be kept free of dirt & debris. Soils ezposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Sails shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspeMion report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected For Public Works inspection call 385-2294, press 3. A minimum oftwenty-four hours notice is required. Public Works anorovsl must be received orior to schedulin¢ the Buildine Department's final inspection. 7. Final Inspections are required prior to occupancy. A Certificate of Occupancy is required for anon- residential project. 8. All building permits ezpire if no progress has been made within sia months, or if no inspections sre done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. POST THIS PERNIIT ONSITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates I-800.424-5555 Page 2 of 2