Loading...
HomeMy WebLinkAboutBLD00-084Wetmnan ffi Katz Building 181 Quinry Strut, Suite 30I Port Towreend, WA 98366 Phone: (360) 379-3208 Fez: (360) 385-7675 i i CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLD~~-0g4 Issued: 5122100 Parcel Number: 957311401 Job Address: 505 Cass Street Zoning: R_II Type: VV=N Occupancy: RR=3 Nature of Work: Replace windows: remodel baths and utility room Owner: Mickev Forbes and Arthur Fine Contractor: Little and Little Construction GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED; Electrical -Contact Labor & Industries @ 360-417-2702 REQUIRED INSPECTIONS APPROVED/DATE PLUMBING Rough-In (D-V-T & Clean Outs) Water.Supply Pipe Insulation (R-3) Water Hammer Arrester @ Clothes Washer JS I~ „^~ ~ 1~' Zee (~ 1 /'' "'~" MECHANICAL 61 1 ~ Source Specific Fans 21 -~~t~~ -6~~ dJ~ 5 Z Environmental Air Exhaust ducting (with backdraft dampers), insulation (R-4) and terminus (located 3' from openings) FRAMING Walls Header @ Living Room Windows -Safety Glazing Window Ufactor - .50 (.65 or better required) NFRC window sticker must be on ~ f~ 6,~ 2~~a windows and skylight at Inspectton time Skylight Ufactor - .54 (.68 or better required) Air Seal Fire Blocking Call 48 hours before you dig for utility line locates 1-500-424-5555 Page 1 of 3 t remi~aeL~ao-0sa REQUIRED INSPECTIONS APPROVED/DATE INSULATION Fill Exposed Cavities DRYWALL Walls / /l~ Ceiling iV /d ~ ( CC Vapor Bamer required on warm walls (if applicable to scope of work) FINAL House Number -check for posting of 5" numbers ~ /~ 2/~ Plumbing 1 Mechanical Smoke Detectors throughout per 1997 UBC Final -Building ENERAL CONDTI'ION 1. Contractors working on this project are required to have a Labor & Industries contractor's re¢istration number and a City business license. Failure to provide proof of this documentation prior to work may ~ result in job shut down while this is accomplished 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, 6oldowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your projeM until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduline the Building Department's final insuection. 7. Final Inspections are required prior to occupancy; a Certificate of Occupancy is required fora non- residential project. Ca1148 hours before you dig for utility line locates I-800-424-5555 Page 2 of 3 Pamil #BLD00.084 8. All building permits expire if no progress has been made within sia months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal & approval prior to making changes in the field. Contact the Building Department @ 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-500-424-5555 Page 3 of 3