HomeMy WebLinkAboutBLD00-084Wetmnan ffi Katz Building
181 Quinry Strut, Suite 30I
Port Towreend, WA 98366
Phone: (360) 379-3208 Fez: (360) 385-7675
i
i
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLD~~-0g4 Issued: 5122100 Parcel Number: 957311401
Job Address: 505 Cass Street Zoning: R_II Type: VV=N Occupancy: RR=3
Nature of Work: Replace windows: remodel baths and utility room
Owner: Mickev Forbes and Arthur Fine Contractor: Little and Little Construction
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED;
Electrical -Contact Labor & Industries @ 360-417-2702
REQUIRED INSPECTIONS
APPROVED/DATE
PLUMBING
Rough-In (D-V-T & Clean Outs)
Water.Supply
Pipe Insulation (R-3)
Water Hammer Arrester @ Clothes Washer
JS I~ „^~ ~ 1~' Zee
(~ 1 /'' "'~"
MECHANICAL
61
1
~
Source Specific Fans 21
-~~t~~ -6~~ dJ~
5
Z
Environmental Air Exhaust ducting (with
backdraft dampers), insulation (R-4) and
terminus (located 3' from openings)
FRAMING
Walls
Header @ Living Room
Windows -Safety Glazing
Window Ufactor - .50 (.65 or better required)
NFRC window sticker must be on ~ f~ 6,~ 2~~a
windows and skylight at Inspectton time
Skylight Ufactor - .54 (.68 or better required)
Air Seal
Fire Blocking
Call 48 hours before you dig for utility line locates
1-500-424-5555
Page 1 of 3
t
remi~aeL~ao-0sa
REQUIRED INSPECTIONS APPROVED/DATE
INSULATION
Fill Exposed Cavities
DRYWALL
Walls /
/l~
Ceiling iV
/d ~
( CC
Vapor Bamer required on warm walls (if
applicable to scope of work)
FINAL
House Number -check for posting of 5" numbers
~ /~ 2/~
Plumbing 1
Mechanical
Smoke Detectors throughout per 1997 UBC
Final -Building
ENERAL CONDTI'ION
1. Contractors working on this project are required to have a Labor & Industries contractor's re¢istration
number and a City business license. Failure to provide proof of this documentation prior to work may ~
result in job shut down while this is accomplished
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; ca11385-2294, press 3. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt
debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting,
etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is
complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, 6oldowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your projeM until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3. A
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduline the Building Department's final insuection.
7. Final Inspections are required prior to occupancy; a Certificate of Occupancy is required fora non-
residential project.
Ca1148 hours before you dig for utility line locates
I-800-424-5555
Page 2 of 3
Pamil #BLD00.084
8. All building permits expire if no progress has been made within sia months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal & approval prior to making changes in the field. Contact the Building
Department @ 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
1-500-424-5555
Page 3 of 3