Loading...
HomeMy WebLinkAboutBLD00-082Walantm ffi Katz Birilding 181 Quincy Sheet' Sui4 301 Port Toumend, WA 98368 PMne: (360) 379-37A8 Fax: (360) 385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE CaII 385-2294 far Inspection Permit Number: BLDOO-O82 Issued: 5/3/0o Parcel Number: 989704401 Job Address: American Legion Parking Lot na, Monroe Street Zoning: CIII Type: V_N Occupancy: U-1 Nature of Work: Temoorarv StruMure-12'a 20' caroort-tvoe metal building ereMed for Kiwanis Club event (48 hrs.l Owner: ICiwanis Club Contractor: Same as owner Rich Gasfield @ 385-3300 GENERAL CONDITIONS APPLY -SEE LAST PAGE FRAMING/FINAL Framing Inspection may be done at Final Inspection if all elements of framing are visible Engineered pre-fab metal carport Positive connection to ground per plans Jefferson County Health Dept. will inspect kitchen during the event Final -Fire Department (See Fire Department memo dated 4/14/99 from same project issued in BLD99-098) Final -Building Department Ca1148 hours before you dig far utility line locates I-800-424-5555 Page 1 of 2 rte, a atnooosz GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in jab shut down while this is accomplished. 2. Temporary erosion and sediment control (T'ESC) measures shall be installed on-site snd inspected prior to beginning construction; ca11385-2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils ezposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. So0s shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3, A minimum of twenty-four hours notice is required. Publie Works aanroval must be received orior to scheduline the Buildine Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupanty is required for anon- residentialproject. 8. All building permifs ezpire if no progress has been made within sia months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit aMive. 9. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates I-800-424-5555 Page 2 of 2