Loading...
HomeMy WebLinkAboutBLD00-079' Waterman & Katz 13uiiding 181 Quincy Street Suite 301 Port Townvend, WA 98368 Phone (360) 379-3208 Fax (360) 385-7673 CITY OF PORT TOWNSEND CONSTRUCTION PERNIIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLDDU-~79 Issued: 05/18/00 Parcel Number: 972901301/304 Job Address: 890 51st Street Zoning: RR=1 Type: VV=N Occupancy: R-3/U-1 Total Occupant Load: 6/2 Nature of Work: New Sinele-family Dwelling w/ sarase Owner: Edwin & Christi Underwood Contractor: Same as Owner GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 72Fl1TTTRF.iI TNCPF.('TT(1N.C' APPRnVED/DATE TEMP EROSION & SDM'T CONTROL Inspection of TESC measures required prior to footings -see attached details Silt fence as needed Graveled construction entrance _ 1 S ~Q~ Q Q W r\es~bs~u`'2~aG tte -~~T rC¢ ~ p ~\S~ 5 S ~9'~s' ~~ "`~ ~ FOOTINGS -engineered pad footings (24" x 24" x 10"with (3) #4 each way) Setbacks Footings ~c t r¢,c Forms ~ 61 ~1~w`J Reinforcement Interior Footings -per engineering LIFER '~ C) ~ ~, ~~~ FOUNDATION Stem Wall Forms Reinforcement 6 K JJ} r t~p'~ r•X Anchor Bolts with 2" x 2" x 3/16" washers 6I j ~ 2 Vents -14 required u uo Crawl Access Beam Pockets Engineered Holdowns Page 1 of 4 Permit # BLD00-079 REQUIRED INSPECTIONS APPRnvFn/naTF FLOOR FRAMING Engineered BCI plan to be omsite @ time of inspection Girders Joists Blocking Shietd under Posts Positive Connection Girder to Concrete Beam Pockets Treated Wood to Concrete Anchor Bolts & Washers Foundation Vents -14 required '~ ~ J ~ ~~ ~ r~ l'1 11 ~`"~\G Ji PLUMBING: Rough-In (D-V-T &-Clean Outs) ,~~, //77 ' Water Supply 3`~/ ~/ t Water Hammer Arrester @ clothes and dishwasher Hose Bibs (backflow protection required) Pipe Insulation - R-3 Pressure Reduction Valve if> 80 psi Water Heater Seismic Restraint -strap @ 1/3 points Pressure relief valve drain to exterior, terminate 6" - 24" above ground MECHANICAL Electric Forced Air Furnace 7/ f'p~~ Mamrfacturer's Installation Instructions to be on-site @ time of inspection Ducts & Duct Insulation -Supply/fresh air ducts in conditioned space: R-4; heating ducts in unconditioned space: R-8 .Whole House Ventilation HVAC Integrated Fresh Air 7" Smooth Duct minimum Terminal Element - 8" Clock timer on furnace fan Other than motorized damper requires letter of certification for flow rates Source Specific Fans Environmental Air Exhaust ducting, insulation (R-4) and terminus (located 3' from opening) Page 2 of 4 Pmnit # BI.D00-079 RF.(ITTTRF.T) INSPF.CTinNS APPROVED/DATE • FRAMING:---- -- ------- Walls '~/~J~121 Engineered Shear Walls Engineered Strap Connections Roof- Engineered truss plan to be an-site at time of inspection Attic Venting -ridge & eave Ceilings Engineered Beams and Headers Windows -escape , Windows -safety glazing (SG) Windows Ufactor - .40 max. NFRC window sticker must be on windows, skylights. & doors at inspection time Skylights Air Seal Doors Ufactor -entry door exempt Raftet/Truss Positive Connection Fireblocking Weather Resistive Barrier INSULATION .~/ /~ Floor (R-30) !/~ ~~ (. Wall(R-19) Ceiling (R-38 attic/R-30 vault ) Baffles Vapor Barrier: paint Crawl space - 6 mil black poly DRY WALL NAII.ING Walls y~ 7~~Q,~v ~ Ceiling Garage/House Occupancy Sepazation Enclosed Space under Stairs FINAL Public Works Sign-Off j ~~~~ ~^ House Numbers - 5" high Plumbing Mechanical -Ventilation Certification for Integrated System Insulation Certificate V. B. Paint Certificate Smoke Detectors Final -Building Page 3 of 4 Permit # BLD00-079 GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may resulEin job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of way shall be kept free of dirt and debris. Snits exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after any corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3~ minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's 5nal inspection. 7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy.. 8. AlI building permits expire if no progress has been made within siz months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval pr10r to making changes in the field. Contact the Building Department at 379-5086 grior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Page 4 of 4