Loading...
HomeMy WebLinkAboutBLD00-076Waterman dt Katz Building 181 Quinry Street, Suite 301 Pat Townwxl, WA 98368 Phone: (360j 379-3208 Fax: (360)379-fB23 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLDOO-O76 Issued: 513/00 Parcel Number: 991100007 Job Address: 325 33rd Street Total Occupant Load: 8 Zoning: Rosewind PUD Type: VV=N Occupancy: R-3 Nature of Work: Construct Sinele family residence Owner: Peter and Helen Lauritzen GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REOUiRED: Electrical -Contact Labor & Industries @ 360-417-2702 Contractor: Fred ICimballC'~51 d ,~~0 ,~5~ Z~p1 C~ C ~ ~,~~ lY9 :Special Inspection required for concrete and reinforcement for Rastra walls. Special Inspector shall be an ICBO certified inspector. ICBO certified inspector to either be listed in the current edition of WABO Agency and Inspector Reeister or present credentials to the Building Department prior to performing inspections. Required Special Inspection Reports shall indicate compliance with the plans and specifications and shall be copied to the Building Department in a timely manner. Permit Holder or Permit Holder's Agent shall review and oversee corcection of any and all deficiencies noted by required special inspections. RF,nTTTRF,n TNSPFCTTnNS APPROVED/DATE TEMP EROSION & SDM'T CONTROL See General Condition No. 2 Silt Fence as needed Drive OlI'Mat to restrict sediment from leaving the site GROUNDWORK PLUMBING Pressure Test Pipe Joints Exposed Pipe Bedding Propane Drain Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 5 Pmnit MBLDOD.076 RE UIRED INSPECTIONS APPROVED/DATE FOOTINGS -Special inspection required for rostra connections steel and concrete ~p C7 ~ Z , Setbacks Footings (Sheet 9.1 and 9.2) / . / Q ~- __ Q ,o,,,~,~~j c~ .Irk N^I'1 '~1~~""' ""7-" Forms T„ /~~ , Z~ "~" Reinforcement ~ UFER FOUNDATION Stem Wall ~ Z~DO Forms ~ Reinforcement -engineered Anchor Bolts - 5/8" bolts @ 48" & 36" o. c; see shear wall schedule Sheet 3:2 Holdown Hardware '-see schedule, Sheet 3.2 Waterproofing Porch plinths -see detail, Sheet 9.2 SLAB Interior Footings Thickened Footings / J Insul adi YH tT bi ~ ,,,,n ~ ~~ ~ VVY~ ` I an ng ea u FLOOR FRAMING Engineered TJI plan shall be on-site at time of inspection / n / n n Beams - DF # 1 @ piano/living room, piano ~ ~ l l_,.~ l _/i room/hall, pantry/hall, & kitchen/dining room l Joists Blocking Positive Connection - A 35 anchors at each joist-to- rastra wall connection Treated Wood to Concrete Anchor Botts -see schedule, Sheet 3.2 Radiant Heat Tubing - @ bedroom bays Ca1148 hours before you dig for utility line locates I-800-424-5555 Page 2 of 5 RE UIRED INSPECTIONS APPROVED/DATE .' u Permit M BLD00.076 PLUMBING: Rough-In (D-V-T & Clean outs) Water Supply "Gas Supply I~fos~ Bibs (backflow protection required) ape Insulation (R-3) Pressure Reduction Valve if> 80 psi Water Heater Seismic Restraint - 2 places Pressure relief valve drain to exterior, terminat 6" - 24" above gro n ~ /~l~/~ `/',(j' t ~ d CHANICAL --__ - __ Boiler - installdtian-ins ons sha eon- ' t time of inspection; requires low water shut-o, ff'& h "r~y~ p f f~~- 2~21~0/ C~ ut-off high temperature s / H - ire t Whole House Fan - I" Floor Bath Source Specific Fans ~~~~~ Environmental Air Exhaust ducting (w/ backdraft dampers), insulation (R-4) and terminus (located 3' from opening) FRAMING: Engineered Shear Walls; refer to Sheet A-2 I ~, / for sheathing & nailing requirements ~ ~ C l /~ J Walls G ( Floors/Ceilings -strap ties per engineering at , bedroom bays, see Sheet 4.1; tension ties with through bolts @ tower floor, see Sheet 4.2 Engineered Posts Beams & Headers - DF #1 above kitchen/pantry F-2 .Roof - CS18 straps @ ridge each rafter pair Rafter/Truss Positive Connection - Hl each rafter Attic Venting - eave and ridge vents Windows - escape Windows -safety glazing Windows Ufactor - .37 (others) and .SO (awning) NFRC window sticker must be on windows, doors and skylights at inspection time Door/Skylight U-factor - see attached Wattsun Air Seal Fresh Air Intake (Wall Ports) Fire Blocking Weather Resistive Barrier Ca1148 hours before you dig for utility line locates I-800-424-5555 Page 3 of 5 Pemit # BLD00.016 REQUIRED INSPECTIONS APPROVED/DATE INSULATION Floor(R_30) Walls (R-22 (framed)/R-23(Rastra) Ceiling (R-30 vault/R-38 attic) Baffles Vapor Barrier: paint 1 ~~L„- ~, ~/ZZfpl~ ;~L~-U~ v DRY WALL NAILING Walls f// / Ceiling ~ ~ ~j / Enclosed Space Under Stairs ( FINAL Public Works Sign-Off Fire Department Sign-Off (LPG) ?/2 3/O/ '(~ House Numbers Plumbing Mechanical/Heating Insulation Certificate Vapor Bamer Paint Certificate Smoke Detectors ~ ~~ D Final -Building 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESL) measures shall be installed on-site aad inspected prior to beginning construction; ca11 385-2 29 4, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils ezposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc, once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 4 of 5 Pemtit p BLD00-076 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. Far Public Works inspection ca11385-2294, press 3. A 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval prior to making changes in the field. Contact the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. i Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 5 of 5 ,~