HomeMy WebLinkAboutBLD00-076Waterman dt Katz Building
181 Quinry Street, Suite 301
Pat Townwxl, WA 98368
Phone: (360j 379-3208 Fax: (360)379-fB23
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLDOO-O76 Issued: 513/00 Parcel Number: 991100007
Job Address: 325 33rd Street
Total Occupant Load: 8
Zoning: Rosewind PUD Type: VV=N Occupancy: R-3
Nature of Work: Construct Sinele family residence
Owner: Peter and Helen Lauritzen
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REOUiRED:
Electrical -Contact Labor & Industries @ 360-417-2702
Contractor: Fred ICimballC'~51 d
,~~0 ,~5~ Z~p1 C~
C ~ ~,~~
lY9 :Special Inspection required for concrete and reinforcement for Rastra walls. Special Inspector
shall be an ICBO certified inspector. ICBO certified inspector to either be listed in the current edition of
WABO Agency and Inspector Reeister or present credentials to the Building Department prior to
performing inspections. Required Special Inspection Reports shall indicate compliance with the plans and
specifications and shall be copied to the Building Department in a timely manner. Permit Holder or
Permit Holder's Agent shall review and oversee corcection of any and all deficiencies noted by required
special inspections.
RF,nTTTRF,n TNSPFCTTnNS
APPROVED/DATE
TEMP EROSION & SDM'T CONTROL
See General Condition No. 2
Silt Fence as needed
Drive OlI'Mat to restrict sediment from leaving
the site
GROUNDWORK PLUMBING
Pressure Test
Pipe Joints Exposed
Pipe Bedding
Propane Drain
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 5
Pmnit MBLDOD.076
RE UIRED INSPECTIONS APPROVED/DATE
FOOTINGS -Special inspection required for rostra
connections
steel and concrete
~p C7
~
Z
,
Setbacks
Footings (Sheet 9.1 and 9.2) /
.
/ Q ~- __ Q ,o,,,~,~~j
c~ .Irk N^I'1 '~1~~""' ""7-"
Forms T„ /~~ ,
Z~
"~"
Reinforcement ~
UFER
FOUNDATION
Stem Wall
~
Z~DO
Forms ~
Reinforcement -engineered
Anchor Bolts - 5/8" bolts @ 48" & 36" o. c; see
shear wall schedule Sheet 3:2
Holdown Hardware '-see schedule, Sheet 3.2
Waterproofing
Porch plinths -see detail, Sheet 9.2
SLAB
Interior Footings
Thickened Footings
/
J
Insul
adi
YH
tT
bi ~ ,,,,n ~
~~
~
VVY~ ` I
an
ng
ea
u
FLOOR FRAMING
Engineered TJI plan shall be on-site at
time of inspection / n /
n n
Beams - DF # 1 @ piano/living room, piano ~
~
l l_,.~
l _/i
room/hall, pantry/hall, & kitchen/dining room l
Joists
Blocking
Positive Connection - A 35 anchors at each joist-to-
rastra wall connection
Treated Wood to Concrete
Anchor Botts -see schedule, Sheet 3.2
Radiant Heat Tubing - @ bedroom bays
Ca1148 hours before you dig for utility line locates
I-800-424-5555
Page 2 of 5
RE UIRED INSPECTIONS APPROVED/DATE
.'
u
Permit M BLD00.076
PLUMBING:
Rough-In (D-V-T & Clean outs)
Water Supply
"Gas Supply
I~fos~ Bibs (backflow protection required)
ape Insulation (R-3)
Pressure Reduction Valve if> 80 psi
Water Heater
Seismic Restraint - 2 places
Pressure relief valve drain to exterior, terminat
6" - 24" above gro n ~
/~l~/~ `/',(j'
t ~ d
CHANICAL
--__ - __
Boiler - installdtian-ins ons sha eon- ' t
time of inspection; requires low water shut-o, ff'&
h "r~y~ p f f~~- 2~21~0/ C~
ut-off
high temperature s /
H - ire t
Whole House Fan - I" Floor Bath
Source Specific Fans ~~~~~
Environmental Air Exhaust ducting (w/ backdraft
dampers), insulation (R-4) and terminus (located 3'
from opening)
FRAMING:
Engineered Shear Walls; refer to Sheet A-2 I
~, /
for sheathing & nailing requirements ~
~
C l /~
J
Walls G
(
Floors/Ceilings -strap ties per engineering at ,
bedroom bays, see Sheet 4.1; tension ties with
through bolts @ tower floor, see Sheet 4.2
Engineered Posts Beams & Headers - DF #1 above
kitchen/pantry F-2
.Roof - CS18 straps @ ridge each rafter pair
Rafter/Truss Positive Connection - Hl each rafter
Attic Venting - eave and ridge vents
Windows - escape
Windows -safety glazing
Windows Ufactor - .37 (others) and .SO (awning)
NFRC window sticker must be on windows, doors
and skylights at inspection time
Door/Skylight U-factor - see attached Wattsun
Air Seal
Fresh Air Intake (Wall Ports)
Fire Blocking
Weather Resistive Barrier
Ca1148 hours before you dig for utility line locates
I-800-424-5555
Page 3 of 5
Pemit # BLD00.016
REQUIRED INSPECTIONS APPROVED/DATE
INSULATION
Floor(R_30)
Walls (R-22 (framed)/R-23(Rastra)
Ceiling (R-30 vault/R-38 attic)
Baffles
Vapor Barrier: paint 1
~~L„- ~, ~/ZZfpl~
;~L~-U~
v
DRY WALL NAILING
Walls
f//
/
Ceiling ~
~
~j
/
Enclosed Space Under Stairs (
FINAL
Public Works Sign-Off
Fire Department Sign-Off (LPG) ?/2 3/O/ '(~
House Numbers
Plumbing
Mechanical/Heating
Insulation Certificate
Vapor Bamer Paint Certificate
Smoke Detectors
~ ~~ D
Final -Building
1. Contractors working on this project are required to have a Labor & Industries contractor's registration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESL) measures shall be installed on-site aad inspected prior
to beginning construction; ca11 385-2 29 4, press 3. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt
debris. Soils ezposed during construction shall be temporarily stabilized with mulching, plastic sheeting,
etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc, once construction is
complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 4 of 5
Pemtit p BLD00-076
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. Far Public Works inspection ca11385-2294, press 3. A
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal and approval prior to making changes in the field. Contact the Building
Department (379-3208) prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
i
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 5 of 5
,~