Loading...
HomeMy WebLinkAboutBLD00-0747 Watuman & Satz Building 181 Quinry Suee1, Suite 301 Port Towremd, WA 96368 Phone: (360)379-3208 Faz: (360)385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 far Inspection Permit Number: BLD~O-~74 Job Address: 1404 Chestnut Street Total Occupant Load: add 1 Owner: Robert A. Steele Contractor: Same as Owner GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMTI'S REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 RFnTTTRF.T) TNSPF.CTiONS APPROVED/DATE TEMP EROSION & SDM'T CONTROL Silt Fence as needed Drive Off Mat to restrict sediment from leaving the site and being tracked onto developed R-O-W FOOTINGS -engineered retaining wall; see page 5/S of engineering ~~~~ ~~~ Setbacks Footings Forms Reinforcement FOUNDATION -engineered retaining wall; page S/S of engineering / ~, ~ / ~ ~ ~ ~ ~. Stem Wall L Forms Reinforcement Issued: 5/11100 Parcel Number: 974402403 Zoning: RR=II Type: V-N Occupancy: R-3 Nature of Work: Remodel existine SFR; construct new entry and laundry room: add bedroom and study Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 4 Pemtit K HLDOO.p74 RE UIRED INSPECTIONS APPROVED/DATE i i FLOOR FRAMING Engineered BCI plan shall be on-site at Time of inspection Joists Blocking Sheathing-eng. nailingw/8dQ 4"o.a edges, 6"o.cfreld Hangers - IiJT 9 ~ each end PLUMBING: Rough-In (D-V-T & Clean outs) !~ ~~//~ " Water Supply c ~ Y Radiant Heat Tubing Water Hammer Arrester (ate clothes and dishwasher Gas Supply l /7/~ Hose Bibs (backflow protection required) ~ Pipe Insulation (R-3) Pressure Reduction Valve if> 80 psi Water Heater Seismic Restraint - 2 places Pressure relief valve drain to exterior, terminate 6" - 24" above ground MECHANICAL Ba er -installation instructions shall be on-site a fime of inspection; requires low water shut-off & high temperature shut-off urce Specific Fans ~ //~ ~~~ Environme a r x aus u mg (w/ backdraft l dampers), insulation (R-4) and terminus (located 3'from opening) Ca1148 hours before you dig for utility line locates I-800-424-5555 Page 2 of 4 + ~~ x stooo-ova RE UIRED INSPECTIONS APPROVED/DATE .~ FRAMING: Engineered Shear Walls ~/~(~~~ Walls CMST14 Straps per engineering Engineered Ledger @ Stair Landing Engineered Posts Beams & Headers Engineered Post/Beam/Connection @ Porch Roof -Engineered rafters 2 x 12 HF#2 Rafter Positive Connection Attic Venting - @ eaves 1/150 Windows -escape Windows -safety glazing Windows Ufactor - .50 or better NFRC window sticker must be on windows and doors at inspection time Doors - U-Factor - .45 full lite/.41 half lite Air Seal Fire Blocking Weather Resistive Barrier CHIMNEY p~ Z p/~ Straps L e Spark Arrester Termination DRY WALL NAILING watts l~Z~dl Ceiling l Enclosed Space Under Stairs l Z/l~/~ FINAL Public Works Sign-Off Fire Department Sign-Off (LPG) House Numbers Plumbing Mechanical/Heating Insulation Certificate Vapor Barrier Paint Certificate Smoke Detectors Final -Building ~~~/~~ ~: Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 3 of J eamit a acooo.ma ~ ,~ 1. Contractors working on this project are required to have a Labor & Industries contractor's re¢istration number and a t•.'ity business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass 5nal inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294, press 3. A _.._..~..~ .l ~.__~. t_._~ L_.. __ ...a... .- _.~-......J D..L L•- lS/....1... ..~~..,.....1 ...-a L.. -..-_'_._J ~..]_.. a. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon- residentialproject. 8. All building permits ezpire if no progress has been made within siz months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval prior to making changes in the field. Contact the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 4 of 4