• CITY OF PORT TOWNSEND
BUILDER'S PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLDOO-O73 Parcel Number: 974700202 Issued: 07!20100
Job Address: 2342 Sims Way Zoning: CC=11 Occupancy: SS=3
Nature of Work: Demolition of existing dispensers concrete pump islands, canopv footines/canopv.
footines/canopv with new concrete drive slab and asphalt pavement
Owner: Time Oil Company Contractor: Evergreen Environmental
(425J 787-8987
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS ItEOUIIiED:
ELECTRICAL (WA State Labor and Industries) (360)-417-2702
RF.(liiTRF.I) TNSPF.CTTONS
APPROVED/DATE
CONTAMINATED SOIL
In the event contaminated soil is found, all work shall cease. The
contractor shall contact the City Building Department and request a
site visit by the Building Official. No contaminated soil may be
removed prior to the visit by the Building Official. In the event,
contaminated soil is found a remediation plan shag be submitted for
approval to the Building Official regarding method ofdisposal,
stockpiling ofcontaminant and appropriate clean-up practices. All
activities shall be consistent with City ordinances and DOE
standards for removal and disposal ofeontaminated soils.
TEMPORARY EROSION/SEDIMENT CONTROL
Construction dust shall be kept to a minimum to avoid impacts to
neighboring properties. Ijdirt and debris are tracked onto adjacent
rights-of-way, contractor shall immediately install sediment control
measures that may include installation oja construction drive-off
mat, fire wash and/or sweeping of paved surfaces.
DEMOLITION
Materials from demolition shall be disposed of in areas off-site
meeting a!! qualifications as set forth by state and loco! law and
othergovernment agencies.
•
Ca1148 hours before you dig for utility locates
1-800~t24-5555
<~
Page 1 of 3 ~`
~,
Building Pe[mit #BLD00-073
REQUIRED INSPECTIONS APPROVED/DATF,
FOUNDATION
Canopy Footings -Sheet S-2 ~ (~
G) II ~h I I V
4' x 5 ; (optional 6' round) ll r l v\ J
Reinforcement -grade 60
per engineering, Sheet S-2
Anchor Bolts
per engineering, Sheet S-2
Guard Post Footing
Per detail,. Sheet 3 of 3
SLAB - see Sheet 2 of 3 of plans
Reinforcement
#4 @ I6" o.c. each way
PLUMBING ~1,,,..,,~ Gj 21 00
- pressure test required for gas lines ""~~ ""
EGowo/~ q lz~co ~-~/
FRAMING -per eogiceering
-Canopy framing, Sheet S-I
- Canopy connection details, Sheet S-2
LIGHTING
- see attached compliance
FINAL
Final - C-2 design standards compliance; contact
John McDonagh @ 379-5085
Final -Fire Department
Final -Electrical (L & n
Plumbing
Final-Building
GENERAL .CONDITIONS
1. A sepazate electrical permit is required for any electrical work.
2. Re-inspections aze required aRer any corrections are complete.
3. Final Inspections and approvals are required.
Ca1148 hours before you dig for utility locates
1-880-424-5555
Page 2 of 3
Building Permit kBLD00-073
. 4. All Building Permits expire if no progress has been made within six months or, if no
inspections have been made by the Building Department within one year. Call for at least
one inspection per year to keep your permit active.
5. Revisions require review and approval prior to making changes in the field. Contact the
Building Department at 379-3208 prior to making changes to the approved plans.
6. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility locates
1-800-424-5555