Loading...
HomeMy WebLinkAboutBLD00-073City of Port Townsend 181 Quincy Street Suite 301 Pon Townsend. W A 98368 Phone (360) 379-3208 Fax (360) 383-7675 • CITY OF PORT TOWNSEND BUILDER'S PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLDOO-O73 Parcel Number: 974700202 Issued: 07!20100 Job Address: 2342 Sims Way Zoning: CC=11 Occupancy: SS=3 Nature of Work: Demolition of existing dispensers concrete pump islands, canopv footines/canopv. footines/canopv with new concrete drive slab and asphalt pavement Owner: Time Oil Company Contractor: Evergreen Environmental (425J 787-8987 GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS ItEOUIIiED: ELECTRICAL (WA State Labor and Industries) (360)-417-2702 RF.(liiTRF.I) TNSPF.CTTONS APPROVED/DATE CONTAMINATED SOIL In the event contaminated soil is found, all work shall cease. The contractor shall contact the City Building Department and request a site visit by the Building Official. No contaminated soil may be removed prior to the visit by the Building Official. In the event, contaminated soil is found a remediation plan shag be submitted for approval to the Building Official regarding method ofdisposal, stockpiling ofcontaminant and appropriate clean-up practices. All activities shall be consistent with City ordinances and DOE standards for removal and disposal ofeontaminated soils. TEMPORARY EROSION/SEDIMENT CONTROL Construction dust shall be kept to a minimum to avoid impacts to neighboring properties. Ijdirt and debris are tracked onto adjacent rights-of-way, contractor shall immediately install sediment control measures that may include installation oja construction drive-off mat, fire wash and/or sweeping of paved surfaces. DEMOLITION Materials from demolition shall be disposed of in areas off-site meeting a!! qualifications as set forth by state and loco! law and othergovernment agencies. • Ca1148 hours before you dig for utility locates 1-800~t24-5555 <~ Page 1 of 3 ~` ~, Building Pe[mit #BLD00-073 REQUIRED INSPECTIONS APPROVED/DATF, FOUNDATION Canopy Footings -Sheet S-2 ~ (~ G) II ~h I I V 4' x 5 ; (optional 6' round) ll r l v\ J Reinforcement -grade 60 per engineering, Sheet S-2 Anchor Bolts per engineering, Sheet S-2 Guard Post Footing Per detail,. Sheet 3 of 3 SLAB - see Sheet 2 of 3 of plans Reinforcement #4 @ I6" o.c. each way PLUMBING ~1,,,..,,~ Gj 21 00 - pressure test required for gas lines ""~~ "" EGowo/~ q lz~co ~-~/ FRAMING -per eogiceering -Canopy framing, Sheet S-I - Canopy connection details, Sheet S-2 LIGHTING - see attached compliance FINAL Final - C-2 design standards compliance; contact John McDonagh @ 379-5085 Final -Fire Department Final -Electrical (L & n Plumbing Final-Building GENERAL .CONDITIONS 1. A sepazate electrical permit is required for any electrical work. 2. Re-inspections aze required aRer any corrections are complete. 3. Final Inspections and approvals are required. Ca1148 hours before you dig for utility locates 1-880-424-5555 Page 2 of 3 Building Permit kBLD00-073 . 4. All Building Permits expire if no progress has been made within six months or, if no inspections have been made by the Building Department within one year. Call for at least one inspection per year to keep your permit active. 5. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 379-3208 prior to making changes to the approved plans. 6. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility locates 1-800-424-5555 Page 3 of 3 >.