CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLDOO-O72 Issued: 4121/00 Parcel Number: 955900061
Owner/Contractor: Hamilton Heiehts LLC Installer: Kozeliskv's Home Services WAINS0626
Job Address: Lot 61 2680 Hiehland Loop Zoning: PUD Type: V_N Occupancy: R-3/U-1
Total Occupant Load: 512 Nature of Work: Set Manufactured Home w/ attached site-built saraee and
deck
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REOUIItED:
Electrical -Contact Labor & Industries @ 360-417-2702
* * *Hours of Construction are limited to 7:30 a. m. to 6: 00 p. m. Monday through
Friday and prohibited on weekends and national holidays***
RF.(1TTTRF.n TNCPF.( TT[)NS
TEMP EROSION & SEDIMENT CONTROL
See details attached toMIP and general condition #2
Silt Fence
Drive Off Mat
SLAB/CONCRETE
Setbacks s/Z/~6 l-'
Forms
Monolithic Slab/Foundation (garage) ~j.~,Q tl/y
~5/D
"
Reinforcement ~~
~
Anchor Bolts
Alternate Braced Wall Panel Holdown Hardware
UFER
APPROVED/DATE
Ca1148 hours hefore you dig for utility line locates
1-800-424-5555
Page 1 of 4
~-~(.
Permit # BI.n00-0?3
REOUIItED INSPECTIONS
APPROVED/DATE
FLOOR. FRANIING (prior to skirting)
Anchors
Steel Support Piers -Load-stamped and installed per
manufacturer's installation marmal; clearance of I8"min. from
lowest point of I-beam and the ground or footing for min. of 75%
of area under home w/ 11 "min. elsewhere unless installation
manual spec j~es; otherwise area around home graded to provide
runoff away from home
PLUMBING:
Water Supply -Main shut-o„~'valve (port or ball valve)
installed in water supply piping prior to connection to home, min
°/. ° diameter, same as suPPly Piles
Pressure Reduction Valve if> 80 psi
Hose Bibs (backflow protection required)
Pipe Insulation -Outside & in crawl space
Pressure Test -100 p.s.t. for IS minutes
Pressure relief valve drain - to exterior of skirting, exhaust
dowmvard between 6"and 14"above ground
Drainage Piping -sloped min. ~/. "per foot
MECHANICAL
Ducts & Duct Insulation
Dryer Exhaust -vented to outside. Extenrio» into crawl space
requires venting through skirting with no dips; follow dryer
manufacturer's instructions; total combined length of ducting not
to exceed 14' w/ 2-90° elbows
FRAMING:
Fargineered roof truss plan to be on-site at time of inspection
7/? ~~ ~}~
Walls C~ K~
Alternate Braced Wall Panels
Header
Roof
Gatage/House Attachment
DRY WALL NAILING /
GaragelHouse Occupancy Separation w/20 minute self-closing ~l ~s
~~
door t
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 4
Permit # BID00~07I
Public Works Sign-Off
Electrical (L & I) Sign-Off
House Number - 5" numbers
Plumbing
Mechanical
Deck
Final -Building
No holes or gaps greater than ~/."allowed
in skirling. Skirting to be rated for contact with
earth if baclcfill is involved
Crawl space ventilation per installation
manual @ 1/150 (16 req'd); located close to
corners, on at least two opposing sides for cross
ventilation.
Crawl space access must provide access to
all areas under home; minimum 18"x 24"
unless specified otherwise; covered with vinyl,
pressure-treated wood or metal.
7~2 ~~oo (~,~
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's
reeistration number and a City business license. Failure to provide proof of this documentation prior to
work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected
prior to beginning construction; ca11385-2294, press 3. Measures shall include installation of silt
fencing and graveled construction entrance (see attached details). Soils ezposed during construction
shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized
with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for
protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspeMion prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re-inspection is required after any corrections are completed.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 4
Permit # BI,D00-072
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected For Public Works inspeMion ca11385-2294, press 3;
minimum oftwenty-four hours notice is required. Public Works approval must be received prior to
scheduling the Building Department's final inspection.
7. Final Inspections snd Certificate of Occupancy are required PRIOR to occupancy.
8. All building permits ezpire if no progress has been made within siz months, or if na inspections are
done by the Building Department within one year. Call for at least one inspeMion per year to keep your
building permit active.
9. Revisions require review and approval prior to making changes in the field. Contact the Building
Department 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.