HomeMy WebLinkAboutBLD00-068Waterman $ KalzBuolding
1 BI Quincy Sttee4 Suite 301
Port 7owisaM, WA 98368
Phoar (360) 379-3208 Fax: (360) 385-7675
•
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLDQD-06g
Job Address: 2700 Jefferson Street
Issued: 6113!00 Parcel Number: 1104002
Zoning: M-II A Type: V-N Occupancy: F_I
Nature of Work: Construct temporary boat/woodworkine structure
Owner: Dave Thompson
379-7176
Contractor: Same as Owner
GENERAL CONDITIONS APPLY -SEE LAST PAGE
RE UIRED INSPECTIONS
APPROVED/DATE
FRAMING: See engineering details
Walls
Posts and Steel Anchor Plates
Roof Panels
2 x 6 @ 4' o.c. with joist hangers and tie-down
straps
Doublejoists @ outside panel edges with lOd
nails, minimum 2 nails/foot
Metal roofing to manufacturer's specs but not
less than (2) 6d nails/foot
Blocking/X Bracing per engineering
Column connections
FINAL
Fire Department Sign Off
Final Electrical (L & 1)
Building Numbers
Final -Building
Call 48 hours before you dig for utility line locates
I-800-424-5555
Page I of 2
Permit KgLD00.P68
ENERAL CONDITION
1. Contractors working on this project are required to have.a Labor & Industries contractor's reeistration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; ca11385-2294, press 3. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt
debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting,
etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is
complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
•
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3. A
minimum of twenty-four hours notice is required. Public Works aonroval must be received arior to
scheduline the Buildine Department's final inspection.
1. Final Inspections are required prior to occupancy; a Certificate of Occupancy is required for anon-
residentialproject.
8. All building permits expire if no progress has been made within siz months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal & approval prior to making changes in the field. Contact the Building
Department ~ 379-3208 prior to making changes to the approved plans.
10. POST TffiS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 2