HomeMy WebLinkAboutBLD00-066WeWman & Kali Building
181 Quincy Sued, Suim 301
PoR Towlue~d, WA 98368
PMne: (360)379-3208 Fax: (360)385-7675
CITY OF PORT TOWNSEND
•
C~
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLDOO-O66 Issued: 415100 Psrcel Number: 989703901
Job Address: 1004 Water Street Zoning: C-III Type: VV=N Occupancy: N/C
Totsl Occupant Load: N/C Nature of Work: Pedestrian Protection, clean and tuckooint masonry
Owner: Port Townsend Hotel Investors I Contractor: Olvntoic Masonry Restoration
(360)385-5757
GENERAL CONDITIONS APPLY -SEE LAST PAGE
RFf1TTTRF,TI TIVCPF,("TinNS
APPROVED/DATE
SEDIlVIENT CONTROL
Sweep Concrete & Paved Surfaces during
construction as needed
PEDESTRIAN PROTECTION -Inspection ~~(pl(jU
required prior to beginning work
Provide Protection per UBC and attached scope of
Work.
PAINT
Colors per HPC Paint Registration Form
FINAL
Building Number
Final -Building
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
Permit # BLI700.066
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor 8c Industries contractor's reeistration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; ea1138S2294, press 3. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt
debris. So7s ezposed during construction shall be temporarily stabilized with mulching, plastic sheeting,
etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is
complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, boldowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's aged shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re•inspection is required after inspection report corrections are Completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected: For Public Works inspection call 385-2294, press 3. A
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon-
residentialproject.
8. All building permits ezpire if no progress has been made within siz months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit aMive. -
9. POST THIS PERMIT ONSITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates
I-800-424-5555
Page 2 of 2