HomeMy WebLinkAboutBLD00-064r
~~
W~termu~ g KnzBuilding
I81 Quinry 31rtn, Sui1a 301
Pan iowMend, WA 98368
PMm: (360) 3M•3~08 F4: (360) 385-76?6
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: $LD~~-~64
Job Address: 1205 Jackman Street
Total Occupant Load: 10/3
Owner: LaVauehn Snell
Issued: 518100 Parcel Number: 948305002
Zoning: RR=TI Type: V_N Occupancy: R-3/U-1
Nature of Work: Construct Sin¢le family residence wJ earaee
Contractor: Randv Cranston Construction
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
RFnTTTRF.n TNSPF,[:TTnNS
APPROVED/DATE
TEMP EROSION & SDM'T CONTROL
Inspection regurred prior to food»gs -See General
Coruiition No. 2
Silt Fence as needed
Drive Off Mat to restrict sediment from leaving
the site
GROUNDWORK PLUMBING
Pressure Test
Pipe Joints Exposed
Pipe Bedding .
Propane Drain
FOOTINGS ~ICjC~/01~ S-/Z 3~/~~
! ~6
Setbacks
Footings
o II ot<- n t~ (~ .
d `~ ' !l~ '
~
~ Z a °
Deck F
otings ~~~~-~~d ~ ~1
u
L
Forms
Reinforcement ~~~ ~,~ ~1 Z~2°va fN~,
UFER
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 5
',~~
«8~.~.~.
REQUIRED INSPECTIONS APPROVED/DATE
FOUNDATION
Stem Wall
Forms
Reinforcement O~ ~ 1~2 (~ p
I`~
Anchor Bolts j x
Beam Pockets 612 Zpco
Holdown Hazdwaze -per engineesing
Waterproofing
sLAS
Interior Footings - 3 ' x 3' x 8"per engtneering with D ~-n,t~ z ~. n
o
(4) #4 bars each way
Thickened Footings
Insulation - @ perimeter w/R-10 under eirtire slab
Thermal Break @ garage
Radiant Heat Tubing
FLOOR FRAMING
Engineered BCI plan shall be on-site at
~ /Z ~~~
time of inspection; plan & engineering shall include
loading from lightweight concrete floor
Girders
Joists _
Blocking
Shield under posts
Sheathing - eng. '/." T & G floor sheathing @ F-2
Positive Connection
Beam Pockets
Treated Wood to Concrete g~ 23 l 0 0
o ~ M / I~ fd~ <,c
Anchor Bolts
Radiant Heat Tubing
~.oiati7 rvBG / v~
PLUMBING:
Rough-In (D-V-T & Clean outs) ~
~
~
Water Supply (,~ V
~~ e ~6LQt,w _ ,
1~~`
i ~` U
Gas Supply ~~
"
E{'
1
Hose Bibs (backflow protection required) ~
2am, '
Pipe Insulation (R-3)
Pressure Reduction Valve if > 80 psi
Water Heater (o,qs ~$~~ r ~~P ~~~ r ~Q/~~
Seismic Restraint - 2 places
Pressure relief valve drain to exterior, terminate
6" - 24" above ground
Ca1148 hours before you dig for utility line locates
I-800-424-5555
Page 2 of 5
RE UIRED INSPECTIONS
APPROVED/DATE
Prneil # BLD00-064
MECHA1vICAL
Boiler -installation instructions shall be on-site at
rime of inspection; requires low water shut-o~'&
high temperature shut-o,~'
Whole House Fan -Utility Room
Source Specific Fans
Environmental Air )~xhaust ducting (w/ backdraft
dampers), insulation (R-4) and terminus (located
3'from opening)
FRAMING:
Engineered connections @ F-1 shear wall
Engineered Shear Walls -hand nail all sheathing; ~,
2 /
do not overdrive; double studs and double ?/
~
blocking per engineering.
Walls
Dumbwaiter ~
~~
Floors/Ceilings ~~~ ~
~
~
Engineered Posts Beams & Headers -continuous
headers @ F-1 & F-2 shear walls
Roof -Engineered detail for roof sheathing F-2
wall
Rafter Positive Connection
Attic Venting -soffit and ridge vents
Windows -escape
Windows -safety glazing
Windows Ufactor - .45 max.
NFRC window sticker must be on windows,
doors and skylights at inspection time
Fresh Air Intake (Window Ports)
Skylights - U-factor - .68
Doors - U-Factor - .40
Air Seal
Fire Blocking
Weather Resistive Barrier
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 5
Pmmit Y BLDOD.066 ~ < "
RE UIRED INSPECTIONS
APPROVEDJDATE
INSULATION
Floor (~)
Walls ($19)
Ceiling (R-30 vault/R-38 attic )
Bathes
Vapor Barrier: face-stapled batts , ]_nn• ~~ tt IIq',0~
(/0 ~l/~` ~ f J~~~(~
'
DRY WALL NAII.ING
Walls ~// ,/~oo n n
(d~ ~/
Ceiling
Enclosed Space Under Stairs
Dumbwaiter Shaft
GaragelFIouse Occupancy Separation
FINAL
Public Works Sign-Off
Fire Department Sign-Off (LPG) „O
~~ ly y/~
f '
/
House Ntunbers i
~
/
Plumbing
Mechanica!/Heating
Insulation Certificate
Smoke Detectors
Final -Building
1. Contractors working on this project are required to have a Labor 8c Industries contractor's registration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspeMed prior
to beginning construMion; call 385-2294, press 3. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt
debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting,.
etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is
complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
{ABWP) require inspection prior to cover.
Ca1148 hours before you dig for utility line locates
I-800-424-5555
Page 4 of 5