CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number; BLDOO-O6OR-2 Issued: 6/28/00 Parcel Number: 1104002
Job Address: 290 10th Street
Occupant Load: 24
Zoning: MII-A Type: VV=N Occupancy: F-1
.Nature of Work: Revision #2• provide second exit with stairs per original permit condition
Owners: Lisa Vizzini and Dan Kulin
Contractor: Grant General Contracting Inc.
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMTI'S REQUIItED:
Electrical -Contact Labor and Industries @ 360-4I7-2702
u>~nTrTUFTI TNCPFfTT(1N~
APPROVED/DATE
1\L V 1a~+~v
FRAMING
Pressure Treated
Positive Connection
Barrier-free Design
Door
Threshold
Exit Signage
Width
Manuvering Clearance
Stairs
Guardrails
Handrails
Landings
FINAL
See Originallnspection Record
Call 48 hours before you dig for utility line locates
I-800-424-5555
Page 1 of 2
Pmnitk BLD00-060R-Z
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's registration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; call 385-2294, press 3. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt
debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting,
etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is
complete. Applicant is responsible for protection of adjacent properties.
3. A11 elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required afrer inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294, press 3. A
7. Final Inspections are required prior to occupancy; a Certificate of Occupancy is required fora non-
residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal and approval prior to making changes in the field. Obtain revisions from the
Building Department (379-3208) prior to making changes to the approved plans.
L0. POST THIS PERMIT ONSITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 2
Watermm ffi KazzBuilding
- 181 Quinry Skeet, Suile 301
Pan Tow~uend, WA 98368
PMne: (360) 379-3208 Fax: (360) 385-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
.THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLDOO-ODOR-1 Issued: 4/18/00 Parcel Number: 1104002
Job Address: 29010th Street Zoning: MII-A Type: VV=N Occupancy: F-1
Nature of Work: Construct Foundation For New Steel Building Occupant Load: N/A. Foundation Onlv
Owner: Lisa Vizzini and Dan Kulin Contractor: Grant General Contracting Inc.
GENERAL CONDITIONS APPLY -SEE LAST PAGE
NOTE: FOUNDATIONPERMIT ONLY
RF.f1TTTRF.T1 TNCPF,C"TT()NS
APPROVED/DATE
TEMP EROSION & SDM'T CONTROL
Site is flat; control measures to be installed as
needed during construction
FOOTINGS -see approved engineering details
Setbacks -per UBC
S~l~/DO
20' for exterior walls
openings protected < 1 D'
openings prohibited < 5'
Footings below grade
Interior footings
Forms
Reinforcement -grade 60 steel
SLAB -refer to approved engineering ~
~~
OV n n
Forms /
~
~-(~
Reinforcement-grade 60
Anchor Bolts
Slab/Radiant
- R-10 under slab not required per engineer's
report: saturation level of soil @ 4'
- R-10 @ perimeter not required per NREC
n
envelope calculati
o
/ ~ ~
/
/
UFER ~lZ~SU///,D !~~ /~~~~"r~ ' ~ /J
S I~QZ~ ~C
Ca1148 hours before. you dig for utility line locates
I-800-424-5555
Page 1 of 2
Permit#BLD00-O60R-1
FINAL -refer to structure permit
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
Z. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; ca11385-2294, press 3. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt
debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting,
etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is
complete. Applicant is responsible for protection of adjacent properties.
3. Al! elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corcections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3. A
7. Final Inspections are required prior to occupancy; a Certificate of Occupancy is required for anon-
residential project.
8. All building permits expire if no progress has been made within sia months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal and approval prior to making changes in the field. Obtain revisions from the
Building Department (379-3208) prior to making changes to the approved plans.
10. POST THIS PERMIT ONSITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 2
Watermm ~ Katz Building
181 Quinry Street, Suite 301
Part Townund, WA 98368
Phone: (360) 379-3208 Fax: (360) 385-7675
CITY OF PORT TOWNSEND
i
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLDOO-OGO Issued: 5131/00 Parcel Number: 1104002
Job Address: 29010th Street Zoning: MII-A Type: VV=N Occupancy: F-1
Nature of Work: Construct New Steel Building Occupant Load: 24
Owner: Lisa Vizzini and Dan Kulin
Contractor: Grant General Contracting Inc.
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor and Industries @ 360-417-2702
<1'QTE: Special Inspection required for high strength bolting per I/BC Section 1701. S Item 6. Special
Inspector shall be ICBO certified and listed in the current edition of WABO Agency and Inspector
Register or present credentials to the Building Department prior to performing inspections. Required
Special Inspection Reports shall indicate compliance with the plans and specifications and shall be
copied to the Building Department in atimely manner. Permit Holder or Permit Holder's Agent shall
review and oversee correction of any and all deficiencies noted by required special inspections.
RF.f)TTTRF.TI TNSPF,(-'TTONS
APPROVED/DATE
TEMP EROSION & SDM'T CONTROL
Site is flat; control measures to be installed as needed
during construction
FOUNDATION -Issued under separate permit
#BLD00-060R-i
PLUMBING-Barrier Free Design Required C~~" CJl~ ~,3
CK
~
~
Rough-In (D-W-V & Clean OutsO .
G~
Water Supply
LPG Supply
Pipe Insulation (R-3)
Pressure Reduction Valve if pressure > 80 psi
Hydronic Tubing
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 4
S
Ymoit#BLD00-060
REQUIRED INSPECTIONS
APPROVED/DATE
MECHANICAL
Boiler -manufacturer's i»stallation
l ~ ~~ ZO f DO
instructions shal
be on-site at time of
inspection
Fresh Air -compliance with I/10 of floor
area in openings
Source Specific Fan @ Bathroom -terminus 3'
from building openings
NREC Temperature Zones
Thermostat Controls per NREC 1412.1
FRAMING -High strength bolting requires
i
l
l ~2 ~/~ nQ
`~
inspect
specia
on
Walls
Roof
Roof Venting
Posts, Beams & Headers
Fireblocking @ 10' o.c. horizontal and vertical
Air Seal
Windows U-factor - .90 or better
NFRC window sticker must be on windows at inspection
time
Doors U-factor - .60 & .11 (includes roll ups)
INSULATION
Walls-R-19
~~~~~~
Roof - R-30
Baffles
Vapor Barrier Required
DRYWALL/NAIIdNG
Walls /
(~/ ~~0®
Ceiling l
LIGHTING
Lighting Budget -prescriptive option
Daylight, Zones
PARHING
See Approved Plans
One (1) Van Accessible Space Required
CaI148 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 4
t
e~~ a etooo.ao
FINAL -revision required prior to occupancy
to provide jor 2"d exit from F-2 /1
Property Addess Posted I ~,~ j (J~~/
Fire Department Approval -see attached memo dated I
S/30/00
Public Works Department Approval
Electrical Approval (L & I)
Insulation Certificate
Vapor Barrier Paint Certificate (if applicable)
Barrier Free Access
Plumbing
Mechanical
Building
GENERAL CONDITIONS
•
1. Contractors working on this project are required to have a Labor & Industries contractor's registration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; call 385-2294, press 3. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt
debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting,
etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is
complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate. braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3. A
7. Final Inspections are required prior to occupancy; a Certificate of Occupancy is required fora non-
residential project.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 4
-r
Permit#BLD00-060
8. All building permits expire if no progress has been made within siz months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal and approval prior to making changes in the field. Obtain revisions from the
Building Department (379-3208) prior to making changes to the approved plans.
10. POST THIS PERMIT ONSITE WITH THE APPROVED PLANS.