Loading...
HomeMy WebLinkAboutBLD00-058BuBding and CommvnHy Development Wvtermvv & ICa1s Huilding 181 QaWry SY,eeq Bulte 301 Phoce: (360) 779J208 Fat: (360)3817675 C ~. CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: }3T.D00-U58 Job Address: 821 Jefferson Street Nature of Work: Owner: Penee D'Amico (379-8226) Issued: 3/28100 Parcel Number: 989710501 Zoning: C_III Type: VAN Contractor: Michael Cozen (385-5527) Occupancy: AA_3 *SPECIAL CONDITION - Note: Permit per scope of work only; additional work requires submittal of revision or separate permit'* GENERAL CONDITIONS APPLY -SEE BACK RF.nTTTRF.TI TNCPF.(`TiONC APPRnVED/DATE FRAMING Siding S S ~ Flash around openings e barrier r resisti We th r, ~ '~ ~ ~ e v a W ll ~ ~ ~S~ ~\ ~` 1 a s ~ ~~1 Fur out basement walls et horizontal and vertical Fireblock @ 10 f G~/ e FINAL House Numbers -check for 5" numbers throughout per 1997 TJBC Smoke Detectors Final -Building CALL 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 Pmoa XBLIMO-0SS ENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business licenses Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures ahaD be installed on-site and inspected prior to beginning construction; call 3852294, press 3. Measures shall include instaAation of silt fencing and graveled construction entrance (nee attached details). Adjacent rights-of-way shall be kept frce of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. • 3. All elements of engineering indnding nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass fmal inspection on your project until Public Works requirements have ban completed and inspected. For Public Works inspection call 385-2294, press 3. A minimum of twenty-four hours notice is required. Public Works aonroval must be received nrior to scheduling the Building Department's final insnection. _ 7. Final Inspections are required prior to occupancy; a Certificate of Occupancy is required fora non- residential project. 8. All building permits expire if no progress has ban made within siz months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal & approval prior to making changes in the field. Contact the Building Department @ 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. CALL 48 hours before you dig for utility line locates 1-800.424-5555 Page 2 of 2