Loading...
HomeMy WebLinkAboutBLD00-056 Waterman and ICatt Building 181 Quincy Street Suite 30l PoA Townsend, WA 98368 Phone (360) 379-3208 Faz (360) 383-7673 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION STTE Calt 385-2294 Tor Inspection Permit Number: BLDOO-O56R-2 Issued: os/21!00 Parcel Number: 948317803 Job Address: 1365 McClellan Street Zoning: R-111 Type: VV=N Occupancy: R-3/U-1 Total Occupant Load: 412 Nature of Work: Add (61 Z°4° skvliehts; convert 6°4° master bedroom window to 5°6° slidin¢ Blass door Owner: Cavette ConstruMion Inc 355-3247 301-0527 (cell) Contractor: Same as Owner GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 REQUIRED INSPECTIONS APPROVED/DATE FRAMING: Windows Ufactor - .39 or better NFRC window sticker must be on windows, skylights & doors at inspection time Skylights Ufactor - .58 or better Door Ufactor - SGD @ .41 okay for UA FINAL Refer to original inspection record GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished, Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 Building Permit #BLD00-056R-2 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of way shall be kept free of dirt and debris. Soils exposed during construMion shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after any corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3; a minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Departments final inspection. 7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year: Call for at least one inspection per year to keep your building permit aMive. 9. Revisions require review and approval prior to making changes in the field. Contact the Buildi• Department at 379-5086 urior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2 Watermauand ICaiz Building 181 Qu~Y Street Suite 301 Port Townsend, WA98368 Phone (360) 379-3208 Faz (360) 385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD TffiS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLDOO-O56R-1 'Issued: 04/10/00 Parcel Number: 948317803 Job Address: 1365 McClellan Street Zoning: R-111 Type: V_N Occupancy: R-3/U-1 Total Occupant Load: 4/2 Nature of Work: New Sin¢le-family Dwellin¢ w/ ¢ara¢e Owner: Cavette Construction Inc 385-3247 301-0527 (cell) Contractor: Same as Owner GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMTTS REOUD2ED: Electrical -Contact Labor & Industries @ 360-417-2702 REOTTIRED INSPECTIONS APPROVED/DATE TEMP EROSION & SDM'T CONTROL See foundation permit #BLD00-056 FOOTINGS -refer to separate foundation permit #BLD00-056 FOUNDATION -refer to foundation permit #BLD00-056 FLOOR FRAIVIING Engineered BCI plan to be on-site @ time of (~~~ ~f ~ J >,~/ _, ~ inspecfron /// ( L/ Girders Joists Blocking Shield under Posts Positive Connection Girder to Concrete Beam Pockets Treated Wood to Concrete Anchor Bolts & Washers Foundation Vents - 14 required Call 48 hours before you dig for utility line locates 1-800-424-5555 Page I of 4 Building Permit #BLD00.056A 1 REQUIRED INSPECTIONS APPROVF,nmATF. PLUMBING: - - -------- Rough-In (D-V-T & Clean huts) Water Supply Water Hammer Arrester @ clothes and dishwasher Hose Bibs (backflow protection required) Pipe Insulation - R-3 Pressure Reduction Valve if> 80 psi Water Heater R-l0 under Seismic Restraint -strap @ 1/3 poirns 18" A.F.F. Pressure relief valve drain to exterior, terminate b" - 24" above ground MECHANICAL Electric Forced Air Manufacturer's Installation Instructions to be on-site @ time of inspection Ducts & Duct Insulation - Supply~esh air ducts in cortditianed space: R-4; heating ducts in unconditioned space: R-8 Whole House Ventilation HVAC Integrated Fresh Air T' Smooth Duct minimum Terminal Element - 8" Clock timer on furnace fan Other than motorized damper requires letter of certification for flow rates Source Specific Fans Environmental Air Exhaust ducting, insulation (R-4) and terminus (located 3' from opening) Ca1148 hours before you dig for utility line locates 1-800.424-5555 Page 2 of 4 Building Permit #BLD00-056R-1 RF,OTTTRF,D INSPECTIONS APPROVED/DATE FRAl1-IING: -- Walls Alternate Braced Wall Panels Roof-Engineered truss plan to be on-site at lime of inspection Attic Venting -ridge & eave Ceilings Posts, beams & headers Windows -escape Windows- safety glazing (SGD) Windows Ufactor - .40 max. NFRC window sticker must be on Windows, skylights & doors at inspection time Skylights Air Seal Doors Ufactor -entry door exempt Rafter/Truss Positive Connection Weather Resistive Barrier INSULATION Floor (R-30 ) Wall(R-19) Ceiling (R 38 ) Baffles Vapor Barrier: paint Crawl space - 6 mil black poly DRY WALL NAILING Walls Ceiling ~ ~~ r~'~"rc 8 ~ 23 ~~ ~ l Garage/I3ouse Occupancy Separation Interior Braced Wall Panels FINAL Public Works Sign-Off House Numbers - 5" high Plumbing Mechanical -Ventilation Certification for Integrated System Insulation Certificate V. B. Paint Certif cafe Smoke Detectors Final -Building Catl 48 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 4 Building Pami[ #BLDOOA56R<1 GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this,is accomplished 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-af way shall he kept free of dirt and debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjace~ properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re•iaspeetion is required after any corrections are completed. • 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspeMed. For Public Works inspection call 385-2294, press 3; a minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 379-5086 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates • 1-800-424-5555 Page 4 of 4 Waterman & KatzSuilding 181 Quinry 8tree4 Suitc 301 Pon Toamae~ WA 98368 Phone: (360)379-3206 Fax: (360)3796923 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD TffiS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLD00-056 Issued: 3/28/00 Parcel Number: 948317803 Job Address: 1365 McClellan Street Zoning: R III Type: VV=N Occupancy: R-3/U-1 Nature of Work: Foundation Permit Onlv For Dwellin¢ & Gara¢e Owner: Cascadia Merchantile/Neil Cavette Contractor: Cavette Construction (360) 385-3247 GENERAL CONDITIONS APPLY -SEE LAST PAGE NOTE: FOUNDATIONPERMIT ONLY-Resulting structure must be compatible with foundation design and must comply with all applicable codes RF.n7TTRF.TI TNCPF.C"TTnNS APPROVED/DATE ~J TEMP EROSION & SEDIlVIENT CONTROL See General Condition No. 2-inspection required ' prior to foundation work. Graveled construction entrance to prevent dirt from leaving the site FOOTINGS , / Setbacks - F=20', R=10', S=S', 5=10'(ROW) ~~~~~ v Footings -bottom of footing: 12" below grade Forms Reinforcement Interior footings Porch/Deck Piers UFER FOUNDATION , //? D Stem Wall - 6" wide ~O ~l Forms Reinforcement Anchor Bolts Vents - 14 required Crawl Access Beam Pockets AB WP Holdown Hardware Ca1148 hours before you dig for utility line locates 1-800.424-5555 Page 1 of 2 PmnitNBLDOD-0.5b' w REOi7IRED INSPECTIONS APPROVED/DATE SLAB Garage -nonstructural; no inspection required ~ FINAL Concrete work GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Fa~7ure to provide proof of this documentation prior to work may result in job shut down while this is accomplished 2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294,. press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shalt be kept free of dirt debris. Soils ezposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294, press 3. A minimum of twenty-four hours notice is repaired. Public W orks aourovat must 6e received prior to scheduling the Building Department's final inspection. Final Inspections are required prior to occupancy; a Certificate of Occupancy is required for a non-residential project. 8. All building permits ezpire if no progress has been made within sia months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval prior to making changes in the field. Obtain revisions from the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-STI'E WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2