CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION STTE
Calt 385-2294 Tor Inspection
Permit Number: BLDOO-O56R-2 Issued: os/21!00 Parcel Number: 948317803
Job Address: 1365 McClellan Street Zoning: R-111 Type: VV=N Occupancy: R-3/U-1
Total Occupant Load: 412 Nature of Work: Add (61 Z°4° skvliehts; convert 6°4° master
bedroom window to 5°6° slidin¢ Blass door
Owner: Cavette ConstruMion Inc
355-3247 301-0527 (cell)
Contractor: Same as Owner
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
REQUIRED INSPECTIONS
APPROVED/DATE
FRAMING:
Windows Ufactor - .39 or better
NFRC window sticker must be on
windows, skylights & doors at inspection time
Skylights Ufactor - .58 or better
Door Ufactor - SGD @ .41 okay for UA
FINAL
Refer to original inspection record
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's
reeistration number and a City business license. Failure to provide proof of this documentation prior to
work may result in job shut down while this is accomplished,
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
Building Permit #BLD00-056R-2
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected
prior to beginning construction; ca11385-2294, press 3. Measures shall include installation of silt
fencing and graveled construction entrance (see attached details). Adjacent rights-of way shall be kept
free of dirt and debris. Soils exposed during construMion shall be temporarily stabilized with mulching,
plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once
construction is complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re-inspection is required after any corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3; a
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduling the Building Departments final inspection.
7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy.
8. All building permits expire if no progress has been made within six months, or if no inspections are
done by the Building Department within one year: Call for at least one inspection per year to keep
your building permit aMive.
9. Revisions require review and approval prior to making changes in the field. Contact the Buildi•
Department at 379-5086 urior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 2
Watermauand ICaiz Building
181 Qu~Y Street Suite 301
Port Townsend, WA98368
Phone (360) 379-3208 Faz (360) 385-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
TffiS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLDOO-O56R-1 'Issued: 04/10/00 Parcel Number: 948317803
Job Address: 1365 McClellan Street Zoning: R-111 Type: V_N Occupancy: R-3/U-1
Total Occupant Load: 4/2 Nature of Work: New Sin¢le-family Dwellin¢ w/ ¢ara¢e
Owner: Cavette Construction Inc
385-3247 301-0527 (cell)
Contractor: Same as Owner
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMTTS REOUD2ED:
Electrical -Contact Labor & Industries @ 360-417-2702
REOTTIRED INSPECTIONS
APPROVED/DATE
TEMP EROSION & SDM'T CONTROL
See foundation permit #BLD00-056
FOOTINGS -refer to separate foundation permit
#BLD00-056
FOUNDATION -refer to foundation permit
#BLD00-056
FLOOR FRAIVIING
Engineered BCI plan to be on-site @ time of
(~~~ ~f ~ J >,~/ _,
~
inspecfron /// (
L/
Girders
Joists
Blocking
Shield under Posts
Positive Connection
Girder to Concrete
Beam Pockets
Treated Wood to Concrete
Anchor Bolts & Washers
Foundation Vents - 14 required
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page I of 4
Building Permit #BLD00.056A 1
REQUIRED INSPECTIONS APPROVF,nmATF.
PLUMBING: - - --------
Rough-In (D-V-T & Clean huts)
Water Supply
Water Hammer Arrester @ clothes and dishwasher
Hose Bibs (backflow protection required)
Pipe Insulation - R-3
Pressure Reduction Valve if> 80 psi
Water Heater
R-l0 under
Seismic Restraint -strap @ 1/3 poirns
18" A.F.F.
Pressure relief valve drain to exterior,
terminate b" - 24" above ground
MECHANICAL
Electric Forced Air
Manufacturer's Installation Instructions to be
on-site @ time of inspection
Ducts & Duct Insulation - Supply~esh air ducts in
cortditianed space: R-4; heating ducts in
unconditioned space: R-8
Whole House Ventilation
HVAC Integrated Fresh Air
T' Smooth Duct minimum
Terminal Element - 8"
Clock timer on furnace fan
Other than motorized damper requires letter
of certification for flow rates
Source Specific Fans
Environmental Air Exhaust ducting, insulation
(R-4) and terminus (located 3' from opening)
Ca1148 hours before you dig for utility line locates
1-800.424-5555
Page 2 of 4
Building Permit #BLD00-056R-1
RF,OTTTRF,D INSPECTIONS APPROVED/DATE
FRAl1-IING: --
Walls
Alternate Braced Wall Panels
Roof-Engineered truss plan to be on-site at
lime of inspection
Attic Venting -ridge & eave
Ceilings
Posts, beams & headers
Windows -escape
Windows- safety glazing (SGD)
Windows Ufactor - .40 max.
NFRC window sticker must be on
Windows, skylights & doors at inspection time
Skylights
Air Seal
Doors Ufactor -entry door exempt
Rafter/Truss Positive Connection
Weather Resistive Barrier
INSULATION
Floor (R-30 )
Wall(R-19)
Ceiling (R 38 )
Baffles
Vapor Barrier: paint
Crawl space - 6 mil black poly
DRY WALL NAILING
Walls
Ceiling
~
~~
r~'~"rc 8 ~ 23 ~~
~
l
Garage/I3ouse Occupancy Separation
Interior Braced Wall Panels
FINAL
Public Works Sign-Off
House Numbers - 5" high
Plumbing
Mechanical -Ventilation Certification for
Integrated System
Insulation Certificate
V. B. Paint Certif cafe
Smoke Detectors
Final -Building
Catl 48 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 4
Building Pami[ #BLDOOA56R<1
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's
registration number and a City business license. Failure to provide proof of this documentation prior to
work may result in job shut down while this,is accomplished
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected
prior to beginning construction; call 385-2294, press 3. Measures shall include installation of silt
fencing and graveled construction entrance (see attached details). Adjacent rights-af way shall he kept
free of dirt and debris. Soils exposed during construction shall be temporarily stabilized with mulching,
plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once
construction is complete. Applicant is responsible for protection of adjace~ properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re•iaspeetion is required after any corrections are completed.
•
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspeMed. For Public Works inspection call 385-2294, press 3; a
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduling the Building Department's final inspection.
7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy.
8. All building permits expire if no progress has been made within six months, or if no inspections are
done by the Building Department within one year. Call for at least one inspection per year to keep
your building permit active.
9. Revisions require review and approval prior to making changes in the field. Contact the Building
Department at 379-5086 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates •
1-800-424-5555
Page 4 of 4
Waterman & KatzSuilding
181 Quinry 8tree4 Suitc 301
Pon Toamae~ WA 98368
Phone: (360)379-3206 Fax: (360)3796923
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
TffiS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLD00-056 Issued: 3/28/00 Parcel Number: 948317803
Job Address: 1365 McClellan Street Zoning: R III Type: VV=N Occupancy: R-3/U-1
Nature of Work: Foundation Permit Onlv For Dwellin¢ & Gara¢e
Owner: Cascadia Merchantile/Neil Cavette Contractor: Cavette Construction
(360) 385-3247
GENERAL CONDITIONS APPLY -SEE LAST PAGE
NOTE: FOUNDATIONPERMIT ONLY-Resulting structure must be compatible with foundation
design and must comply with all applicable codes
RF.n7TTRF.TI TNCPF.C"TTnNS APPROVED/DATE
~J
TEMP EROSION & SEDIlVIENT CONTROL
See General Condition No. 2-inspection required
' prior to foundation work.
Graveled construction entrance to prevent dirt from
leaving the site
FOOTINGS , /
Setbacks - F=20', R=10', S=S', 5=10'(ROW) ~~~~~ v
Footings -bottom of footing: 12" below grade
Forms
Reinforcement
Interior footings
Porch/Deck Piers
UFER
FOUNDATION , //?
D
Stem Wall - 6" wide ~O
~l
Forms
Reinforcement
Anchor Bolts
Vents - 14 required
Crawl Access
Beam Pockets
AB WP Holdown Hardware
Ca1148 hours before you dig for utility line locates
1-800.424-5555
Page 1 of 2
PmnitNBLDOD-0.5b'
w
REOi7IRED INSPECTIONS APPROVED/DATE
SLAB
Garage -nonstructural; no inspection required ~
FINAL
Concrete work
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's
registration number and a City business license. Fa~7ure to provide proof of this documentation
prior to work may result in job shut down while this is accomplished
2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and
inspected prior to beginning construction; call 385-2294,. press 3. Measures shall include
installation of silt fencing and graveled construction entrance (see attached details). Adjacent
rights-of--way shalt be kept free of dirt debris. Soils ezposed during construction shall be
temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized
with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for
protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall
panels (ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294,
press 3. A minimum of twenty-four hours notice is repaired. Public W orks aourovat must 6e
received prior to scheduling the Building Department's final inspection.
Final Inspections are required prior to occupancy; a Certificate of Occupancy is required for a
non-residential project.
8. All building permits ezpire if no progress has been made within sia months, or if no inspections
are done by the Building Department within one year. Call for at least one inspection per year
to keep your building permit active.
9. Revisions require submittal and approval prior to making changes in the field. Obtain revisions
from the Building Department (379-3208) prior to making changes to the approved plans.
10. POST THIS PERMIT ON-STI'E WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
1-800-424-5555