CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION STTE
Ca11385-2294 for Inspection
Permit Number: BLDOO-O55R-1 Issued: 618100 Parcel Number: 988800802
Job Address: 508 Lincoln Street Zoning: R_II Type: V-N Occupancy: RR=3
Nature of Work: Revision #1: replace additional six porch beams. 4 z 4 posts and trim.
GENERAL CONDITIONS APPLY -SEE BELOW
Owner Gwen Head
RF.OTTTRFTI TNSPF,CTTCINS
Contractor: Townsend Builders
(301-1603)
APPROVED/DATE
•
FRAMING
5-1/8" x 9" glulam beam ~ i 3~gtj
4" x 4" pressure-treated post
Connector straps
FINAL
House Numbers -check for 5" numbers
throughout per 1997 UBC
Smoke Detectors
Final -Building
CALL 48 hours before you dig for utility line locates
I-800-424-5555
Page 1 of 2
Permit kBI.DOB-0SSR-1
Rs~NERAL CONDITIONIS
1. Contractors working on this project are required to have a Labor & Industries contractor's re¢istration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; call 385-2294, press 3. Measures shall include installation of silt fencing and
graveled construcfion entrance (sce attached details). Adjacent rights-of--way shall be kept frce of dirt
debris. Soils ezposed during construction shall be temporarily stabilized with mulching, plastid sheeting,
etc Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construMion is
complete. Applicant is responsible for protection of adjacent properties.
3. Ail elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversce correMion of any and all deficiencies noted by required
inspections.
S. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works ,
requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3. A
minimum of twenty-four hours notice is required. Public Works aooroval must be received prior to
scheduline the Buildine Department's final inspection.
7. Final Inspections are required prior to occupancy; a Certificate of Occupancy is required for anon-
residential project.
8. All building permits ezpire if no progress has been made within siz months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal & approval prior to making changes in the field. ContaM the Building
Department @ 379-3208 prior to making changes to the. approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
CALL 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 2 -
W.temw & K.~ BuOding
lgl Qulnry Street. Snae 30l
Phone; Cs~) 3~ssxue r.:: (3~) 3esasrs
i
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLDOO-O55 Issued: 3!27/00 Parcel Number: 988800802
Job Address: 508 Lincoln Street Zoning: RR=II Type: V_N Occupancy: RR=3
Nature of Work: Replace north beam. cost and trim.
Owner• Gwen Head
Contractor: Townsend Builders
(301-1603)
* NOTE: permit per scope of work only; additional work requires submittal of revision or separate permit*
GENERAL CONDITIONS APPLY -SEE BELOW
RF.niTTRF.D iNSPF,CTiONS
APPROVED/DATE
FRAD'IING - - - - - ~ J/ 3 /
5-I/8" x 9" glulam beam /
4" x 4" pressure-treated post
Connector straps
FINAL _
~
~
House Numbers -check for 5" numbers ~. f ~~ % ~
~~~
throughout per 1997 UBC ' f
Smoke Detectors
Final -Building
ENERAL CONDITION
1. Contractors working on this project are required to have a Labor & Industries contractor's registration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed an-site and inspected prior
to beginning construction; call 385-2294, press 3. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt
debris. Soils ezposed during construction shall be temporarily stabilized with mulching, plastic sheeting,
etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is
complete. Applicant is responsible for protection of adjacent properties.
CALL 48 hours before you dig for utility line locates
I-800-424-5555
Page 1 of 2
PermkJBIDOB-055
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
(See back for more conditions)
4. Owner or owner's agent shall review and oversee correMion of sny and ail deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass fmal inspection on your project until Public Works
requirements have been completed and inspected For Public Works inspection ca11385-2294, press 3. A
minimum of twenty-four hours notice is required Public Works aopraval must be received prior to
scheduline the Buildi~pe Department's final inspection.
7. Final Inspections are required prior to occupancy; a Certificate of Occupancy is required fora non-
residential project.
8. All building permits ezpire if po progress has been made within siz months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal & approval prior to making changes in the field. Contact the Building
Department @ 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
CALL 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 2