HomeMy WebLinkAboutBLD00-054Building and Community Developmrnt
Waterman & Katz Building
181 Quincy Street Suite.301
Port Townsend, WA 98368
Phone: (360) 379-3208 Fax: (360) 385-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
TffiS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLDOO-O54 Issued: 3128/00 Parcel Number: 955900064
Owner/Contractor: Hamilton Heiehts LLC Installer: Kozeliskv's Home Services WAINS0626
Job Address: Lot 64 2624 Hiehland Loop Zoning: PUD Type: VV=N Occupancy: R-3/U-1
Total Occupant Load: 512 Nature of Work: Set Manufactured Home w/ attached site-built ¢araQe and
porch
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
***Hours of Construction are limited to 7:30 rim. to 6:00 p.m. Monday through
Friday and prohibited on weekends and national holidays***
RF.ni1TRF.n TNRPF,C'_TTIIN~
APPROVED/DATE
TEMP EROSION & SEDIlIYIENT CONTROL
See details attached toMIP and general condition #2
Silt Fence
Drive Off Mat
si,AS/CONCRETE ~a~z~ ~~~ ~~3flo~ ~'
Setbacks
Forms
Monolithic Slab/Foundation (garage)
$//~OD
Reinforcement
Anchor Bolts
Porch Piers
Alternate Braced Wall Panel Holdown Hazdwaze
LIFER
Ca1148 hours before you dig for utility line locates
I-800-424-5555
Page 1 of 4
Permit # BLD00-034
RE UIRED INSPECTIONS
APPROVED/DATE
FLOOR FRAMING (prior to skirting)
Anchors
Steel Support Piers -Load-stamped and installed per
manufacturer's installation manual,• clearance of l8 "min. from
C{/Z (®l(,()
lowest point of I-beam and the ground or footing for min of 75% I
of area under home w/ Il "min. elsewhere unless installation
mamral specifies; otherwise area around home graded to provide
runoff away from home
PLUMBING:
Water Supply-Main shut-off valve (port or ball valve)
i
t
ll
t
d i
l
i
i //Z ~/DU
(
ns
a
e
n wa
er supp
y p
p
ng prior to connection to home, min f
'/. "diameter, same as supply pipe
Pressure Reduction Valve if> 80 psi
Hose Bibs (backflow protection required)
Pipe Insulation -Outside & in crawl space
Pressure Test - ]00 psi. for IS minutes
Pressure relief valve drain - to exterior of skirting, exhaust
downward between 6"and 24"aboveground
Drainage Piping -sloped min. %. "perfoot
MECHANICAL
Ducts & Duct Insulation
L~2 ~r00
Dryer Exhaust -vented to outside. Extension into crawl space ~~ 11 //
requires veining through skirting with no dips; follow dryer
manufacturer's insiructio»s; total combined length of ducting not
to exceed 14' w/ 2-90° elbows
FRAMING:
Engineered roof truss plan to be on-site at time of inspection
Walls ,7~Z ~~~ n n
1~~
Alternate Braced Wall Panels
Header
Roof
Garage/House Attachment
DRY WALL NAILING
Grarage/House Occupancy Separation w/20 minute self-closing
door
Ca1148 hours before you dig for utility line locates
1-800.424-5555
Page 2 of 4
Permit # BI,D00-054
FINAL
Public Works Sign-Off
Electrical (L & I) Sign-Off
House Number - 5" numbers
%~~ % ~C~JO ~~
Plumbing
Mechanical
Porch
Steps
Guard rails
Pressure-Treated joists
Posts, Beams, Headers
Positive Connections
Roof
Final -Building
No holes or gaps greater than'/."allowed
in skirting. Skirting to be rated for contact with
earth if backf~ll is involved
Crawl space ventilation per installation
mamral @ 1/ISO (l7 req'd); located close to
corners, on at least rivo opposing sides for cross
ventilation.
Crawl space access must provide access to
all areas under home; minimum 18 " x 24"
unless specified otherwise; covered with vinyl,
pressure-treated wood or metal.
ll/ ~~F~
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's
-registration number and a City business license. Failure to provide proof of this documentation prior to
work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected
prior to beginning construction; ca11385-2294, press 3. Measures shall include installation of silt
fencing and graveled construction entrance (see attached details). Soils ezpased during construction
shall be temporarily stabilized with mulching, plastic sheeting, eta Soils shall be permanently stabilized
with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for
protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
• 5. Re-inspection is required after any corrections are completed.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 4
Permit # BLD00-054
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294, press ~~
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduling the Building DepsrtmenYs final inspection.
7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy.
8. All building permits ezpire if no progress has been made within siz months, or if no inspections are
done by the Building Department within one year. Csll for at least one inspection per year to keep your
building permit active.
9. Revisions require review and approval prior to making changes in-the field. Contact the Building
Department 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ONSITE WITH THE APPROVED PLANS.
F- 1
L J
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 4 of 4