Loading...
HomeMy WebLinkAboutBLD00-054Building and Community Developmrnt Waterman & Katz Building 181 Quincy Street Suite.301 Port Townsend, WA 98368 Phone: (360) 379-3208 Fax: (360) 385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD TffiS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLDOO-O54 Issued: 3128/00 Parcel Number: 955900064 Owner/Contractor: Hamilton Heiehts LLC Installer: Kozeliskv's Home Services WAINS0626 Job Address: Lot 64 2624 Hiehland Loop Zoning: PUD Type: VV=N Occupancy: R-3/U-1 Total Occupant Load: 512 Nature of Work: Set Manufactured Home w/ attached site-built ¢araQe and porch GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 ***Hours of Construction are limited to 7:30 rim. to 6:00 p.m. Monday through Friday and prohibited on weekends and national holidays*** RF.ni1TRF.n TNRPF,C'_TTIIN~ APPROVED/DATE TEMP EROSION & SEDIlIYIENT CONTROL See details attached toMIP and general condition #2 Silt Fence Drive Off Mat si,AS/CONCRETE ~a~z~ ~~~ ~~3flo~ ~' Setbacks Forms Monolithic Slab/Foundation (garage) $//~OD Reinforcement Anchor Bolts Porch Piers Alternate Braced Wall Panel Holdown Hazdwaze LIFER Ca1148 hours before you dig for utility line locates I-800-424-5555 Page 1 of 4 Permit # BLD00-034 RE UIRED INSPECTIONS APPROVED/DATE FLOOR FRAMING (prior to skirting) Anchors Steel Support Piers -Load-stamped and installed per manufacturer's installation manual,• clearance of l8 "min. from C{/Z (®l(,() lowest point of I-beam and the ground or footing for min of 75% I of area under home w/ Il "min. elsewhere unless installation mamral specifies; otherwise area around home graded to provide runoff away from home PLUMBING: Water Supply-Main shut-off valve (port or ball valve) i t ll t d i l i i //Z ~/DU ( ns a e n wa er supp y p p ng prior to connection to home, min f '/. "diameter, same as supply pipe Pressure Reduction Valve if> 80 psi Hose Bibs (backflow protection required) Pipe Insulation -Outside & in crawl space Pressure Test - ]00 psi. for IS minutes Pressure relief valve drain - to exterior of skirting, exhaust downward between 6"and 24"aboveground Drainage Piping -sloped min. %. "perfoot MECHANICAL Ducts & Duct Insulation L~2 ~r00 Dryer Exhaust -vented to outside. Extension into crawl space ~~ 11 // requires veining through skirting with no dips; follow dryer manufacturer's insiructio»s; total combined length of ducting not to exceed 14' w/ 2-90° elbows FRAMING: Engineered roof truss plan to be on-site at time of inspection Walls ,7~Z ~~~ n n 1~~ Alternate Braced Wall Panels Header Roof Garage/House Attachment DRY WALL NAILING Grarage/House Occupancy Separation w/20 minute self-closing door Ca1148 hours before you dig for utility line locates 1-800.424-5555 Page 2 of 4 Permit # BI,D00-054 FINAL Public Works Sign-Off Electrical (L & I) Sign-Off House Number - 5" numbers %~~ % ~C~JO ~~ Plumbing Mechanical Porch Steps Guard rails Pressure-Treated joists Posts, Beams, Headers Positive Connections Roof Final -Building No holes or gaps greater than'/."allowed in skirting. Skirting to be rated for contact with earth if backf~ll is involved Crawl space ventilation per installation mamral @ 1/ISO (l7 req'd); located close to corners, on at least rivo opposing sides for cross ventilation. Crawl space access must provide access to all areas under home; minimum 18 " x 24" unless specified otherwise; covered with vinyl, pressure-treated wood or metal. ll/ ~~F~ GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's -registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Soils ezpased during construction shall be temporarily stabilized with mulching, plastic sheeting, eta Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. • 5. Re-inspection is required after any corrections are completed. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 4 Permit # BLD00-054 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294, press ~~ minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building DepsrtmenYs final inspection. 7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy. 8. All building permits ezpire if no progress has been made within siz months, or if no inspections are done by the Building Department within one year. Csll for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in-the field. Contact the Building Department 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ONSITE WITH THE APPROVED PLANS. F- 1 L J Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 4 of 4