Permit Number: BLDOO-OSOR-1 Issued: 8/11100 Parcel Number: 965702809
Job Address: 708 Benton Street Zoning: RR=II Type: VV=N Occupancy: RR=3
Total Occupant Load: NC Nature of Work: Change roof framing from engineered trusses to
rafters/ceiling IoistS - refer to engineering
Owner: Leah Hammer Contractor: Owner
301-2822
GENERAL CONDITIONS APPLY: See last sage
SEPARATE PERMITS REQUIRED:
Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702
Mechanical Permit-Required for Propane Heaters, Piping & Tank Placement
REQUIRED INSPECTIONS
APPROVED/DATE
FRAMING ~~
~i"~'
~
Roof- see engineering /
~
Engineered Headers and Beams
Rafter positive connection
FINAL
See original permit
Final -building
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's
registration number and a City business license. Failure to provide proof of this documentation
prior to work may result in jab shut down while this is accomplished.
CALL 48 hours before you dig for Utility line locates
1-800-424-5555
Page 1 of 2
Building Permit #00-OSOR-1
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected
prior to beginning construction; ca1138S-2294, press 3. Measures shall include installation of silt
. fencing and graveled construction entrance (see attached details). Adjacent rights-of-way shall be
kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with
mulching; plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings,
sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent
properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall
panels (ABWP) require inspection prior to covet
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294,
press 3. A minimum of twenty-four hours notice is required. Public Works approval must be
received prior to scheduling the Building Department's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a
non-residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections
are done by the Building Department within one year. Call for at least one inspection per year to
keep your building permit active.
9. Revisions require review and approval prior to making changes in the field. Contact the Building
Department at 379-5086 prior to making changes to the approved plans.
10. POST-THIS PERMIT ONSITE WITH THE APPROVED PLANS.
~.
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 2
. r
Waterman & Kris Building
I61 Qulnry Strnq Sui4301
Port Townaend~ WA 98366
PAone: 360-379J208 Fas 360J85-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLDOO-OSO Issued: 417100 Parcel Number: 965702809
Job Address: 708 Benton Street Zoning: R_II Type: VV=N Occupancy: R_3
Total Occupant Load: NC Nature of Work: Residential addition/Remodel
Owner: Leah Hammer Contractor: Owner
301-2822
GENERAL CONDITIONS APPLY: See last aage
SEPARATE PERMITS REQUIRED:
Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702
Mechanical Permit Required for Propane Heaters, Piping & Tank Placement
RE UIRED INSPECTIONS
APPROVED/DATE
TEMP EROSION & SEDIMENT CONTROL
See General Condition #2
FOOTINGS
Setbacks
7~j~(' i~ ~ ,/J
~ ,~/
Footings c
Forms
Reinforcement
Interior Footings
Porch/Deck Piers
FOUNDATION ,rte '
Stem Wall - 8" ~1 ~,~(JV
Forms
Reinforcement
Anchor
FLOOR FRANIlNG
joists ~/Z(/~ ~rl n
(i~
Blocking
Positive Connection
Treated Wood to Concrete
Anchor Bolts
CALL 48 hours before you dig for Utility line locates
1-800-424-5555
Page 1 of 4
Building Permit #00-030 ''
RE UIRED INSPECTIONS APPROVED/DATE
PLUMBING
Rough-In (D-V-T & Clean outs)
"1~`R/(~~
Water supply t
Hose Bibbs - backflow protection required
Pressure Reduction Valve if > 80 psi
Water Heater
Seismic Restraint - 2 places
Pressure Relief Valve drain to exterior, terminate
6" -24" above ground
MECHANICAL ~/~
Whole house ventilation / O~y
`
Source Specific Exhaust Fans @ bathrooms (SOcfm),
kitchen (100 cfm) and utility room (50 cfm)
FRAMING
Roof -engineered truss plan to be on-site at time of ,~/
t O, ~~/
Inspection
Rafter/truss positive connection
Attic venting -ridge and eave
Posts, beams and headers
Windows -safety glazing
NFRC sticker must be on windows, doors and
skylights at time of inspection
Air Seal.
Fireblocking
Weather Resistive Barrier
INSULATION
Floor (R-19 required)
(bl ~-~ (~
Walls (R-25)
Ceiling (R-30)
Baflles
Vapor Barrier Paint
Ca1148 hours before you dig for utility line locates
1-800.424-5555
Page 2 of 4
Building Pmnit tt00-0SO
RF(1TTTRFTI TNCPF.f'TTf)NC
APPROVED/DATE
DRYWALL NAILING _ 7
Walls ~~'~(7 (
Ceiling
FINAL
House Numbers - 5" numbers
Plumbing
Insulation Certificate
Vapor Barrier Paint Certificate
Smoke Detectors ~
ildin
l
b
Fi ,
~ ~ ~
/
g
-
u
na j
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's
registration number and a City business license. Failure to provide proof of this documentation
prior to work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected
prior to beginning construction; ca11385-2294, press 3. Measures shall include installation of silt
fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be
kept free of dirt debris. Soils ezposed during construction shall be temporarily stabilized with
mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings,
sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent
properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced .wall
panels (ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294,
press 3. A minimum of twenty four hours notice is required Public Works approval must be
Cail 48 hours before you dig for utility tine locates
1-800-424-5555
Page 3 of 4
Building Permit #00-050
K
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a
non-residential project.
8. All building permits expire if no progress has been made within siz months, or if no inspections
are done by the Building Department within one year. Call for at least one inspection per year to
keep your building permit active.
9. Revisions require review and approval rior to making changes in the field. Contact the Building
Department at 379-5086 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
~.
Call 48 hours before you dig for utility line locates