Loading...
HomeMy WebLinkAboutBLD00-050W etermen & Kata BuIWIng let Quincy Slnx4 Suite 301 Port ToMnaend. WA 98368 Phony. 360379-3208 Fa:360-365-7675 CITY OF PORT TOWNSEND - CONSTRUCTION PERNIIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLDOO-OSOR-1 Issued: 8/11100 Parcel Number: 965702809 Job Address: 708 Benton Street Zoning: RR=II Type: VV=N Occupancy: RR=3 Total Occupant Load: NC Nature of Work: Change roof framing from engineered trusses to rafters/ceiling IoistS - refer to engineering Owner: Leah Hammer Contractor: Owner 301-2822 GENERAL CONDITIONS APPLY: See last sage SEPARATE PERMITS REQUIRED: Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702 Mechanical Permit-Required for Propane Heaters, Piping & Tank Placement REQUIRED INSPECTIONS APPROVED/DATE FRAMING ~~ ~i"~' ~ Roof- see engineering / ~ Engineered Headers and Beams Rafter positive connection FINAL See original permit Final -building GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in jab shut down while this is accomplished. CALL 48 hours before you dig for Utility line locates 1-800-424-5555 Page 1 of 2 Building Permit #00-OSOR-1 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca1138S-2294, press 3. Measures shall include installation of silt . fencing and graveled construction entrance (see attached details). Adjacent rights-of-way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching; plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to covet 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a non-residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 379-5086 prior to making changes to the approved plans. 10. POST-THIS PERMIT ONSITE WITH THE APPROVED PLANS. ~. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2 . r Waterman & Kris Building I61 Qulnry Strnq Sui4301 Port Townaend~ WA 98366 PAone: 360-379J208 Fas 360J85-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLDOO-OSO Issued: 417100 Parcel Number: 965702809 Job Address: 708 Benton Street Zoning: R_II Type: VV=N Occupancy: R_3 Total Occupant Load: NC Nature of Work: Residential addition/Remodel Owner: Leah Hammer Contractor: Owner 301-2822 GENERAL CONDITIONS APPLY: See last aage SEPARATE PERMITS REQUIRED: Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702 Mechanical Permit Required for Propane Heaters, Piping & Tank Placement RE UIRED INSPECTIONS APPROVED/DATE TEMP EROSION & SEDIMENT CONTROL See General Condition #2 FOOTINGS Setbacks 7~j~(' i~ ~ ,/J ~ ,~/ Footings c Forms Reinforcement Interior Footings Porch/Deck Piers FOUNDATION ,rte ' Stem Wall - 8" ~1 ~,~(JV Forms Reinforcement Anchor FLOOR FRANIlNG joists ~/Z(/~ ~rl n (i~ Blocking Positive Connection Treated Wood to Concrete Anchor Bolts CALL 48 hours before you dig for Utility line locates 1-800-424-5555 Page 1 of 4 Building Permit #00-030 '' RE UIRED INSPECTIONS APPROVED/DATE PLUMBING Rough-In (D-V-T & Clean outs) "1~`R/(~~ Water supply t Hose Bibbs - backflow protection required Pressure Reduction Valve if > 80 psi Water Heater Seismic Restraint - 2 places Pressure Relief Valve drain to exterior, terminate 6" -24" above ground MECHANICAL ~/~ Whole house ventilation / O~y ` Source Specific Exhaust Fans @ bathrooms (SOcfm), kitchen (100 cfm) and utility room (50 cfm) FRAMING Roof -engineered truss plan to be on-site at time of ,~/ t O, ~~/ Inspection Rafter/truss positive connection Attic venting -ridge and eave Posts, beams and headers Windows -safety glazing NFRC sticker must be on windows, doors and skylights at time of inspection Air Seal. Fireblocking Weather Resistive Barrier INSULATION Floor (R-19 required) (bl ~-~ (~ Walls (R-25) Ceiling (R-30) Baflles Vapor Barrier Paint Ca1148 hours before you dig for utility line locates 1-800.424-5555 Page 2 of 4 Building Pmnit tt00-0SO RF(1TTTRFTI TNCPF.f'TTf)NC APPROVED/DATE DRYWALL NAILING _ 7 Walls ~~'~(7 ( Ceiling FINAL House Numbers - 5" numbers Plumbing Insulation Certificate Vapor Barrier Paint Certificate Smoke Detectors ~ ildin l b Fi , ~ ~ ~ / g - u na j GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils ezposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced .wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294, press 3. A minimum of twenty four hours notice is required Public Works approval must be Cail 48 hours before you dig for utility tine locates 1-800-424-5555 Page 3 of 4 Building Permit #00-050 K 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a non-residential project. 8. All building permits expire if no progress has been made within siz months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval rior to making changes in the field. Contact the Building Department at 379-5086 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. ~. Call 48 hours before you dig for utility line locates 1-800-424-5555 .Page 4 of 4