Loading...
HomeMy WebLinkAboutBLD00-048Waterman & Ksiz Building 181 Quinry Street, Sulfe 301 Port Towruend. WA 98368 Phorw: 360J79-5086 Fa:3603&5-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE. Ca11385-2294 for Inspection Permit Number: $LDOO-O48 Issued: 3129100 Parcel Number: 936904405 Job Address: 70158` Street St. Zoning: RR=II Type: VV=N Occupancy: R-3/U-1 Total Occupant Load: 813 Nature of Wark: Construct Single-family Dwelling with garage Owner: William fDuffyl Nightengale Contractor: Terhune Homes. Inc. 360-697-7000 GENERAL CONDITIONS APPLY: See last pace SEPARATE PERMTTS REOUIItED: Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702 RE UIItED INSPECTIONS APPROVED/DATE TEMP EROSION & SEDIMENT CONTROL See General Condition #2 & attached details Silt Fence required along northwest sides of q , Gv ~~ r ~ Property J I ~^,,~,,Jt/ Graveled construction entrance to prevent dirt and r i I ~s^' I ~~ti) ~ sediment from leaving the site ,~?~ ~ GROUNDWORK PLUMBING Pressure test /~~ Pipe joints exposed xi V " ! // ~ d a e Pipe bedding b /' FOOTINGS Setbacks Footings Forms ~r~ 6j~~ ~ ~ 1~ ~~ ~ Reinforcement J'' I ~y J` ~ ~~4~9 Interior Footings Porch/Deck Piers IJFER CALL 48 hours before you dig for Utility line locates 1-800-424-5555 Page 1 of S a~aa~g ~ noo-oaa RE UIltED INSPECTIONS APPROVED/DATE FOUNDATION Stem Wall - 8" Forms Reinforcement / s/ ~ ~~DU Anchor Bolts -see engineered shear wall schedule 11 in engineering calculations for anchor bolt spacing in Pl-6/PI-4/PI-2 shear walls Engineered Holdowns - STHD10 SLAB R-10 rigid insulation at perimeter walls of d ~ ~ 6 `~ ~~-~ conditioned envelope Interior footings Reinforcement ~a~~ Lai ~~no~~ Post bases ci ~ ~~ FLOOR FRAI~IING NOTE: Engineered LPI floor plan on-site and available to the Inspector at inspection time Joists Blocking Positive Connection Treated Wood to Concrete Anchor Bolts -per shear wall schedule PLUMBING Rough-In (D-V-T & Clean outs) Water supply (~ /~ _ Gas_ Supply ( l Hose Bibbs - backflow protection required Pipe Insulation (R-3) Pressure Reduction Vatve if> 80 psi Water Heater R-10 under if electric Seismic Restraint - 2 places Pressure Relief Valve drain to exterior, terminate 6" -24" above ground L_J Ca1148 hours before you dig for utility line locates I-800-424-5555 Page 2 of 5 Building Pmnit #00-048 • AFl1TTTi2FTl TNCPF.(''TT(1NC APPROVED/DATE MECHANICAL Heat Pump - HSPF =/> 6.8; COP =h 3.0 Ducts & duct insulation (supply and return air ducts R-8; supply ducts in conditioned space R-4) Whole house ventilation Integrated system 7" minimum smooth duct (8" min. flex) Automatic (electric) damper -certification from installer required at final Source Specific Exhaust Fans @ bathrooms (SOcfin), kitchen (100 cfm) and utility room (50 cfm) Environmental air exhaust ducting, insulation (R-4) and terminus (3' from openings into building) o~/r/ fJ n~ ~~~ `y~/ '~ ('~ r FRAMING NOTE: EngineeredLYL plan to be on-site and available to Inspector at time of inspection Walls Engineered shear walls 51-~~'I~fXGlu-c,3 ,.~,/~~fy~j `t Engineered framing around openings/angle ties FloorJceilings Roof -engineered truss plan to be on-site at time of Inspection ~ g f~~~ ~~ ~ ~`~ i ~ ~ ~ (y~. (~ on Rafter/truss positive connect O Attic venting -ridge and eave Posts, beams and headers Windows -escape Windows -safety glazing Window U-factor - .65 or better Skylight U-factor - .68 or better NFRC sticker must be on windows, doors and skylights at time of inspection Air Seal Firebloeking Weather Resistive Barrier INSIILATION Slab (R-10) ~ ~ ~~~7 ~iG7 Floor (R-19 required) Walls (including garage & mechanical room house common wall) Ceiling (R-30) Baffles Vapor Barrier -faced batts & vapor barrier paint Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 5 .- Building Permit #00-048 RE UIRED INSPECTIONS APPROVED/DATE DRYWALL NAILING r/ walls (~~! 15 ~ ~ Ceiling ~ Interior Braced Wall Panels -see engineered shear wall schedule Garage/House Occupancy Separation Enclosed Usable Space Under Stairs FINAL Public Works Sign-off / ~Z/~ LPG -Fire Department Sign-off House Numbers - 5" numbers Plumbing Mechanical Fresh air certification from installer Insulation Certificate Vapor Barrier Paint Certificate Smoke Detectors Final -building &ENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in jab shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc once construction is complete.. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 4 of 5 Building Permit tl00-048 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3. A minimum of twenty-four hours notice is required. Public Works auuroval must be received prior to scheduling the Buildin>z Department's final inspection. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a non-residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at (east one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 379-5086 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. L~ Ca1148 hours .before you dig for utility line locates 1-800-424-5555 Page 5 of 5 a