HomeMy WebLinkAboutBLD00-048Waterman & Ksiz Building
181 Quinry Street, Sulfe 301
Port Towruend. WA 98368
Phorw: 360J79-5086 Fa:3603&5-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE.
Ca11385-2294 for Inspection
Permit Number: $LDOO-O48 Issued: 3129100 Parcel Number: 936904405
Job Address: 70158` Street St. Zoning: RR=II Type: VV=N Occupancy: R-3/U-1
Total Occupant Load: 813 Nature of Wark: Construct Single-family Dwelling with garage
Owner: William fDuffyl Nightengale
Contractor: Terhune Homes. Inc.
360-697-7000
GENERAL CONDITIONS APPLY: See last pace
SEPARATE PERMTTS REOUIItED:
Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702
RE UIItED INSPECTIONS
APPROVED/DATE
TEMP EROSION & SEDIMENT CONTROL
See General Condition #2 & attached details
Silt Fence required along northwest sides of q , Gv
~~ r
~
Property J
I
~^,,~,,Jt/
Graveled construction entrance to prevent dirt and r
i I ~s^' I ~~ti)
~
sediment from leaving the site ,~?~
~
GROUNDWORK PLUMBING
Pressure test /~~
Pipe joints exposed xi V " ! //
~ d a e
Pipe bedding b /'
FOOTINGS
Setbacks
Footings
Forms
~r~
6j~~ ~ ~ 1~ ~~
~
Reinforcement J''
I ~y
J`
~ ~~4~9
Interior Footings
Porch/Deck Piers
IJFER
CALL 48 hours before you dig for Utility line locates
1-800-424-5555
Page 1 of S
a~aa~g ~ noo-oaa
RE UIltED INSPECTIONS APPROVED/DATE
FOUNDATION
Stem Wall - 8"
Forms
Reinforcement /
s/ ~ ~~DU
Anchor Bolts -see engineered shear wall schedule 11
in engineering calculations for anchor bolt
spacing in Pl-6/PI-4/PI-2 shear walls
Engineered Holdowns - STHD10
SLAB
R-10 rigid insulation at perimeter walls of d ~ ~ 6 `~ ~~-~
conditioned envelope
Interior footings
Reinforcement ~a~~ Lai ~~no~~
Post bases ci ~ ~~
FLOOR FRAI~IING
NOTE: Engineered LPI floor plan on-site and
available to the Inspector at inspection time
Joists
Blocking
Positive Connection
Treated Wood to Concrete
Anchor Bolts -per shear wall schedule
PLUMBING
Rough-In (D-V-T & Clean outs)
Water supply (~ /~
_
Gas_ Supply ( l
Hose Bibbs - backflow protection required
Pipe Insulation (R-3)
Pressure Reduction Vatve if> 80 psi
Water Heater
R-10 under if electric
Seismic Restraint - 2 places
Pressure Relief Valve drain to exterior, terminate
6" -24" above ground
L_J
Ca1148 hours before you dig for utility line locates
I-800-424-5555
Page 2 of 5
Building Pmnit #00-048
•
AFl1TTTi2FTl TNCPF.(''TT(1NC APPROVED/DATE
MECHANICAL
Heat Pump - HSPF =/> 6.8; COP =h 3.0
Ducts & duct insulation (supply and return air ducts
R-8; supply ducts in conditioned space R-4)
Whole house ventilation
Integrated system
7" minimum smooth duct (8" min. flex)
Automatic (electric) damper -certification from
installer required at final
Source Specific Exhaust Fans @ bathrooms (SOcfin),
kitchen (100 cfm) and utility room (50 cfm)
Environmental air exhaust ducting, insulation (R-4)
and terminus (3' from openings into building)
o~/r/ fJ n~
~~~ `y~/ '~ ('~ r
FRAMING
NOTE: EngineeredLYL plan to be on-site and
available to Inspector at time of inspection
Walls
Engineered shear walls
51-~~'I~fXGlu-c,3 ,.~,/~~fy~j `t
Engineered framing around openings/angle ties
FloorJceilings
Roof -engineered truss plan to be on-site at time of
Inspection ~
g
f~~~ ~~
~
~`~
i
~
~
~
(y~.
(~
on
Rafter/truss positive connect O
Attic venting -ridge and eave
Posts, beams and headers
Windows -escape
Windows -safety glazing
Window U-factor - .65 or better
Skylight U-factor - .68 or better
NFRC sticker must be on windows, doors and
skylights at time of inspection
Air Seal
Firebloeking
Weather Resistive Barrier
INSIILATION
Slab (R-10) ~ ~
~~~7 ~iG7
Floor (R-19 required)
Walls (including garage & mechanical room house
common wall)
Ceiling (R-30)
Baffles
Vapor Barrier -faced batts & vapor barrier paint
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 5
.-
Building Permit #00-048
RE UIRED INSPECTIONS APPROVED/DATE
DRYWALL NAILING r/
walls (~~! 15 ~ ~
Ceiling ~
Interior Braced Wall Panels -see engineered
shear wall schedule
Garage/House Occupancy Separation
Enclosed Usable Space Under Stairs
FINAL
Public Works Sign-off
/ ~Z/~
LPG -Fire Department Sign-off
House Numbers - 5" numbers
Plumbing
Mechanical
Fresh air certification from installer
Insulation Certificate
Vapor Barrier Paint Certificate
Smoke Detectors
Final -building
&ENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's
registration number and a City business license. Failure to provide proof of this documentation
prior to work may result in jab shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected
prior to beginning construction; call 385-2294, press 3. Measures shall include installation of silt
fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be
kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with
mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings,
sodding, etc once construction is complete.. Applicant is responsible for protection of adjacent
properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall
panels (ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 4 of 5
Building Permit tl00-048
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294,
press 3. A minimum of twenty-four hours notice is required. Public Works auuroval must be
received prior to scheduling the Buildin>z Department's final inspection.
Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a
non-residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections
are done by the Building Department within one year. Call for at (east one inspection per year to
keep your building permit active.
9. Revisions require review and approval prior to making changes in the field. Contact the Building
Department at 379-5086 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
L~
Ca1148 hours .before you dig for utility line locates
1-800-424-5555
Page 5 of 5
a