HomeMy WebLinkAboutBLD00-046Wafamm & Katz Building 181 Quincy Strew Suite 301 Port Townsend, WA 98368 PMne: (360) 379-3208 Fu: (360) 385-7675 CITY OF PORT TOWNSEND r CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number:. BLDOO-O46 Issued: 3/22/00 Parcel Number: 988801202 Job Address: 707 Tavlor Street Zoning: R-2 Type: V-N Occupancy: R-3 Nature of Work: Construct New Foundation For Sinele-family Dwelling Occupant Load: N/C Owner: Greg Walsh Contractor: Kimball Woodworks 385-4915 GENERAL CONDITIONS APPLY -SEE LAST PAGE NOTE: FOUNDATIONPERMIT ONLY RT+'nTTTRF.T) TN~PR(".TTON~ APPROVED/DATE TEMP EROSION & SDM'T CONTROL See General Condition No. 2 -install on-site as needed during construction to prevent sediment from leaving the site and to eliminate tracking of soil onto the street. FOOTINGS Setbacks -existing; no change Footings - 7" x 15" with bottom of footing 18" below grade Interior footings w/post bases Forms Reinforcement FOUNDATION ll S W ! `~ ~ S`~~~~ tem a Forms Reinforcement " " " J ~ tT6 $~ND~• ~~~~/~~ ( ' x 3/16 square washers Anchor Bolts w/ 2 x 2 Vents-l8 typical foundation vents Crawl space access 6 mil black poly Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 Pemit#HLD00-046 FINAL House Number -check for 5" numbers Smoke Detectors required throughout existing house per 1997 UBC: one in each sleeping room and in each area/hallway leading to each sleeping room with a minimum of one detector on each floor Building -Concrete work GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's re¢istration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (7'ESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils ezposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection an your projeM until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to schedulint the Buildin¢ Department's final inspection. 7. Final Inspections are required prior to oceupancy; a Certificate of Occupancy is required fors non- residential projeck 8. All building permits ezpire if no progress has bcen made within siz months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval prior to making changes in the field. Obtain revisions from the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2 ,~ 4