HomeMy WebLinkAboutBLD00-045Wafernu & Koh Buading 181 Qufnry Street, Suae 301 Phone; (360) 379J208 Fa: (S60) 785-7675 CITY OF PORT TOWIVSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLDOO-O4S Issued: 3/21/00 Parcel Number: 965701904 Sob Address: 936 Benton Street Zoning: RR=II Type: V-N Occupancy: RR=3 Nature of Work: Demolish chimney Install new LPG fireplace & furnace. Install new windows remove existing doors. Repair water damage. Owner: Ken & Marvlu Brown Contractor: Owner (360) 379-3350 (Linda) GENERAL CONDITIONS APPLY - 5EE LAST PAGE SEPARATE PERMTTS REOUIItED: Electrical -Contact Labor & Industries @ 360-417-2702 Mechanical- Propane Tank and Gas Piping RE UIRED INSPECTIONS APPROVED/DATE PLUMBING ,, n q Z S/~v Water Supply / ~X- Hose Bibs (backflow protection required) Pipe Insulation (R-3) Pressure Reduction Valve if> 80 psi Gas Piping MECHANICAL Environmental air exhaust Furnace (per manufactures installation instructions) Combustion air (from outside in unusually tight construction) Ducts. INSULATION /.~Z~~~ Fill exposed cavities 77 Insulate exposed heat ducts to R-8 in unconditioned spaces. DRY WALL NAILING Walls Ceiling CALL 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 r~~xainoo.as RE UIRED INSPECTION APPROVED DATE FINAL House Numbers Plumbing Mechanical/Heating Smoke Detectors Final -Building ENERAL CONDTTION 1. Contractors working an this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shutdown while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294, press' 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils. exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible-for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required afrer inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294, press 3. A 7. Final Inspections are required prior to occupancy; a Certificate of Occupancy is required fora non- residential project 8. All building permits ezpire if no progress has been made within siz months, or if no inspections are done by the Building Department within one year. Call far at least one inspection per year to keep your building permit active. 9. Revisions require submittal & approval prior to making changes in the field. Contact the Building Department (ate 379-3208 prior to making changes to the approved plans. L0. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. CALL 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2