CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLDOO-O42 R-1 Issued: 9105101 Parcel Number: 948000802
Job Address: 1550 Umatilla Avenue Zoning: RR=II Type: VV=N Occupancy:R-3 deck
Nature of Work: Construct deck• replace gara¢e door replace (2) doors• replace (1) window• replace siding
Owner: Bert Bereman
Contractor: Same as Owner
GENERAL CONDITIONS APPLY -SEE LAST PAGE
RF.(1TITRFT) TNSPF,CTTnNS
APPROVED/DATE
FRAMING
Window and Door U-factor
.36 or better
NFRC sticker must be on windows and
doors at time of inspection
Window Safety Glazing
Air Seal
Weather Resistive Barrier under siding
FINAL
Deck
Guardrails
Check for 5" numbers
Smoke detectors required throughout per the
UBC: one in each sleeping room and in
each area/hallway leading to sleeping
rooms with a minimum of one on each floor
Final -Building
GENERAL CONDITIONS
I. Contractors working on this project are required to have a Labor & Industries contractor's reeistration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
Prnnit#BI.DW-M2R-1
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; ca1138S2294, press 3. Measures shall include installation of silt fencing and
graveled construction entrance. Adjacent rights-of--way shall be kept free of dirt & debris. Soils exposed
during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be
permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is
responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294, press 3. A
minimum of twenty-four hours notice is required. Public Works approval must be received urior to
scheduline the BuildinE Department's final inspection.
7. Final Inspections are required prior to occupancy. A Certificate of Occupancy is required fora non-
residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call Tor at least one inspection per year to keep your
building permit active. ~
9. Revisions require review and approval prior to making changes in the field. Contact the Building
Department at 379-3208 rp for to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
I-800-424-5555
Page 2 of 2
A
Wetertnm d Xatz Huildiog
i81 Quincy Semd, Suite 301
PoR Toameeod. WA 98368
Phone: (360) 379-3708 Faz: (360) 385-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
TffiS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLDOO-O42 Issued: 3121100 Parcel Number: 948000802
Job Address: 1550 Umatilla Avenue Zoning: RR=II Type: VV=N Occupancy:R-3 deck/U-1 uti[ity
Nature of Work: Construct utility/storaee carport and replace eaistina F-1 & F-2 deck
Owner: Bert Bereman Contractor: Same as Owner
GENERAL CONDITIONS APPLY -SEE LAST PAGE
u>~l1TTT72FTl TNCPF(''TT(1NC APPR()vF:nmATE
TEMPORARY EROSION &
SEDIMENT CONTROL
See General Condition No 2 ~ ,
FOOTING / /~
~
Setbacks ~~
DU
`
l/
Footings [
Forms
Reinforcement
Interior Footings
Deck Piers
LIFER
FOUNDATION -applicant proposes
foundation for 2-story deck to allow for
future change to enclosed habitable space
l~/~~~.~
Stem Wall.
Forms
Reinforcement
Anchor bolts w 2"x 2" x 3/16" washers
Vents
Crawl Access
Beam pockets (or beam to bear on
post/footing with positive connection post
to foundation stem wall)
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 3
Permit#BLD00-pp2
RE UIItED INSPECTIONS
APPROVED/DATE
SLAB
Monolithic Slab/Foundation at carport
Setbacks
Forms
Reinforcement
Positive Connection posts-to-slab
FLOOR FRAMING ~
~ ~
Girder ~~~
d~t 0!~
~I(~' d
Joists J l
Blocking
Shield under Posts
Positive Connection
Girder to Concrete
Treated Wood to Concrete
Anchor Bolts and Washers
Foundation Vents
FRAD7IlVG refer to engineering and
plans for engineered header, sheathing,
nailing and blocking
NOTE: Engineered roof truss plan shall be
on-site at time of inspection
Walls
Ceiling/Roof
Rafter/Truss Positive Connection
Windows U-factor
.40 or better for electric heat
.65 or better for other fuels
NFRC sticker must be on windows at time
Of 7nSpeCtlOn
Air Seal
FINAL
Check for 5" numbers
Smoke detectors required throughout per the
UBC: one in each sleeping room and in
each area/hallway leading to sleeping
rooms with a minimum of one on each floor
Final -Building
Call 48 hours before you dig for utility line locates
1-800.424-5555
Page 2 of 3
Permit & HLD00-042
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construMion; ca11385-2294, press 3. Measures shall include installation of silt fencing and
graveled construction entrance. Adjacent rights-of--way shall be kept free of dirt & debris. Soils exposed
during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be
permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is
responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3. A
7. Final Inspections are required prior to occupancy. A Certificate of Occupancy is required for anon-
residential project.
8. All building permits ezpire if no progress has been made within siz months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require review and approval prior to making changes in the field. Contact the Building
Department at 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 3