Loading...
HomeMy WebLinkAboutBLD00-042Waterman g Katz Building 781 Qumry Street, Suitc 301 P«t Townsend, WA 98368 Phone: (360)3793206 Fax: (360)385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLDOO-O42 R-1 Issued: 9105101 Parcel Number: 948000802 Job Address: 1550 Umatilla Avenue Zoning: RR=II Type: VV=N Occupancy:R-3 deck Nature of Work: Construct deck• replace gara¢e door replace (2) doors• replace (1) window• replace siding Owner: Bert Bereman Contractor: Same as Owner GENERAL CONDITIONS APPLY -SEE LAST PAGE RF.(1TITRFT) TNSPF,CTTnNS APPROVED/DATE FRAMING Window and Door U-factor .36 or better NFRC sticker must be on windows and doors at time of inspection Window Safety Glazing Air Seal Weather Resistive Barrier under siding FINAL Deck Guardrails Check for 5" numbers Smoke detectors required throughout per the UBC: one in each sleeping room and in each area/hallway leading to sleeping rooms with a minimum of one on each floor Final -Building GENERAL CONDITIONS I. Contractors working on this project are required to have a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 Prnnit#BI.DW-M2R-1 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca1138S2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance. Adjacent rights-of--way shall be kept free of dirt & debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294, press 3. A minimum of twenty-four hours notice is required. Public Works approval must be received urior to scheduline the BuildinE Department's final inspection. 7. Final Inspections are required prior to occupancy. A Certificate of Occupancy is required fora non- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call Tor at least one inspection per year to keep your building permit active. ~ 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 379-3208 rp for to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates I-800-424-5555 Page 2 of 2 A Wetertnm d Xatz Huildiog i81 Quincy Semd, Suite 301 PoR Toameeod. WA 98368 Phone: (360) 379-3708 Faz: (360) 385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD TffiS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLDOO-O42 Issued: 3121100 Parcel Number: 948000802 Job Address: 1550 Umatilla Avenue Zoning: RR=II Type: VV=N Occupancy:R-3 deck/U-1 uti[ity Nature of Work: Construct utility/storaee carport and replace eaistina F-1 & F-2 deck Owner: Bert Bereman Contractor: Same as Owner GENERAL CONDITIONS APPLY -SEE LAST PAGE u>~l1TTT72FTl TNCPF(''TT(1NC APPR()vF:nmATE TEMPORARY EROSION & SEDIMENT CONTROL See General Condition No 2 ~ , FOOTING / /~ ~ Setbacks ~~ DU ` l/ Footings [ Forms Reinforcement Interior Footings Deck Piers LIFER FOUNDATION -applicant proposes foundation for 2-story deck to allow for future change to enclosed habitable space l~/~~~.~ Stem Wall. Forms Reinforcement Anchor bolts w 2"x 2" x 3/16" washers Vents Crawl Access Beam pockets (or beam to bear on post/footing with positive connection post to foundation stem wall) Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 3 Permit#BLD00-pp2 RE UIItED INSPECTIONS APPROVED/DATE SLAB Monolithic Slab/Foundation at carport Setbacks Forms Reinforcement Positive Connection posts-to-slab FLOOR FRAMING ~ ~ ~ Girder ~~~ d~t 0!~ ~I(~' d Joists J l Blocking Shield under Posts Positive Connection Girder to Concrete Treated Wood to Concrete Anchor Bolts and Washers Foundation Vents FRAD7IlVG refer to engineering and plans for engineered header, sheathing, nailing and blocking NOTE: Engineered roof truss plan shall be on-site at time of inspection Walls Ceiling/Roof Rafter/Truss Positive Connection Windows U-factor .40 or better for electric heat .65 or better for other fuels NFRC sticker must be on windows at time Of 7nSpeCtlOn Air Seal FINAL Check for 5" numbers Smoke detectors required throughout per the UBC: one in each sleeping room and in each area/hallway leading to sleeping rooms with a minimum of one on each floor Final -Building Call 48 hours before you dig for utility line locates 1-800.424-5555 Page 2 of 3 Permit & HLD00-042 GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construMion; ca11385-2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance. Adjacent rights-of--way shall be kept free of dirt & debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3. A 7. Final Inspections are required prior to occupancy. A Certificate of Occupancy is required for anon- residential project. 8. All building permits ezpire if no progress has been made within siz months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 3