CONSTRUCTION PERMIT & INSPECTION RECORD
TffiS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLDOO-O34 Issued: 3/7100 Parcel Number: 989704301
Job Address: WATER & MADISON Zoning: C-III Type: VV=N Occupancy: B
Nature of Work: DOPS AFoot-Lean-To / Temaorarv Structure
Owner: John Sheehan
385-1708
Contractor: Same as Owner
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMTTS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
RF.nTTTRFT) TN~PF,(''TTnNS
APPROVED/DATE
FRAMING
FINAL
Final-Fire Department
Final-Health Department
Final-Building Department /y
~`~~~od C=(~
CaII 48 hours before you dig for utility line locates
1-800-424-5555
Page I of 2
BLD00-034
GENERAL CONDITIONS
1. Contractors working on this project are required to Gave a Labor & Industries contractor's
reeistration number and a Ciri busineag license. Failure to provide proof of this documentation prior to
work may result in job shut down while this is accomplished.
Z. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected
prior to beginning construction; ca11385-2294, press 3. Measures shall include installation of silt
fencing and graveled construction entrance (see attached details}. Adjacent rights-of--way shall be kept
free of dirt debris. Soils ezposed during construction shall be temporarily stabilized with mulching,
plastic sheeting, etc. Soils shall be permanently stabilized with sceding, plantings, sodding, etc. once
construction is complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficlencies noted by
required inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements Gave been completed and inspected. For Public Works inspection ca1138S2294, press 3.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a non
residential project.
8. All building permits expire if no progress has been made within siz months, or if no inspections are
done by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.